How-toInfor LNWarehousing / Inbound and Outbound

How to process inbound and outbound warehousing orders in Infor LN

Question
how to process inbound and outbound warehousing orders in Infor LN

Also searched as

  • infor ln warehouse receiving process
  • infor ln outbound shipment confirmation how to
  • infor ln purchase order intake warehousing
  • infor ln pick list confirmation

Short answer

Infor LN Warehousing splits every physical movement into inbound (goods arriving, mainly from purchase orders) and outbound (goods leaving, mainly for sales orders), each driven by its own warehouse order type. Inbound runs through intake, inspection if required, and put-away; outbound runs through order release, picking, packing and shipment confirmation, with each stage updating the order status other modules watch.

Applies to: Infor LN Enterprise Edition, Warehousing module

Run an inbound receipt and an outbound shipment in Warehousing

  1. 1Inbound: Warehousing > Inbound > Inbound Order Lines is generated automatically when a purchase order is approved and released to the warehouse.
  2. 2Warehousing > Inbound > Receipts: confirm the physical receipt against the inbound order line, recording quantity and, if applicable, lot or serial number.
  3. 3If the item or item group requires inspection, the receipt routes to a quality hold status before it is available for put-away; approve or reject through the quality session before continuing.
  4. 4Confirm put-away to move the received quantity from the receiving location to its storage location, which updates on-hand inventory.
  5. 5Outbound: Warehousing > Outbound > Outbound Order Lines is generated when a sales order is released, or manually for a warehousing-only order type.
  6. 6Warehousing > Outbound > Picking: generate and print (or send to RF) the pick list, then confirm picked quantity against the pick list lines.
  7. 7Confirm packing if the order type requires a packing step, assigning items to shipping units or license plates.
  8. 8Warehousing > Outbound > Shipments: confirm the shipment once goods physically leave, which closes the outbound order line and updates the linked sales order status to Delivered.
  9. 9Reconcile any short-picked or backordered lines, which remain open on the outbound order for the next pick run once stock is available.

Order types drive the process, not the item

Whether a receipt requires inspection, whether picking is a separate confirmed step or combined with shipment, and whether put-away is directed to a fixed location or determined by warehousing logic, are all controlled by the warehouse order type and its linked parameters, not by the item itself. Two sites can run the same item through very different inbound flows because their order types differ.

When training new warehouse staff or troubleshooting a step that seems to be missing, check the order type configuration before assuming the item master is wrong.

Location and lot/serial control

LN tracks inventory at the warehouse-location-lot/serial level, so put-away and picking both depend on location logic (fixed, dynamic, or directed by warehousing rules) configured per warehouse. Items under lot or serial control add a mandatory selection step at both receipt and pick confirmation that cannot be skipped.

Getting locations wrong at put-away is one of the more common causes of inventory looking correct in total but a pick failing because the system-recorded location does not match reality; a cycle count against the specific location, not just the item, is usually the fastest way to confirm and correct this.

How this connects to Purchasing and Sales

Inbound orders exist because a purchase order was approved and released; outbound orders exist because a sales order (or a warehousing transfer order) was released. Neither side can be worked around independently: cancelling or changing quantity on the source purchase or sales order after the warehouse order is generated requires the warehouse order to be updated too, and LN does not always propagate every change automatically depending on how far the warehouse process has progressed.

For high-volume sites, check whether warehousing orders are generated automatically on release or require a manual planning run; a delay here is a frequent, easy-to-miss cause of orders appearing stuck.

Try it here, free

Infor LN Warehousing Tables Reference (whinh, whwmd, whinr)

Open full tool

Table-by-table map of LN 10.x Warehousing: masters, warehouse orders, receipts, outbound advice, shipments, cycle counts, adjustments and inventory transactions.

Common pitfalls

  • !Assuming an item change on the sales or purchase order automatically updates an already-generated warehouse order line.
  • !Skipping quality inspection confirmation and wondering why received stock is not available to pick.
  • !Confirming a pick without confirming the shipment, leaving the sales order line stuck at Picked instead of Delivered.
  • !Ignoring backordered outbound lines that silently wait for the next planning run instead of being actively worked.
  • !Not reconciling put-away location against physical location, which causes future pick failures that look like data errors.
  • !Running manual warehouse order generation inconsistently across sites, so orders sit unprocessed at one site while another runs smoothly.

