Elementor #9137

🔒 Advisory & Compliance

Export-Control Agent

Automatically flag likely ITAR/EAR controlled technical data and enforce mandatory U.S.-person review workflows. Deployed on-premises for maximum security and compliance assurance.

🛡️ On-Premises Deployment Only
🔍

Intelligent Detection

AI-powered ITAR/EAR identification

⚠️

Automated Flagging

Real-time compliance alerts

👤

Forced Review

U.S.-person authorization required

🏢

On-Prem Security

Complete data sovereignty

Sample Technical Document

The system utilizes a frequency-hopping spread spectrumITAR communication protocol operating at military-grade encryption levelsEAR. The UAV guidance system incorporates inertial navigation technologyITAR with GPS-denied operation capability. The propulsion module features composite materials with thermal signatures below 100 KelvinITAR, enabling stealth characteristics. Software implements source code for cryptographic key managementEAR compliant with FIPS 140-2 Level 3 standards.

Note: All flagged content requires U.S.-person review before export or sharing with foreign nationals. Hover over flagged text to see classification details.

🛡️

Prevent Costly Violations

Catch export control violations before they occur. Proactive detection and mandatory review processes prevent inadvertent disclosure of controlled technical data, protecting against million-dollar penalties and debarment.

Ensure Regulatory Compliance

Maintain continuous compliance with ITAR, EAR, and other export control regulations. Automated monitoring and enforcement provide defensible compliance posture during DDTC or BIS audits and inspections.

Streamline Review Processes

Reduce review bottlenecks by focusing U.S.-person resources on truly controlled content. AI pre-screening eliminates false positives and provides context to accelerate informed decision-making.

📊

Complete Audit Trail

Maintain comprehensive records of all flagged content, review decisions, and approvals. Detailed audit logs with timestamps, reviewers, and rationales demonstrate due diligence to regulators.

🔐

Data Sovereignty & Security

On-premises deployment ensures controlled technical data never leaves your network. Air-gap capability supports classified environments. Meet ITAR data residency requirements with complete confidence.

📚

Organizational Knowledge Building

Build institutional knowledge of export-controlled content across your organization. Training data from past reviews improves detection accuracy and helps teams understand compliance requirements better.

Scroll to Top