# Thread Pitch Chart: Metric, UNC and UNF Sizes

> Source: https://netray.co/tools/thread-pitch-reference-metric-unc-unf
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Reference of thread pitch in mm, threads per inch and approximate thread depth for common metric, UNC and UNF sizes.

## Category

manufacturing

## Industry

Machining

## Audience

- CNC machinist
- CNC programmer
- Quality inspector

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Thread

**Key:** thread

**Type:** text

#### Series

**Key:** series

**Type:** text

#### Major dia (mm)

**Key:** major_mm

**Type:** number

**Format:** decimal

#### Pitch (mm)

**Key:** pitch_mm

**Type:** number

**Format:** decimal

#### Threads per inch

**Key:** tpi

**Type:** number

**Expr:** 25.4 / pitch_mm

**Format:** decimal

#### External thread depth (mm)

**Key:** depth_mm

**Type:** number

**Expr:** 0.6134 * pitch_mm

**Format:** decimal

**Rows:**

**Thread:** M3 x 0.5

**Series:** Metric coarse

**Major mm:** 3

**Pitch mm:** 0.5

**Thread:** M4 x 0.7

**Series:** Metric coarse

**Major mm:** 4

**Pitch mm:** 0.7

**Thread:** M5 x 0.8

**Series:** Metric coarse

**Major mm:** 5

**Pitch mm:** 0.8

**Thread:** M6 x 1

**Series:** Metric coarse

**Major mm:** 6

**Pitch mm:** 1

**Thread:** M8 x 1.25

**Series:** Metric coarse

**Major mm:** 8

**Pitch mm:** 1.25

**Thread:** M10 x 1.5

**Series:** Metric coarse

**Major mm:** 10

**Pitch mm:** 1.5

**Thread:** M12 x 1.75

**Series:** Metric coarse

**Major mm:** 12

**Pitch mm:** 1.75

**Thread:** M16 x 2

**Series:** Metric coarse

**Major mm:** 16

**Pitch mm:** 2

**Thread:** M20 x 2.5

**Series:** Metric coarse

**Major mm:** 20

**Pitch mm:** 2.5

**Thread:** M24 x 3

**Series:** Metric coarse

**Major mm:** 24

**Pitch mm:** 3

**Thread:** M30 x 3.5

**Series:** Metric coarse

**Major mm:** 30

**Pitch mm:** 3.5

**Thread:** M36 x 4

**Series:** Metric coarse

**Major mm:** 36

**Pitch mm:** 4

**Thread:** M8 x 1

**Series:** Metric fine

**Major mm:** 8

**Pitch mm:** 1

**Thread:** M10 x 1.25

**Series:** Metric fine

**Major mm:** 10

**Pitch mm:** 1.25

**Thread:** M12 x 1.25

**Series:** Metric fine

**Major mm:** 12

**Pitch mm:** 1.25

**Thread:** M12 x 1.5

**Series:** Metric fine

**Major mm:** 12

**Pitch mm:** 1.5

**Thread:** M16 x 1.5

**Series:** Metric fine

**Major mm:** 16

**Pitch mm:** 1.5

**Thread:** M20 x 1.5

**Series:** Metric fine

**Major mm:** 20

**Pitch mm:** 1.5

**Thread:** M24 x 2

**Series:** Metric fine

**Major mm:** 24

**Pitch mm:** 2

**Thread:** #10-24

**Series:** UNC

**Major mm:** 4.826

**Pitch mm:** 1.0583

**Thread:** 1/4-20

**Series:** UNC

**Major mm:** 6.35

**Pitch mm:** 1.27

**Thread:** 5/16-18

**Series:** UNC

**Major mm:** 7.938

**Pitch mm:** 1.4111

**Thread:** 3/8-16

**Series:** UNC

**Major mm:** 9.525

**Pitch mm:** 1.5875

**Thread:** 1/2-13

**Series:** UNC

**Major mm:** 12.7

**Pitch mm:** 1.9538

**Thread:** 5/8-11

**Series:** UNC

**Major mm:** 15.875

**Pitch mm:** 2.3091

**Thread:** 3/4-10

**Series:** UNC

**Major mm:** 19.05

**Pitch mm:** 2.54

**Thread:** 1-8

**Series:** UNC

**Major mm:** 25.4

**Pitch mm:** 3.175

**Thread:** #10-32

**Series:** UNF

**Major mm:** 4.826

**Pitch mm:** 0.7938

**Thread:** 1/4-28

**Series:** UNF

**Major mm:** 6.35

**Pitch mm:** 0.9071

**Thread:** 5/16-24

**Series:** UNF

**Major mm:** 7.938

**Pitch mm:** 1.0583

**Thread:** 3/8-24

**Series:** UNF

**Major mm:** 9.525

**Pitch mm:** 1.0583

**Thread:** 1/2-20

**Series:** UNF

**Major mm:** 12.7

**Pitch mm:** 1.27

**Thread:** 5/8-18

**Series:** UNF

**Major mm:** 15.875

**Pitch mm:** 1.4111

**Thread:** 3/4-16

**Series:** UNF

**Major mm:** 19.05

**Pitch mm:** 1.5875

**Thread:** 1-12

**Series:** UNF

**Major mm:** 25.4

**Pitch mm:** 2.1167

**Notes:** Pitch is the distance between adjacent thread crests. Threads per inch is computed as 25.4 divided by pitch in mm. Thread depth uses the ISO and Unified external thread depth of about 0.6134 times pitch for a rounded root; sharp-V depth is larger and your drawing governs.