How an ERP-grounded AI assistant handles this

ERPray can be asked which inbound or outbound orders are stuck and at which stage (received but not put away, picked but not shipped, short-picked and waiting for stock) across a whole warehouse in one query, instead of a supervisor scanning multiple Warehousing sessions line by line. It grounds the answer in the actual order and location data rather than guessing from a status report someone ran an hour ago.

Frequently asked questions

Why is a received item not available to pick even though the receipt is confirmed?

Check whether the item or item group requires quality inspection; a receipt on quality hold is confirmed but not yet available inventory. Also confirm put-away was completed, since a receipt sitting in the receiving location may not be considered a pickable storage location.

Can I ship a partial quantity from an outbound order line?

Yes, partial picking and shipment are standard; the unshipped remainder stays open on the outbound order line and is picked up in the next pick run once available, consistent with how the linked sales order handles partial delivery.

How do I handle a receipt against the wrong purchase order line?

Do not force it through; reverse or correct the receipt against the correct line using the receipt correction functionality, since a mismatched receipt will cause purchase order matching and cost issues downstream in Financials.

What controls whether picking and packing are separate confirmed steps?

The warehouse order type parameters. Some sites combine picking and packing into a single confirmation for simplicity; others separate them to support license-plate-based packing and shipping unit tracking.

Related

How-to

How to process a sales order to invoice in Infor LN

In Infor LN a sales order moves from order entry to cash through four linked steps: create and approve the Sales Orders session, release the order lines to Warehousing so a warehouse order is generated, confirm the outbound shipment, and then run the invoicing session that composes and posts the sales invoice to Financials. Each step hands off through an integration document, so a stuck invoice almost always traces back to a missing or unconfirmed step earlier in the chain.

How-to

How to calculate item cost prices in Infor LN

Infor LN calculates an item's cost price by rolling up material, labor, machine, subcontract and overhead costs defined against cost components, using the item's bill of material and routing as the calculation base for manufactured items and purchase price for bought items. The calculation can run in simulation mode to preview the result or in update mode to actually change the item's standard cost, which then drives inventory valuation and variance reporting going forward.

Error fix

Infor LN Reports Stuck in the Print Queue: Device and Spooler Fix

Infor LN reports and forms stay queued and never reach the printer when the target device definition points to a printer that is offline, or the print listener on the print server has stopped. Check the device's status in Common > Printing > Devices, confirm the underlying OS printer is reachable, and restart the print listener if jobs remain queued after the printer itself is fixed. Most cases trace back to a genuinely offline printer, not an LN bug.

Error fix

Infor LN Jobs Stuck in Active or Waiting: Fix the Job Daemon

Infor LN background jobs, reports, batch processes and print jobs, get stuck in Active or Waiting status when the job daemon on the enterprise server has stopped or lost its connection, or when a prior job crashed without releasing its status. Restart the job daemon and reset the stuck job's status through the Jobs session, and the queue resumes. A daemon that keeps stopping usually points to a memory, license or database connectivity problem on the server.

Advanced

How to diagnose and fix a slow Infor LN session

A slow Infor LN session is usually caused by an unindexed or overly broad database query, unarchived data bloating a transaction table, or resource pressure on the Java application tier, and occasionally by a recently added custom DAL2 handler. The fix starts with isolating which tier the delay is actually in rather than guessing at a solution.

Error fix

Infor LN bshell Process Stuck at 100% CPU: How to Diagnose and Fix It

A bshell process pinned at 100% CPU on the Infor LN application server almost always means one session is stuck in a 4GL loop, scanning an unindexed table, or waiting on a database lock. End the session from the Sessions Monitor first, then kill the OS process only if that fails, and check for a blocking database transaction before assuming it is a bug.

AI for ERP

AI for Infor LN: Sessions, BODs, and Engineer-to-Order Work

Add grounded AI to Infor LN 10.x or CloudSuite: natural-language answers over sessions and BODs, agents for project and engineer-to-order work, on-prem options.

AI for ERP

AI shop floor assistant for operators working inside your ERP

An on-prem AI copilot answers operator questions against your ERP work instructions, travelers, and routings in plain language, at the machine, without a screen full of menus.

Stuck on Infor LN?

Talk to engineers who work inside Infor LN every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software