# Windows Security Event ID Reference for Threat Hunting

> Source: https://netray.co/tools/windows-security-event-id-reference-for-threat-hunting
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

The event IDs a small security team should log and alert on, from failed logons and new services to cleared logs and PowerShell script blocks.

## Category

developer

## Industry

Manufacturing

## Audience

- IT security lead
- SOC analyst
- System administrator

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Event ID

**Key:** id

**Type:** text

#### Log

**Key:** log

**Type:** text

#### Meaning

**Key:** meaning

**Type:** text

#### Why it matters

**Key:** why

**Type:** text

**Rows:**

**Id:** 1102

**Log:** Security

**Meaning:** The audit log was cleared

**Why:** Attackers clear logs to hide activity. Alert on every occurrence.

**Id:** 104

**Log:** System

**Meaning:** An event log was cleared

**Why:** Same intent as 1102 for other logs.

**Id:** 4624

**Log:** Security

**Meaning:** An account logged on successfully

**Why:** Baseline for lateral movement. Check logon type 3 and 10.

**Id:** 4625

**Log:** Security

**Meaning:** An account failed to log on

**Why:** Bursts indicate password guessing or spraying.

**Id:** 4634

**Log:** Security

**Meaning:** An account was logged off

**Why:** Pairs with 4624 to build session length.

**Id:** 4647

**Log:** Security

**Meaning:** User initiated logoff

**Why:** Interactive session end.

**Id:** 4648

**Log:** Security

**Meaning:** Logon attempted using explicit credentials

**Why:** Common with runas, remote admin tools and pass-the-hash tooling.

**Id:** 4657

**Log:** Security

**Meaning:** A registry value was modified

**Why:** Persistence changes. Needs registry auditing enabled.

**Id:** 4663

**Log:** Security

**Meaning:** An attempt was made to access an object

**Why:** File access on sensitive shares when auditing is enabled.

**Id:** 4672

**Log:** Security

**Meaning:** Special privileges assigned to a new logon

**Why:** Marks administrator-level logons.

**Id:** 4688

**Log:** Security

**Meaning:** A new process was created

**Why:** Needs command line auditing for full value.

**Id:** 4697

**Log:** Security

**Meaning:** A service was installed on the system

**Why:** Common for malware and remote execution tools.

**Id:** 4698

**Log:** Security

**Meaning:** A scheduled task was created

**Why:** Frequent persistence method.

**Id:** 4699

**Log:** Security

**Meaning:** A scheduled task was deleted

**Why:** Cleanup after an attack.

**Id:** 4702

**Log:** Security

**Meaning:** A scheduled task was updated

**Why:** Tampering with existing jobs.

**Id:** 4719

**Log:** Security

**Meaning:** System audit policy was changed

**Why:** Attackers disable auditing before acting.

**Id:** 4720

**Log:** Security

**Meaning:** A user account was created

**Why:** Rogue or backdoor accounts.

**Id:** 4722

**Log:** Security

**Meaning:** A user account was enabled

**Why:** Dormant accounts brought back.

**Id:** 4723

**Log:** Security

**Meaning:** An attempt was made to change an account password

**Why:** User initiated password change.

**Id:** 4724

**Log:** Security

**Meaning:** An attempt was made to reset an account password

**Why:** Admin reset. Check who did it.

**Id:** 4725

**Log:** Security

**Meaning:** A user account was disabled

**Why:** Leaver process evidence.

**Id:** 4726

**Log:** Security

**Meaning:** A user account was deleted

**Why:** Account removal or cover-up.

**Id:** 4728

**Log:** Security

**Meaning:** A member was added to a security-enabled global group

**Why:** Watch Domain Admins and similar.

**Id:** 4732

**Log:** Security

**Meaning:** A member was added to a security-enabled local group

**Why:** Watch local Administrators.

**Id:** 4738

**Log:** Security

**Meaning:** A user account was changed

**Why:** Flags such as password never expires.

**Id:** 4740

**Log:** Security

**Meaning:** A user account was locked out

**Why:** Spray or brute force signal.

**Id:** 4756

**Log:** Security

**Meaning:** A member was added to a security-enabled universal group

**Why:** Privileged group changes.

**Id:** 4768

**Log:** Security

**Meaning:** A Kerberos authentication ticket (TGT) was requested

**Why:** Baseline for Kerberos activity.

**Id:** 4769

**Log:** Security

**Meaning:** A Kerberos service ticket was requested

**Why:** Spikes can indicate Kerberoasting.

**Id:** 4771

**Log:** Security

**Meaning:** Kerberos pre-authentication failed

**Why:** Bad passwords against domain accounts.

**Id:** 4776

**Log:** Security

**Meaning:** The computer attempted to validate credentials (NTLM)

**Why:** NTLM use should be rare and explainable.

**Id:** 4800

**Log:** Security

**Meaning:** The workstation was locked

**Why:** Session context for investigations.

