Compliance & StandardsGlossary

What Is FedRAMP?

Also known as: Federal Risk and Authorization Management Program

Definition

FedRAMP (Federal Risk and Authorization Management Program) is the US government program that standardizes security assessment, authorization, and continuous monitoring for cloud services, allowing one rigorous authorization to be reused across federal agencies.

FedRAMP Explained

FedRAMP began in 2011 as an OMB policy initiative and was later codified in statute through the FedRAMP Authorization Act. Its founding logic is do once, use many times: before FedRAMP, every agency independently assessed the same cloud provider, duplicating effort and producing inconsistent results. Under FedRAMP a cloud service offering is assessed once against a standard baseline, the resulting package is stored in a central repository, and any agency can review and reuse it to grant its own Authorization to Operate.

Impact level determines the baseline. Using FIPS 199 categorization for confidentiality, integrity, and availability, an offering is designated Low, Moderate, or High. The control baselines derive from NIST SP 800-53, with Moderate - the level most federal systems require - carrying several hundred controls plus FedRAMP-specific parameters and additional requirements. Low includes a streamlined Tailored path for low-risk SaaS. High is reserved for data whose compromise would have severe or catastrophic effect, such as law enforcement or emergency services systems.

The assessment itself is performed by a Third Party Assessment Organization, an accredited independent firm that tests controls, performs penetration testing, and produces a Security Assessment Report. The provider supplies a System Security Plan and remediates or documents findings in a Plan of Action and Milestones. Authorization comes either from a sponsoring agency or through a government-wide review body. Authorization is not a finish line: continuous monitoring requires monthly vulnerability scanning, POA&M updates, and annual assessment, with significant change requests reviewed before major architecture changes.

DoD adds a layer on top. The Cloud Computing Security Requirements Guide defines Impact Levels 2, 4, 5, and 6, where IL4 and IL5 handle CUI and higher-sensitivity unclassified data and IL6 handles classified information. A FedRAMP Moderate or High authorization is the prerequisite, and the DoD provisional authorization adds requirements around US-person access, physical location of data and support personnel, and connectivity through approved boundary points.

For defense manufacturers the operative phrase in DFARS 252.204-7012 is FedRAMP Moderate equivalency. A cloud provider handling covered defense information must meet requirements equivalent to the Moderate baseline. Equivalency has proven contentious because DoD has signaled it expects a genuine equivalent - a 3PAO-assessed body of evidence - rather than a vendor claim. This is a major reason defense suppliers either select government-community cloud regions with actual authorizations or keep controlled ERP and AI workloads on premises where equivalency arguments are unnecessary.

Why It Matters

  • Cloud services touching covered defense information must meet FedRAMP Moderate equivalency, which disqualifies most commercial SaaS and AI offerings by default.
  • Reusable authorization packages let agencies and primes evaluate a vendor quickly, turning FedRAMP status into a practical market-access gate.
  • Continuous monitoring obligations mean authorization is an ongoing operational cost, not a one-time certification project.
  • DoD impact levels layer US-person access and data location requirements on top of FedRAMP, narrowing the viable vendor list further for controlled workloads.

In Practice

A frequent trap: a vendor markets a product as FedRAMP ready or in process and a buyer treats that as authorized. Ready means a 3PAO has attested the offering is likely to achieve authorization; in process means an assessment is underway with an agency or review body. Neither produces an authorization package a contracting officer can rely on. Ask for the specific service offering name in the FedRAMP Marketplace, its authorization status, its impact level, and whether the exact SKU and region you are buying is inside the authorization boundary.

Frequently Asked Questions

What is the difference between FedRAMP Moderate and FedRAMP High?

The difference is the FIPS 199 impact categorization of the data. Moderate applies where compromise would cause serious adverse effect and covers the majority of federal systems, including most CUI. High applies where compromise would cause severe or catastrophic effect, such as law enforcement, financial, or emergency services data, and adds a substantially larger control set and stricter operational requirements.

Does a FedRAMP authorization satisfy CMMC?

No. They address different parties. FedRAMP authorizes a cloud service provider's offering; CMMC assesses a contractor's own environment. Using a FedRAMP Moderate authorized service helps satisfy the DFARS 252.204-7012 cloud condition and inherits some controls, but the contractor still must implement and be assessed against NIST SP 800-171 for everything inside its own boundary.

Working with FedRAMP in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

Government Contract Compliance Cost Calculator

Open full tool

Estimate the implementation, assessment, and recurring annual cost of DFARS/CMMC compliance for your DoD business, and see it as a percentage of contract revenue.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring