# Western Electric and Nelson Rules for Control Charts

> Source: https://netray.co/tools/western-electric-nelson-rules-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Look up every Western Electric and Nelson run rule with its zone, point count and the process cause it usually signals.

## Category

quality

## Industry

Discrete Manufacturing

## Audience

- Quality engineer
- Process engineer
- Six Sigma Green Belt

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Rule set

**Key:** set

**Type:** text

#### Rule

**Key:** rule

**Type:** text

#### Pattern that signals

**Key:** pattern

**Type:** text

#### Zone or limit used

**Key:** zone

**Type:** text

#### Typical process meaning

**Key:** cause

**Type:** text

**Rows:**

#### Large special cause: wrong setup, broken tool, bad lot of material

**Set:** Western Electric

**Rule:** WE 1

**Pattern:** One point beyond the 3 sigma control limit

**Zone:** Beyond Zone A

#### Shift in the mean that is still small enough to hide inside the limits

**Set:** Western Electric

**Rule:** WE 2

**Pattern:** Two out of three consecutive points beyond 2 sigma on the same side

**Zone:** Zone A or beyond

#### Sustained moderate shift, for example a new material batch

**Set:** Western Electric

**Rule:** WE 3

**Pattern:** Four out of five consecutive points beyond 1 sigma on the same side

**Zone:** Zone B or beyond

#### Small persistent shift in the process average

**Set:** Western Electric

**Rule:** WE 4

**Pattern:** Eight consecutive points on the same side of the center line

**Zone:** Zone C or beyond

#### Single large disturbance or a measurement or data entry error

**Set:** Nelson

**Rule:** Nelson 1

**Pattern:** One point more than 3 sigma from the center line

**Zone:** Beyond Zone A

#### Shift in the process mean

**Set:** Nelson

**Rule:** Nelson 2

**Pattern:** Nine points in a row on the same side of the center line

**Zone:** Any, one side

#### Trend such as tool wear, temperature drift or coolant dilution

**Set:** Nelson

**Rule:** Nelson 3

**Pattern:** Six points in a row steadily increasing or steadily decreasing

**Zone:** Any

#### Over-adjustment of the process or two alternating sources, such as two spindles or two operators

**Set:** Nelson

**Rule:** Nelson 4

**Pattern:** Fourteen points in a row alternating up and down

**Zone:** Any

#### Early sign of a mean shift

**Set:** Nelson

**Rule:** Nelson 5

**Pattern:** Two out of three points more than 2 sigma from the center line, same side

**Zone:** Zone A or beyond

#### Moderate sustained shift or trend starting

**Set:** Nelson

**Rule:** Nelson 6

**Pattern:** Four out of five points more than 1 sigma from the center line, same side

**Zone:** Zone B or beyond

#### Stratification: subgroups mix several streams, or limits are too wide for the data

**Set:** Nelson

**Rule:** Nelson 7

**Pattern:** Fifteen points in a row within 1 sigma of the center line, either side

**Zone:** Zone C only

#### Mixture: data from two populations with no points near the center

**Set:** Nelson

**Rule:** Nelson 8

**Pattern:** Eight points in a row more than 1 sigma from the center line, either side

**Zone:** Outside Zone C, both sides

#### Where about 68 percent of points fall for a stable normal process

**Set:** Zones

**Rule:** Zone C

**Pattern:** Area between the center line and 1 sigma on each side

**Zone:** 0 to 1 sigma

#### About 27 percent of points fall in B, split across both sides

**Set:** Zones

**Rule:** Zone B

**Pattern:** Area between 1 and 2 sigma on each side

**Zone:** 1 to 2 sigma

#### About 4.3 percent of points fall in A, split across both sides

**Set:** Zones

**Rule:** Zone A

**Pattern:** Area between 2 and 3 sigma on each side

**Zone:** 2 to 3 sigma

#### Mean shift; shorter run than Nelson 2, used by some SPC manuals and software defaults

**Set:** Common variant

**Rule:** 7-point run

**Pattern:** Seven consecutive points on one side of the center line

**Zone:** Any, one side

#### Drift; more sensitive than Nelson 3 but with more false alarms

**Set:** Common variant

**Rule:** 7-point trend

**Pattern:** Seven consecutive points all rising or all falling

**Zone:** Any

#### About 0.27 percent of points, roughly 1 in 370 points, will be flagged by chance

**Set:** Reference

**Rule:** False alarm rate

**Pattern:** Rule 1 alone with a stable normal process

**Zone:** 3 sigma limits

**Notes:** Zone percentages assume a stable, approximately normal process. Applying all eight Nelson rules together raises the false alarm rate, so most plants choose a subset.

