# Infor VISUAL Costing Method Reference

> Source: https://netray.co/tools/visual-costing-method-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A quick reference to the costing methods and cost elements used in VISUAL, how each values inventory, where variances appear and when each fits.

## Category

cost-finance

## Erp

Infor VISUAL

## Industry

Discrete Manufacturing

## Audience

- Cost accountant
- Controller
- VISUAL administrator

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Group

**Key:** group

**Type:** text

#### Term

**Key:** term

**Type:** text

#### How it works

**Key:** how

**Type:** text

#### What to watch

**Key:** watch

**Type:** text

**Rows:**

#### Standard

**Group:** Costing method

**How:** Inventory is valued at a fixed cost per unit set by a rollup. Differences between actual and standard are recorded as variances.

**Watch:** Standards go stale. Refresh them on a set schedule and explain large variances.

#### Average

**Group:** Costing method

**How:** Inventory is valued at a running average of what was paid or produced. The average changes with each receipt.

**Watch:** Back dated receipts and corrections can move the average in surprising ways.

#### FIFO

**Group:** Costing method

**How:** Oldest layers of cost are consumed first. Issues relieve inventory at the cost of the earliest receipts.

**Watch:** Needs layer detail to be kept accurate. Costs shift when old layers are used up.

#### LIFO

**Group:** Costing method

**How:** Newest layers of cost are consumed first. Issues relieve inventory at the most recent costs.

**Watch:** Check your local accounting and tax rules before using it, as acceptance differs by country.

#### Method set per part

**Group:** Costing method

**How:** VISUAL allows the costing method to be chosen at the part level rather than only company wide.

**Watch:** Mixed methods are legal but make reports harder to compare. Document why each part uses its method.

#### Material

**Group:** Cost element

**How:** Cost of purchased and raw components consumed by the order.

**Watch:** Check unit of measure conversions on purchased parts, a common source of wrong costs.

#### Labor

**Group:** Cost element

**How:** Cost of direct labor, from run time and setup time multiplied by a labor rate.

**Watch:** Rate tables must match the resource or employee, or labor is under or over stated.

#### Burden

**Group:** Cost element

**How:** Overhead applied to the order, often as a rate per labor or machine hour.

**Watch:** Review burden rates when volume or overhead spending changes materially.

#### Service or outside processing

**Group:** Cost element

**How:** Cost of work done by outside vendors, such as plating or heat treat.

**Watch:** Make sure vendor invoices are matched so the actual replaces the estimate.

#### Material usage variance

**Group:** Variance

**How:** Difference between quantity planned and quantity issued, valued at cost.

**Watch:** Persistent variance points to scrap, wrong bills or unrecorded substitutions.

#### Labor efficiency variance

**Group:** Variance

**How:** Difference between standard hours and hours actually reported.

**Watch:** Missing labor tickets create fake favorable variance.

#### Purchase price variance

**Group:** Variance

**How:** Difference between the standard cost of a purchased part and the price actually paid.

**Watch:** Large PPV means the standard needs updating or price discipline has slipped.

#### Cost rollup

**Group:** Process

**How:** Calculates part costs from bills of material, routings and rates, from the lowest level up.

**Watch:** Run it after changing bills, routings or rates, and review before posting to standard.

#### Work order close

**Group:** Process

**How:** Finalizes costs on a work order and posts remaining differences to variance.

**Watch:** Close only when final labor and material have been posted.

#### Inventory revaluation

**Group:** Process

**How:** Changes the value of stock on hand when a standard cost is updated.

**Watch:** Coordinate timing with finance so the period close is not disturbed.

**Notes:** Method names and available options depend on your VISUAL version and configuration. Treat this as a conceptual guide and confirm exact behavior and accounting treatment with your controller and auditor.

## Content

**Intro:** Costing questions in VISUAL usually come down to which method a part uses and where its cost differences show up. This reference puts the methods, cost elements and variances side by side so you can find an answer quickly.

**Sections:**

#### How to use the reference

**Body:** Search for a term such as standard, FIFO, burden or variance and read the how it works and what to watch columns. Use the group filter in your head: costing methods first, then the cost elements that make up a part cost, then the variances that show differences, then the processes that change cost. Export to Excel or PDF to give your new cost accountant or a project team a shared glossary.

#### Choosing a costing method

**Body:** Standard costing suits repetitive manufacturing with stable processes, because variances tell you where actual performance departs from plan. Average costing is simpler and smooths price swings, so it fits distribution or lower volume mixes. FIFO and LIFO track layers and are used when accounting rules or pricing behavior require it. VISUAL lets the method be set per part, but the more methods you mix, the harder reconciliation becomes. Make the choice with your controller and your auditor, not only the system administrator.

#### Reading cost elements and variances

**Body:** A part cost is normally split into material, labor, burden and service. A work order collects actual amounts under the same headings, and the differences from standard appear as variances: material usage, labor efficiency, purchase price and so on. When a variance looks wrong, work backward. Check the posting that produced it, such as a missing labor ticket or a wrong unit of measure, before changing the standard.

**Bullets:**

- Material variance: check bills and issues.
- Labor variance: check tickets and rates.
- Purchase price variance: check standard versus invoice.
- Burden: check rate basis and volume.

#### Common mistakes

**Body:** Common errors include updating standards without revaluing inventory on a planned date, closing work orders before the last labor ticket, and leaving burden rates unchanged after a large change in volume. A related problem is comparing costs between parts that use different methods. Write down your policy: method per part class, standard update cadence, and who approves rollups.

**Cta:** If you want costing variances explained automatically, with the underlying transactions listed, we can build a read-only analysis over your VISUAL data.

**Faq:**

#### Can different parts use different costing methods in VISUAL?

**Answer:** The costing method can be chosen at the part level in many VISUAL setups. It is allowed, but mixing methods complicates comparisons and reconciliation. Agree a policy with finance and document why exceptions exist.

#### What is the difference between standard and average cost?

**Answer:** Standard cost is a fixed planned value, and differences from actual are posted as variances. Average cost updates as receipts arrive, so there are fewer variances but the unit cost moves over time. Standard is better for control, average for simplicity.

#### When should I run a cost rollup?

**Answer:** After changing bills of material, routings, rates or purchased part costs, and on a planned schedule such as yearly or quarterly. Review the results before posting to standard and coordinate revaluation with your period close.

#### Does this match my accounting rules?

**Answer:** It is a conceptual reference only. Accounting treatment, including LIFO acceptance, depends on your country and standards. Confirm choices with your controller and external auditor before changing methods.

## Search terms

infor visual costing methods, visual manufacturing standard cost vs average cost, visual fifo lifo costing, visual work order cost elements, visual costing material labor burden, visual manufacturing cost variance, visual inventory valuation, visual standard cost rollup

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
