# X12 Envelope Reference: ISA, GS, ST, SE, GE and IEA Elements

> Source: https://netray.co/tools/x12-envelope-isa-gs-st-element-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Every envelope element with its data type, minimum and maximum length and how it is normally used.

## Category

supply-chain

## Audience

- EDI coordinator
- EDI analyst
- ERP integration developer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Segment

**Key:** seg

**Type:** text

#### Element

**Key:** elem

**Type:** text

#### Name

**Key:** name

**Type:** text

#### Type

**Key:** dtype

**Type:** text

#### Length (min/max)

**Key:** len

**Type:** text

#### Notes

**Key:** note

**Type:** text

**Rows:**

#### Authorization Information Qualifier

**Seg:** ISA

**Elem:** ISA01

**Dtype:** ID

**Len:** 2/2

**Note:** 00 means no authorization information present. Most partners use 00.

#### Authorization Information

**Seg:** ISA

**Elem:** ISA02

**Dtype:** AN

**Len:** 10/10

**Note:** Ten spaces when ISA01 is 00.

#### Security Information Qualifier

**Seg:** ISA

**Elem:** ISA03

**Dtype:** ID

**Len:** 2/2

**Note:** 00 means no security information present.

#### Security Information

**Seg:** ISA

**Elem:** ISA04

**Dtype:** AN

**Len:** 10/10

**Note:** Ten spaces when ISA03 is 00.

#### Interchange ID Qualifier (sender)

**Seg:** ISA

**Elem:** ISA05

**Dtype:** ID

**Len:** 2/2

**Note:** Common values: 01 (DUNS), 12 (phone), 14 (DUNS plus suffix), ZZ (mutually defined).

#### Interchange Sender ID

**Seg:** ISA

**Elem:** ISA06

**Dtype:** AN

**Len:** 15/15

**Note:** Pad with trailing spaces to exactly 15 characters.

#### Interchange ID Qualifier (receiver)

**Seg:** ISA

**Elem:** ISA07

**Dtype:** ID

**Len:** 2/2

**Note:** Same code list as ISA05.

#### Interchange Receiver ID

**Seg:** ISA

**Elem:** ISA08

**Dtype:** AN

**Len:** 15/15

**Note:** Pad with trailing spaces to exactly 15 characters.

#### Interchange Date

**Seg:** ISA

**Elem:** ISA09

**Dtype:** DT

**Len:** 6/6

**Note:** YYMMDD.

#### Interchange Time

**Seg:** ISA

**Elem:** ISA10

**Dtype:** TM

**Len:** 4/4

**Note:** HHMM.

#### Repetition Separator (4020 and later) or Standards ID

**Seg:** ISA

**Elem:** ISA11

**Dtype:** ID

**Len:** 1/1

**Note:** In version 004010 and earlier this is a standards identifier, normally U. From 004020 it holds the repetition separator.