**Id:** 4801

**Log:** Security

**Meaning:** The workstation was unlocked

**Why:** Session context for investigations.

**Id:** 5140

**Log:** Security

**Meaning:** A network share object was accessed

**Why:** Share access patterns, detects mass enumeration.

**Id:** 5145

**Log:** Security

**Meaning:** A network share object was checked for access

**Why:** Detailed share and file access, noisy.

**Id:** 6416

**Log:** Security

**Meaning:** A new external device was recognized

**Why:** USB use on machines and engineering stations.

**Id:** 7045

**Log:** System

**Meaning:** A new service was installed

**Why:** High value for ransomware and remote tools.

**Id:** 4103

**Log:** PowerShell/Operational

**Meaning:** PowerShell module logging

**Why:** Pipeline execution details.

**Id:** 4104

**Log:** PowerShell/Operational

**Meaning:** PowerShell script block logging

**Why:** Captures deobfuscated script content.

**Id:** 1

**Log:** Sysmon/Operational

**Meaning:** Sysmon process creation

**Why:** Rich process data with hashes and parent.

**Id:** 3

**Log:** Sysmon/Operational

**Meaning:** Sysmon network connection

**Why:** Process to destination mapping.

**Id:** 11

**Log:** Sysmon/Operational

**Meaning:** Sysmon file created

**Why:** Dropped payloads and ransom notes.

**Notes:** Many of these events appear only when the matching audit subcategory is enabled by group policy. Test in a lab, size the event log, and forward to a central collector so a compromised host cannot erase the evidence.

## Content

**Intro:** A small security team cannot read every log line, so the useful question is which event IDs deserve attention. This reference lists the Windows events most often used to catch intrusions, with the reason each matters.

**Sections:**

#### How to use it

**Body:** Filter by ID or by phrase such as service, group or cleared. Use the table to decide which audit policies to enable and which events to forward to your SIEM or collector. Start with the handful that are rarely benign: 1102, 104, 4719, 4697, 7045, 4720 and privileged group changes. Add the noisy ones, such as 4624 and 4688, only when you have storage and a use for them.

**Bullets:**

- Alert on 1102 and 104 every time
- Alert on new services and scheduled tasks on servers
- Review 4728 and 4732 for privileged groups

#### Make the events exist

**Body:** Many events are silent by default. Advanced audit policy must enable process creation with command line capture, account management, logon, and policy change subcategories. PowerShell script block logging and Sysmon add depth on hosts that matter, such as ERP and file servers and engineering workstations. Without these settings you have a table of events that never fire.

#### Plant floor considerations

**Body:** Engineering workstations, HMI servers and historians often run old Windows versions with small default log sizes. Raise log sizes, forward events off the host and keep a copy outside the plant network where possible. Isolated hosts that cannot forward should have logs collected on a schedule by an approved method.

#### Common mistakes

**Body:** Logging everything and alerting on nothing is the main one. A second is alerting on 4625 per event instead of per source and time window, which floods the queue. Count failures per account and source over minutes and alert on thresholds. Finally, do not trust local logs only: ransomware operators clear them.

**Cta:** If you want a small, tested detection set for your Windows estate and plant servers, Netray can help build it with your team.

**Faq:**

#### Which event IDs should I alert on first?

**Answer:** Start with cleared logs (1102, 104), audit policy changes (4719), new services (4697, 7045), new accounts (4720) and additions to privileged groups (4728, 4732). They are rare in a healthy environment and high in value.

#### Why does 4688 show no command line?

**Answer:** Command line capture is off by default. Enable the audit setting that includes command line in process creation events through group policy, then size the log for the volume.

#### What does logon type 3 or 10 mean in 4624?

**Answer:** Type 3 is a network logon such as a file share, type 10 is remote interactive such as RDP. Unexpected 3 or 10 logons to servers from workstations deserve a look.

#### Do I need Sysmon?

**Answer:** Not to start. Native events cover a lot. Sysmon adds hashes, parent processes and network connections per process, which helps on the servers and workstations you care about most.

## Search terms

windows event id 4625 failed logon, event id 4624 logon types, event id 1102 audit log cleared, windows event ids to monitor, event id 4688 process creation, event id 7045 service installed, sysmon event ids list

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
