PCBSpotSELF-HOSTED AI

AI-Powered PCB Repair Intelligence. 100% On-Premise.

Track every repair. Diagnose like a veteran. Detect failure patterns before they cascade. All powered by locally-hosted AI models that never send your data outside your network.

ITAR Compatible
Air-Gapped Ready
Zero Cloud
Your Data, Your Servers
0%
NFF Rate Reduction
0x
Faster Root Cause
0hrs
Saved Per Quarter
0%
BOM Match Accuracy
$0M
Scrap Cost Avoided
0
Cloud Dependencies
The Problem

Your Depot Runs on Tribal Knowledge & Spreadsheets

Every depot manager we talk to deals with the same six problems. PCBSpot solves all of them.

Knowledge Walks Out the Door

When a senior technician retires, 20 years of institutional knowledge vanishes overnight. PCBSpot captures every diagnostic decision into an AI that any tech can query.

Spreadsheet Chaos

Excel files, paper logs, homegrown Access databases that nobody trusts. PCBSpot replaces all of it with one searchable, AI-powered system.

Invisible Failure Patterns

The same boards keep failing for the same reasons, but nobody connects the dots across hundreds of repairs. AI pattern detection surfaces trends automatically.

Turnaround Time Pressure

Defense programs have readiness requirements. Downtime on a weapons system costs millions per day. PCBSpot cuts diagnosis time by helping techs find answers faster.

Cost Overruns with No Root Cause

Leadership asks why repair costs keep climbing, nobody has granular answers. PCBSpot tracks cost per board, per failure mode, per technician.

AI Tools Are Off-Limits

You want AI, but every vendor requires cloud access. Your ISSM kills it. PCBSpot runs 100% on-premise with locally-hosted open-source LLMs. Your data never leaves.

Capabilities

Everything Your Depot Needs. Nothing That Leaves Your Network.

Click any capability to see the details.

Live Simulations

See PCBSpot in Action

Interactive simulations showing real capabilities. This is what your depot team will use every day.

AI Diagnostic Copilot

Watch the AI copilot diagnose a Channel 3 failure using repair history from 847 prior cases. Running on a locally-hosted Llama 3.1 model, no cloud, no external API.

PCBSpot AI Copilot: Local LLM (Llama 3.1 70B) Air-Gapped

Repair Pipeline Tracker

Real-time visibility into every board moving through your depot. From intake to ship, know exactly where every repair stands.

Repair Pipeline: Live View
49 ACTIVE REPAIRS
12
Intake
8
Diagnosis
5
Parts Sourcing
15
Repair
6
QA Testing
3
Ship

Intake — Board received, logged, photographed

Failure Pattern Detection

ML-powered analytics that surface failure trends across your entire repair database. Hover to explore.

Failure Pattern Detection
LIVE ANALYSIS
PSU-4388
47
CTL-7621
31
COM-3195
28
SIG-8847
22
PWR-2204
18
RF-5512
15
NAV-6673
12
DSP-9901
9

Cost & Performance Dashboard

Real-time KPIs that give leadership the granular answers they need. Every dollar, every day, every board.

Repair Operations KPIs
Last 30 days
2.3hrs
MTTR
-58%
4.1%
NFF Rate
-73%
94.7%
First-Pass Yield
+12.3%
847/mo
Throughput
+34%
Cost Breakdown (%)
NFF Elimination (38%)
Faster Diagnosis (29%)
Scrap Reduction (21%)
Rework Avoidance (12%)

Knowledge Capture & Preservation

Every repair decision, every expert insight, every AI-detected pattern, captured automatically. Your institutional memory grows with every repair.

Knowledge Capture Feed
Institutional memory: growing
Mike R. (25 yr veteran)Expert Insight2 hours ago

Diagnosed U14 failure on 4388-series by listening for coil whine

Sarah K. (3 yr tech)AI-Assisted4 hours ago

Used AI copilot to identify cold solder joint on J7 connector, matched pattern from 14 prior repairs

PCBSpot AIAuto-Detection6 hours ago

Detected emerging failure cluster: 5 CTL-7621 boards failed in 10 days. Alerted depot manager.

James L. (12 yr veteran)Knowledge CapturedYesterday

Documented custom rework procedure for Rev B power supply boards, now available to all techs

PCBSpot AIAnalytics2 days ago

Generated monthly failure report: 3 boards flagged for design review, 2 suppliers flagged for quality decline

Self-Hosted Architecture

Every layer runs inside your network. The AI engine uses locally-hosted open-source models. No cloud APIs. No data egress. Your ISSM will approve this.

Self-Hosted Architecture
100% ON-PREMISE
Your Network BoundarySECURED
FirewallAir-Gap / VPNZero External Access
Application Layer
PCBSpot Web UIREST APIRole-Based AccessSSO Integration
AI Engine
Local LLM (Llama / Mistral)Failure Pattern MLNLP Query EngineNo Cloud API Calls
Data Layer
PostgreSQL / SQLiteEncrypted at RestFull Data OwnershipExport Anytime
Infrastructure
Linux / Windows ServerDocker or Bare MetalGPU Optional (CPU OK)Standard Hardware
All data stays within your network perimeter. Zero external API calls. Zero cloud dependency.
Built For

Purpose-Built for Defense & Electronics Manufacturing

PCBSpot is designed for organizations where repair data is sensitive, knowledge retention is critical, and cloud AI is not an option.

Defense Electronics OEMs

L3Harris, BAE Systems, Raytheon, Northrop Grumman, Leonardo DRS

Electronics MRO Shops

Ducommun, API Technologies, HEICO Electronic, Celestica Defense

Military Depots

Tobyhanna Army Depot, Fleet Readiness Centers, Warner Robins ALC

Avionics & Radar

Radar modules, EW systems, communication boards, sensor arrays

Deployment

Live in Days, Not Months

No 6-month IT integration project. PCBSpot deploys on your infrastructure with minimal setup.

STEP 1

Install

Docker or bare metal on your Linux/Windows server. GPU optional.

STEP 2

Import

Bring existing repair data from spreadsheets. We handle the mapping.

STEP 3

Configure

Set up roles, board catalogs, failure taxonomies. Multi-tenant ready.

STEP 4

Go Live

Technicians start logging repairs. AI copilot begins learning immediately.

“We Want AI, But Our Data Can't Leave Our Network”

Every defense electronics company we talk to says the same thing. Their ISSM kills every cloud AI tool. PCBSpot is the answer: self-hosted AI powered by locally-hosted open-source models. No OpenAI. No cloud APIs. No data egress. Period.

Ready to Modernize Your Depot?

See PCBSpot live with real repair data. 10-minute demo, no slides, just the product. Already live with a major defense OEM tracking 1,000+ repairs.