#### Interchange Control Version Number

**Seg:** ISA

**Elem:** ISA12

**Dtype:** ID

**Len:** 5/5

**Note:** For example 00401 or 00501. Note: this is the envelope version, not the GS08 transaction version.

#### Interchange Control Number

**Seg:** ISA

**Elem:** ISA13

**Dtype:** N0

**Len:** 9/9

**Note:** Zero padded, unique per interchange, must equal IEA02.

#### Acknowledgment Requested

**Seg:** ISA

**Elem:** ISA14

**Dtype:** ID

**Len:** 1/1

**Note:** 0 no, 1 yes. 1 requests a TA1 interchange acknowledgment.

#### Interchange Usage Indicator

**Seg:** ISA

**Elem:** ISA15

**Dtype:** ID

**Len:** 1/1

**Note:** P production, T test. Wrong value is a common go-live error.

#### Component Element Separator

**Seg:** ISA

**Elem:** ISA16

**Dtype:** AN

**Len:** 1/1

**Note:** Often > or :. This character ends the ISA and also tells the parser the sub-element separator.

#### Functional Identifier Code

**Seg:** GS

**Elem:** GS01

**Dtype:** ID

**Len:** 2/2

**Note:** PO for 850/860, SH for 856, IN for 810, FA for 997, PR for 855, SM for 204.

#### Application Sender's Code

**Seg:** GS

**Elem:** GS02

**Dtype:** AN

**Len:** 2/15

**Note:** Often matches ISA06 trimmed, but partners may assign a separate code.

#### Application Receiver's Code

**Seg:** GS

**Elem:** GS03

**Dtype:** AN

**Len:** 2/15

**Note:** Often matches ISA08 trimmed.

#### Date

**Seg:** GS

**Elem:** GS04

**Dtype:** DT

**Len:** 8/8

**Note:** CCYYMMDD.

#### Time

**Seg:** GS

**Elem:** GS05

**Dtype:** TM

**Len:** 4/8

**Note:** HHMM, HHMMSS or HHMMSSDD.

#### Group Control Number

**Seg:** GS

**Elem:** GS06

**Dtype:** N0

**Len:** 1/9

**Note:** Must equal GE02. Unique per group within the interchange.

#### Responsible Agency Code

**Seg:** GS

**Elem:** GS07

**Dtype:** ID

**Len:** 1/2

**Note:** X for ASC X12.

#### Version / Release / Industry Identifier Code

**Seg:** GS

**Elem:** GS08

**Dtype:** AN

**Len:** 1/12

**Note:** For example 004010 or 004010VICS or 005010.

#### Transaction Set Identifier Code

**Seg:** ST

**Elem:** ST01

**Dtype:** ID

**Len:** 3/3

**Note:** For example 850, 855, 856, 810, 997.

#### Transaction Set Control Number

**Seg:** ST

**Elem:** ST02

**Dtype:** AN

**Len:** 4/9

**Note:** Must equal SE02. Usually starts at 0001 in each group.

#### Implementation Convention Reference

**Seg:** ST

**Elem:** ST03

**Dtype:** AN

**Len:** 1/35

**Note:** Used in 005010 guides. Absent in most 004010 files.

#### Number of Included Segments

**Seg:** SE

**Elem:** SE01

**Dtype:** N0

**Len:** 1/10

**Note:** Counts every segment from ST through SE inclusive. A wrong count causes AK502 code 4.

#### Transaction Set Control Number

**Seg:** SE

**Elem:** SE02

**Dtype:** AN

**Len:** 4/9

**Note:** Must match ST02.

#### Number of Transaction Sets Included

**Seg:** GE

**Elem:** GE01

**Dtype:** N0

**Len:** 1/6

**Note:** Count of ST/SE pairs in this group.

#### Group Control Number

**Seg:** GE

**Elem:** GE02

**Dtype:** N0

**Len:** 1/9

**Note:** Must match GS06.

#### Number of Included Functional Groups

**Seg:** IEA

**Elem:** IEA01

**Dtype:** N0

**Len:** 1/5

**Note:** Count of GS/GE pairs in the interchange.

#### Interchange Control Number

**Seg:** IEA

**Elem:** IEA02

**Dtype:** N0

**Len:** 9/9

**Note:** Must match ISA13.

**Notes:** The ISA segment is fixed length: 106 characters including the segment terminator. Separators are declared by position inside the ISA (element separator is character 4, component separator is ISA16, segment terminator follows ISA16). Always confirm separators, qualifiers and version with the partner guide.

## Content

**Intro:** Most X12 file errors that stop a whole interchange happen in the envelope, not in the PO or invoice data. This table lists each element of ISA, GS, ST, SE, GE and IEA with its type and length so you can check a file or build a map.

**Sections:**

#### How the envelope nests

**Body:** An interchange starts with ISA and ends with IEA. Inside it are one or more functional groups (GS to GE), and inside each group are transaction sets (ST to SE). Control numbers must match at each level: ISA13 with IEA02, GS06 with GE02, ST02 with SE02. The counts must also match: IEA01 counts groups, GE01 counts sets, and SE01 counts segments in the set.

#### Fixed length rules in the ISA

**Body:** The ISA is the only segment where every element has a fixed length, which is how a parser finds the separators before it knows them. That is why ISA06 and ISA08 must be padded to exactly 15 characters and why ISA02 and ISA04 are ten spaces. A sender ID of 9 characters followed by only 3 spaces gives a short ISA, and the partner's gateway will either reject the file or misread the date.

**Bullets:**

- ISA06 and ISA08: exactly 15 characters.
- ISA13: exactly 9 digits, zero padded.
- ISA15: P for production, T for test.
- ISA16: a single character separator, not blank.

#### Common envelope mistakes

**Body:** Test files sent with ISA15 set to P cause real orders at the partner. Production files left with T are ignored. Another frequent issue is recycling ISA13 after a counter reset, which gets the interchange dropped as a duplicate. Counters should be stored in the translator and never reset by hand during a live relationship. Check that SE01 counts include the added segments that a mapping tool inserts after the template was designed.

**Cta:** If envelope settings are scattered across spreadsheets for many partners, Netray can help centralize them and compare them to what your ERP integration layer actually sends.

**Faq:**

#### Why must ISA06 and ISA08 be 15 characters?

**Answer:** The ISA is a fixed length segment so a parser can read the separators by position before it knows them. IDs shorter than 15 characters are padded with trailing spaces. Without padding, every later element shifts and the interchange fails.

#### What is the difference between ISA12 and GS08?

**Answer:** ISA12 is the version of the interchange envelope, such as 00401. GS08 is the version of the transaction sets inside the group, such as 004010 or 004010VICS. They often look similar but control different things.

#### Can ISA13 repeat?

**Answer:** It should not repeat for the same sender and receiver pair. A repeated interchange control number is commonly treated as a duplicate. Keep the counter in the translator and avoid manual resets.

#### Does SE01 include the ST segment?

**Answer:** Yes. SE01 counts all segments from ST through SE inclusive. A set with ST, BAK, one PO1 and SE has SE01 of 4.

## Search terms

ISA segment fields, x12 envelope structure, ISA16 component separator, ISA13 interchange control number, GS segment elements, x12 ST SE segment, ISA06 ISA08 sender receiver id, x12 envelope reference

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
