# Target Costing Allowable Cost Gap Calculator

> Source: https://netray.co/tools/target-costing-allowable-cost-gap-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Compute allowable cost from selling price and target margin, then see the gap and annual value of closing it.

## Category

cost-finance

## Audience

- Cost estimator
- Product manager
- Design engineer

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Target selling price per unit

**Key:** price

**Type:** number

**Default:** 240

**Min:** 0

**Step:** 1

**Help:** Price the market or customer will accept.

#### Required gross margin

**Key:** margin

**Type:** slider

**Default:** 28

**Min:** 0

**Max:** 70

**Step:** 1

**Unit:** %

**Help:** Margin on price, not markup on cost.

#### Current estimated unit cost

**Key:** cost

**Type:** number

**Default:** 188

**Min:** 0

**Step:** 1

#### Annual volume

**Key:** volume

**Type:** number

**Default:** 12000

**Min:** 0

**Step:** 100

**Unit:** units

**Outputs:**

#### Allowable (target) cost

**Key:** allowable

**Expr:** price * (1 - margin / 100)

**Format:** currency

**Primary:** true

**Description:** The most the unit can cost and still hit the margin.

#### Cost gap per unit

**Key:** gap

**Expr:** cost - allowable

**Format:** currency

**Primary:** true

**Description:** Positive means you must remove cost.

#### Reduction needed

**Key:** gap_pct

**Expr:** if(gt(cost, 0), gap / cost * 100, 0)

**Format:** percent

#### Margin at current cost

**Key:** cur_margin

**Expr:** if(gt(price, 0), (price - cost) / price * 100, 0)

**Format:** percent

#### Annual profit at stake

**Key:** annual_gap

**Expr:** gap * volume

**Format:** currency

**Chart:**

#### Allowable cost and gap versus required margin

**Type:** line

**X:** margin

**From:** 5

**To:** 45

**Steps:** 20

**Series:**

- allowable
- gap

## Content

**Intro:** Target costing flips the usual order: the market sets the price, the business sets the margin, and the difference is the cost you are allowed to spend. This calculator gives the allowable cost and the gap to your current estimate.

**Sections:**

#### What a cost savings tracking tool should record

**Body:** A useful cost savings tracking tool does more than add up claimed numbers. It ties every saving to a part or spend line, separates the baseline from the new cost, uses realistic volume, shows the one-time cost needed to get the saving, and tracks status so finance can see what is real versus planned. This worksheet covers those fields in one table. Spreadsheets like this suit a single plant or a program of a few dozen ideas. Larger procurement teams often move to a dedicated savings module or the ERP itself once they need approvals, multi-year phasing and audit trails.

**Bullets:**

- Baseline cost and new cost per unit, so the saving is traceable
- Annual volume you expect to buy or ship, not the theoretical maximum
- One-time cost and payback in months
- Status from idea through implemented, plus a target date
- Totals for annual saving, one-time cost and net first-year benefit

#### How to use it

**Body:** Enter the price you expect to win at, the gross margin you must earn and your current bottom-up cost. The allowable cost is price times one minus margin. If your estimate is above it, the gap is the cost to engineer out, and the annual figure multiplies that by volume so you can justify design, sourcing or process work. The chart shows how the allowable cost shrinks as the margin requirement rises, which helps in negotiation when a customer asks for a lower price.

#### Where the gap comes from

**Body:** Break the gap into material, labor, overhead and scrap and assign each a reduction owner. Design changes such as part count, tolerance relaxation or standard stock sizes usually carry the largest savings early, before tooling is cut. Sourcing and process changes come later and are smaller. Log each idea in a tracker so the gap closes on paper before launch, not after. Be honest about overhead: a gap closed by shifting overhead rates is an allocation change, not a real saving.

**Bullets:**

- Margin is on price: 28 percent margin is not 28 percent markup
- Include warranty and freight if the customer price is delivered
- Re-run when currency or commodity prices move

#### Common mistakes

**Body:** Teams often confuse markup with margin and understate the required price. A 30 percent markup on cost is only a 23 percent margin. Another mistake is treating a one-time gap as annual, or ignoring that target cost applies to the whole lifecycle including tooling amortization. Finally, avoid setting the target cost at the level the factory can already hit, since that defeats the purpose of the method. In your ERP, store the target cost as a separate cost version so actual standard cost can be compared with it.

**Cta:** If you keep target and current cost versions in your ERP, we can build a private view that tracks the gap by part automatically.

**Faq:**

#### What is the allowable cost formula?

**Answer:** Allowable cost equals selling price minus required profit, or price times (1 minus margin). Everything the product consumes, including materials, labor, overhead and amortized tooling, must fit inside this number to deliver the target margin.

#### Is target costing the same as cost-plus pricing?

**Answer:** No, they are opposites. Cost-plus starts with cost and adds margin to reach a price. Target costing starts with the market price, subtracts margin, and challenges the organization to meet the resulting cost.

#### Should the gap use full or variable cost?

**Answer:** Use the same basis as the margin you are targeting. Gross margin targets use full manufacturing cost. If you target contribution margin, use variable cost only and keep fixed cost coverage as a separate check.

#### How often should I recalculate it?

**Answer:** At each design gate and whenever price, volume or key input costs change. A short monthly review during development keeps the gap visible and prevents surprise margin erosion at launch.

## Search terms

target costing calculator, allowable cost formula, target cost gap, design to cost calculator, price minus margin equals cost, target costing example manufacturing, cost gap analysis

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