## Content

**Intro:** Thread pitch is the number that sets feed, thread mill path, tap choice and gauge selection, and it is expressed differently in metric and inch work. This chart puts metric coarse, metric fine, UNC and UNF sizes in one table with pitch in millimetres, threads per inch and an approximate thread depth.

**Sections:**

#### How to use the chart

**Body:** Search by size or series to jump to the row you need. Metric rows list pitch directly, while inch rows list pitch converted to millimetres so you can compare across systems and program a CNC lathe in a single unit. The threads per inch column is computed from pitch, which is useful when a drawing gives mm and a pitch gauge is marked in TPI. Export the result to Excel to drop a pitch table into a program sheet or tooling document.

**Bullets:**

- Filter on UNC or UNF to see inch series
- Use pitch in mm for G76 or G32 thread cycles
- Use TPI when reading a pitch gauge

#### Definitions and conversions

**Body:** Pitch is the axial distance from one thread crest to the next. For single-start threads, lead equals pitch, so each spindle revolution advances the tool by one pitch. Threads per inch equals 25.4 divided by pitch in millimetres, and the reverse also holds. Coarse series suits general fastening and softer materials, while fine series gives more adjustment resolution and better resistance to loosening in thin walls and vibration environments.

#### Using pitch in programming

**Body:** On a lathe, the feed per revolution during threading equals the pitch for a single-start thread, so the pitch in this chart is the F value on a G32 block or the F or E word in a G76 cycle depending on the controller. The thread depth column indicates a starting point for total radial infeed; many programmers apply a small allowance to account for tool nose radius and crest truncation. Always confirm with the controller manual and the drawing tolerance class.

#### Common mistakes

**Body:** Frequent errors include confusing 1/2-13 with 1/2-20 when the callout only says 1/2 inch, entering TPI where the control expects pitch in mm, and assuming 24 TPI threads are the same in 5/16 and 3/8 sizes when only the pitch matches. Check both major diameter and pitch before cutting or ordering gauges.

**Bullets:**

- Check both diameter and pitch
- Do not enter TPI in a pitch field
- Confirm the thread class and hand

**Cta:** If thread callouts and tooling live across drawings and an ERP, we can help connect them so planners and machinists see the same data.

**Faq:**

#### How do I convert threads per inch to pitch in mm?

**Answer:** Divide 25.4 by the threads per inch. A 20 TPI thread has a pitch of 25.4 divided by 20, which is 1.27 mm. To go the other way, divide 25.4 by the pitch in mm to get threads per inch.

#### What is the pitch of M10 coarse?

**Answer:** M10 coarse has a pitch of 1.5 mm, and the common fine pitch for M10 is 1.25 mm. The callout M10 x 1.5 includes the pitch, while a plain M10 in most contexts means the coarse pitch.

#### What is the difference between UNC and UNF?

**Answer:** Both are Unified inch threads with a 60 degree profile. UNC is coarse with fewer threads per inch and UNF is fine with more. For example 1/4-20 is UNC and 1/4-28 is UNF.

#### Is thread depth the same as thread height?

**Answer:** Not exactly. Basic thread height is about 0.5413 times pitch, while the practical external thread depth with a rounded root is nearer 0.6134 times pitch. The value shown here is the practical depth, so confirm on the drawing.

## Search terms

thread pitch chart, metric thread pitch chart, UNC UNF thread pitch, threads per inch to pitch mm, M10 thread pitch, thread pitch chart pdf, coarse and fine thread chart, thread depth chart

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
