# Weibull Reliability and B10 Life Calculator

> Source: https://netray.co/tools/weibull-reliability-b10-life-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Enter Weibull shape and scale to get reliability at a mission time, the B-life at a chosen failure percentage and the instantaneous hazard rate.

## Category

engineering-plm

## Audience

- Reliability engineer
- Design engineer
- Maintenance engineer

## Tool

**Kind:** calculator

**Inputs:**

#### Shape parameter (beta)

**Key:** beta

**Type:** number

**Default:** 2.2

**Min:** 0.5

**Max:** 10

**Step:** 0.1

**Help:** Below 1 is infant mortality, near 1 is random failure, above 1 is wear-out.

#### Scale parameter (eta)

**Key:** eta

**Type:** number

**Default:** 10000

**Min:** 1

**Step:** 100

**Unit:** hours

**Help:** Characteristic life: time by which 63.2% of units have failed.

#### Mission time

**Key:** t

**Type:** number

**Default:** 2000

**Min:** 100

**Step:** 100

**Unit:** hours

#### B-life failure percentage

**Key:** p

**Type:** select

**Default:** 10

**Options:**

##### B1 (1%)

**Value:** 1

##### B5 (5%)

**Value:** 5

##### B10 (10%)

**Value:** 10

##### B50 (median)

**Value:** 50

**Outputs:**

#### Reliability at mission time

**Key:** rel

**Expr:** exp(0 - pow(t / eta, beta)) * 100

**Format:** percent

**Primary:** true

#### Probability of failure by mission time

**Key:** unrel

**Expr:** 100 - rel

**Format:** percent

#### B-life (time to selected failure percentage)

**Key:** blife

**Expr:** eta * pow(0 - ln(1 - p / 100), 1 / beta)

**Format:** number

**Primary:** true

**Description:** In the same unit as eta.

#### Hazard rate at mission time (per hour)

**Key:** hazard

**Expr:** beta / eta * pow(t / eta, beta - 1)

**Format:** decimal

#### Failure regime (1 = wear-out, 0 = not)

**Key:** regime

**Expr:** if(gt(beta,1.05),1,0)

**Format:** integer

**Chart:**

#### Reliability (%) vs mission time

**Type:** line

**X:** t

**From:** 100

**To:** 20000

**Steps:** 40

**Series:**

- rel

**Disclaimer:** Two-parameter Weibull with no failure-free period. Parameters should come from a fitted life data set with stated confidence.

## Content

**Intro:** Weibull analysis is the standard way to describe life data. If you already have a shape and scale from your data, this calculator gives reliability, B-life and hazard rate in seconds.

**Sections:**

#### How to use the calculator

**Body:** Enter beta and eta from your fitted data, then a mission time in the same unit as eta. Choose which B-life you need; B10 is the time by which 10 percent of units are expected to fail and is common for bearings and rated components. The chart sweeps mission time to show how reliability decays and where it crosses your requirement.

#### The formulas

**Body:** Reliability is R(t) = exp(-(t/eta)^beta). The B-life for failure fraction F is t = eta times (-ln(1-F))^(1/beta). The hazard rate is h(t) = (beta/eta)(t/eta)^(beta-1). When beta equals 1 the model reduces to the exponential distribution with constant hazard. At t = eta, reliability is about 36.8 percent regardless of beta.

**Bullets:**

- Beta below 1: failure rate falls with time (infant mortality).
- Beta near 1: random failures, age does not matter.
- Beta above 1: wear-out, preventive replacement can pay off.

#### Linking to FMEA occurrence

**Body:** A failure probability at a mission time supports an occurrence rating for a DFMEA cause. State the mission profile and confidence in the rating justification. For a repairable system, Weibull on first failures differs from system-level rates, so keep the data set consistent with the question you are asking.

#### Common mistakes

**Body:** Fitting a Weibull to too few failures gives wide confidence bands, so the single-point answer here may look far more precise than it is. Mixing failure modes in one data set often produces a beta near 1 that hides a wear-out mode. Also remember to treat suspended (still running) units correctly when fitting.

**Cta:** Netray can pull run hours and failure events from maintenance and quality records in your ERP to build the life data set for this analysis.

**Faq:**

#### What does B10 mean?

**Answer:** B10 life is the time by which 10 percent of a population is expected to fail, so 90 percent are still working. It is widely used for bearings and rated mechanical parts.

#### What if beta is exactly 1?

**Answer:** The distribution becomes exponential with constant failure rate 1/eta. Reliability then equals exp(-t/eta) and MTBF equals eta.

#### Can I use cycles or miles instead of hours?

**Answer:** Yes. Use one unit consistently for eta and mission time. The hazard output will then be per that unit.

#### How do I get beta and eta?

**Answer:** Fit them from failure and suspension data using median rank regression or maximum likelihood in a statistics tool, then enter the fitted values here.

## Search terms

weibull reliability calculator, b10 life calculator, weibull b life, weibull shape scale parameter, reliability at mission time, weibull hazard rate, bearing b10 life weibull, weibull analysis calculator

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
