Cyber-Defense for Space Systems: AI-Based Anomaly Detection for Critical Infrastructure Protection

Executive Summary

As orbital assets become essential to national security and global communications, space systems now face unprecedented cyber threats.
Traditional defenses can’t handle the complexity or data scale of modern spacecraft, which produce terabytes of telemetry daily.

Netray’s AI-powered anomaly detection platform provides 24/7 protection, identifying subtle irregularities in real time with sub-second response and 99.7% uptime securing satellites before damage occurs.

Key Results:

  • Continuous AI-driven telemetry monitoring
  • Full compliance with NIST and CISA frameworks

The Growing Space Cyber Threat

Spacecraft are no longer isolated from cyber warfare.
From command hijacking to data manipulation and supply chain compromises, attackers now target orbital systems directly.
Once deployed, satellites cannot be patched or repaired physically — making real-time, autonomous defense mandatory.

How AI Detects Anomalies in Space Telemetry

Every spacecraft has a unique operational signature — power levels, temperature, control data, orbital dynamics.
Netray’s AI agents learn these patterns, continuously flagging deviations that may indicate intrusions.

Core Technologies:

  • Unsupervised ML: Detects outliers without needing labeled data.
  • Deep Learning (RNN/LSTM): Models complex temporal behavior across weeks or months.
  • Real-Time Analytics: Processes live telemetry streams within milliseconds.

Outcome: True threats identified instantly, while natural fluctuations are filtered out.

Netray’s AI Platform: Built for Space

  1. Proprietary Telemetry Engine – Correlates multi-dimensional data to detect hidden attack patterns across spacecraft fleets.
    2. Adaptive Learning – Continuously adjusts to mission phases, environmental changes, and evolving threats.
    3. Federated Architecture – Shares threat intelligence securely across constellations while maintaining data sovereignty.
    4. Seamless Integration – Compatible with CCSDS, REST APIs, and existing ground systems for real-time alerting and forensic analysis.

Use Cases

  • National Security Satellites: Command authentication and payload integrity verification.
  • Commercial Operators: SaaS-based protection for CubeSats to GEO platforms.
  • Mega-Constellations: Coordinated monitoring across thousands of satellites to detect synchronized attacks.

Measured Impact:

  • 95% reduction in detection time
  • 87% fewer false alerts
  • 99.7% monitoring availability

Compliance & Standards

Aligned with:

  • NIST Cybersecurity Framework
  • CISA Space Systems Security Guidelines
  • ISO/IEC 27001 & ESA Cybersecurity Frameworks

Netray ensures complete audit trails, certification readiness, and zero data leakage under ITAR/DFARS controls.

Future-Ready Cyber Defense

Netray is advancing:

  • Quantum-resistant AI models
  • Autonomous in-orbit countermeasures
  • Cross-domain threat intelligence for space, air, and ground networks

Conclusion

Space is the new frontier — and its defense begins with AI.
Netray’s anomaly detection platform turns massive telemetry data into actionable security intelligence, ensuring continuous protection for spacecraft, satellites, and orbital infrastructure.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top