## Content

**Intro:** Control chart rules turn a plot of points into a decision: leave the process alone or go look for a special cause. This table lists the four Western Electric rules, the eight Nelson rules and the zone definitions side by side so you can pick a rule set and explain it to operators.

**Sections:**

#### How to use the table

**Body:** Type a word in the search box such as trend, shift or mixture to find the matching rule and its likely cause. Choose one rule set for each chart and write it in the control plan so every shift reacts the same way. Export to Excel or PDF to paste into a work instruction or SPC training deck. Zones are measured from the center line in units of sigma, where sigma is the standard error of the plotted statistic, not the spec tolerance.

**Bullets:**

- Western Electric is a small set of four rules, easy to teach on the floor
- Nelson adds trend, alternating, stratification and mixture patterns
- Always compute zones from control limits, never from specification limits

#### Where the rules come from

**Body:** The Western Electric rules were published in the Western Electric Statistical Quality Control Handbook and rely on dividing the area between the limits into three zones per side. Lloyd Nelson later published a numbered list of eight tests in the Journal of Quality Technology. Both sets are sensitivity tests for non-random patterns. Each added rule catches smaller shifts faster, but it also adds false alarms, so the rule set is a trade-off between detection speed and unnecessary investigation.

#### Reading a signal correctly

**Body:** A rule violation is evidence of a special cause, not proof. Check the measurement first: was the gauge calibrated, was the subgroup entered correctly, did the part come from a different fixture? Then look at what changed at the first point of the pattern, not at the last point that triggered the alarm. For example, a Nelson 3 trend of six rising points that began after a tool change points to wear on that tool. Record the cause on the chart so the next signal is faster to diagnose.

#### Common mistakes

**Body:** Many teams switch on every rule in the software and drown in alerts. Others apply run rules to charts where the data are autocorrelated, such as a tank temperature sampled every minute, which makes rules 2, 3 and 7 fire constantly. Another frequent error is recalculating limits after each out-of-control point instead of investigating it. Limits should be revised only after a verified, permanent process change.

**Bullets:**

- Pick two or three rules per chart and document them
- Do not apply run rules to strongly autocorrelated data
- Do not delete signal points without a documented assignable cause

**Cta:** If your control chart data sits in an ERP or QMS and nobody reviews the signals, Netray can help wire rule checks to the live data with read-only access.

**Faq:**

#### Which is better, Western Electric or Nelson rules?

**Answer:** Neither is universally better. Western Electric has fewer rules and fewer false alarms, so it suits operator-level charts. Nelson adds patterns for trends, alternation and stratification, which help engineers diagnose a process. Many plants use rule 1 plus one or two run rules on each chart.

#### How many false alarms will the rules create?

**Answer:** Rule 1 alone flags about 1 in 370 points on a stable normal process. Each additional rule adds to that rate, and using all eight Nelson rules together can raise it to several percent of points. That is why selecting a subset matters.

#### Do these rules work on individuals charts?

**Answer:** Yes, but be careful. Individuals charts are more sensitive to non-normal data and autocorrelation, which cause false signals on run rules. Check normality and consider a transformation or a different chart before adding many rules.

#### Does a rule violation mean I must scrap parts?

**Answer:** No. A control chart signal says the process changed, not that parts are out of specification. Compare the data with specification limits and your containment procedure to decide on part disposition separately.

## Search terms

western electric rules, nelson rules control chart, control chart rules table, spc out of control rules, run rules spc, western electric zone rules, nelson rules 1 to 8, control chart zones a b c

---