Infor LN3 min readNetray Engineering Team

Infor LN Document Output Management: Print, Email, and Electronic Delivery

Short answer

Document output in Infor LN encompasses everything from printed purchase orders and invoices to electronic delivery via email, EDI, and regulatory e-invoicing platforms. LN's Document Output Management (DOM) framework controls document generation, formatting, routing, and archival. Configuring DOM correctly eliminates manual document handling and ensures compliance with trading partner and regulatory requirements.

Document Output Management Architecture

LN's DOM architecture separates document content generation from delivery. Report sessions produce document data, the DOM framework applies formatting rules and templates, and output devices handle final delivery to printers, email servers, file systems, or external platforms. This separation allows the same document to be simultaneously printed, emailed, and archived without duplicate generation.

  • Document models: configure in session ttadv3500m000 defining layout templates, page structure, and branding elements
  • Output devices: printers, email (SMTP), file export (PDF, XML, CSV), and electronic delivery configured per document type
  • Routing rules: session ttadv3530m000 maps document types to output devices based on business partner, company, or user role
  • Archive integration: automatic document archival to Infor Document Management (IDM) or third-party DMS systems
  • Multi-format output: single document definition generates PDF for email, ZPL for label printers, and XML for EDI simultaneously

Configuring Common Document Types

The most frequently generated LN documents are purchase orders, sales invoices, packing slips, and manufacturing work orders. Each document type has specific configuration requirements around numbering, tax presentation, multi-language support, and regulatory compliance fields. LN's report session framework uses Crystal Reports or Infor Reporting for document formatting.

  • Purchase orders: configure PO print session (tdpur4400m000) with supplier-specific language, currency, and delivery terms
  • Sales invoices: set up invoice output (cisli3600m000) with country-specific tax layouts and electronic invoicing formats
  • Packing slips and shipping documents: configure whinh3400m000 with carrier-specific label and manifest requirements
  • Manufacturing work orders: route work order prints (tisfc0401m000) to shop floor printers with operation-level instructions
  • Financial documents: configure bank payment advice and remittance documents with banking format compliance

Email Delivery and Electronic Distribution

Transitioning from printed to electronic document delivery reduces costs and accelerates business processes. LN's email delivery framework sends documents as PDF attachments through configured SMTP servers with customizable email templates. For automated B2B document exchange, LN integrates with EDI and e-invoicing platforms through ION-based document routing.

  • Configure SMTP server settings in LN system parameters for outbound email document delivery
  • Set up email templates with dynamic merge fields for recipient name, document number, and due dates
  • Enable PDF/A format for archived documents ensuring long-term readability and regulatory compliance
  • Route electronic invoices through ION to PEPPOL, Ariba, or country-specific e-invoicing networks
  • Implement delivery tracking and read receipts for critical documents using LN's output status monitoring

Try it here, free

Infor LN Sales Order Tables Reference (tdsls400, tdsls401 and related)

Open full tool

Searchable field-level map of the LN 10.x order-to-cash tables: quotations, contracts, sales orders, actual deliveries, history, invoices and business partner roles.

Streamlining LN document output? Netray's AI agents analyze your document workflows and recommend automation opportunities.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations