ERP3 min readNetray Engineering Team

ERP Penetration Testing Methodology Guide

Short answer

ERP penetration testing evaluates the security posture of your enterprise resource planning system by simulating real-world attack techniques against authentication mechanisms, authorization controls, application logic, and network infrastructure. Unlike generic web application pen tests, ERP pen testing requires specialized knowledge of ERP-specific attack vectors including default credentials, RFC function abuse, transport manipulation, and business logic exploitation. This guide provides a structured methodology aligned with OWASP Testing Guide and NIST SP 800-115.

Reconnaissance and Attack Surface Mapping

ERP reconnaissance identifies all exposed endpoints, services, and interfaces that could serve as attack entry points. For cloud ERP deployments, the attack surface includes web application URLs, API endpoints, SSO integration points, file upload interfaces, and reporting service endpoints. For on-premise deployments, additional vectors include database listener ports, application server management consoles, and legacy protocol endpoints.

The reconnaissance phase produces a complete attack surface map that guides subsequent testing phases.

  • Enumerate all ERP web endpoints including application URLs, API gateways, SSO login pages, and admin console interfaces
  • Scan for exposed management ports: database listeners (1433, 5432, 1521), app server admin (4848, 9060), RDP (3389)
  • Identify ERP version and patch level from HTTP response headers, login page source code, and error message fingerprinting
  • Map API endpoints using documentation discovery (Swagger/OpenAPI), directory brute-forcing, and traffic analysis
  • Document all third-party integrations and their authentication mechanisms as potential lateral movement paths

Vulnerability Assessment and Exploitation

ERP vulnerability testing combines automated scanning with manual testing of ERP-specific attack vectors. Automated scanners detect common web vulnerabilities (OWASP Top 10), missing patches, and misconfigurations. Manual testing targets ERP-specific vectors: default account credentials, authorization bypass through URL manipulation, business logic flaws in approval workflows, mass data extraction through report abuse, and privilege escalation through role manipulation.

All exploitation attempts must be documented with evidence and impact assessment.

  • Test all default account credentials: admin/admin, DDIC/19920706, SAP*/06071992, and ERP-vendor-specific default passwords
  • Evaluate authorization controls by testing horizontal privilege escalation (accessing other users' data) and vertical escalation (admin functions)
  • Test business logic flaws: bypassing approval workflows, manipulating transaction amounts, overriding segregation of duties controls
  • Attempt SQL injection and command injection on custom ERP extensions, report parameters, and search functions
  • Test API endpoints for BOLA (Broken Object Level Authorization) by manipulating resource IDs in authenticated API calls

Reporting and Remediation Prioritization

Penetration test findings must be documented with sufficient detail for remediation teams to reproduce and fix each vulnerability. 1 score, business impact assessment, technical evidence (screenshots, request/response captures), and specific remediation guidance. Remediation prioritization uses a risk-based approach combining CVSS severity with business context: a medium-severity SQL injection on the financial reporting module ranks higher than a high-severity XSS on a static help page due to the data exposure potential.

  • Score each finding using CVSS v3.1 base metrics with environmental adjustments reflecting your specific ERP deployment context
  • Classify findings by remediation urgency: Critical (patch within 72 hours), High (14 days), Medium (30 days), Low (90 days)
  • Provide step-by-step remediation guidance for each finding including specific configuration changes, patches, or code fixes required
  • Conduct remediation verification testing confirming each finding is properly resolved without introducing new vulnerabilities
  • Deliver executive summary with risk dashboard, finding trends, and strategic recommendations for long-term security improvement

Try it here, free

Penetration Test Scoping Calculator

Open full tool

Estimate total testing days and project cost for a penetration test based on external IPs, web applications, APIs, and internal network segments in scope.

Schedule an ERP penetration test with Netray's certified security engineers. We deliver actionable findings with prioritized remediation roadmaps.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring