Infor SyteLine3 min readNetray Engineering Team

Setting Up EDI Trading Partners in SyteLine

Short answer

Every EDI relationship in SyteLine begins with a properly configured trading partner profile. The EDITradingPartner IDO stores ISA qualifiers, GS identifiers, communication settings, and transaction set agreements that determine how documents are enveloped, routed, and acknowledged. A single misconfigured qualifier can cause every outbound document to be rejected by the VAN or trading partner.

ISA and GS Envelope Configuration

The ISA (Interchange Control Header) and GS (Functional Group Header) segments define the identity of both sender and receiver. SyteLine's EDITradingPartner form stores these values and injects them into every outbound envelope. The ISA05/ISA07 qualifier codes (ZZ, 01, 08, 12) must match exactly what the trading partner expects, and the ISA06/ISA08 identifiers are padded to fixed lengths per the X12 standard.

  • Set ISA05 sender qualifier to match your assigned code type (ZZ for mutually defined, 01 for DUNS)
  • Configure ISA06 with your organization ID padded to exactly 15 characters in EDITradingPartner
  • Map ISA07/ISA08 to the trading partner's qualifier and ID from their onboarding documentation
  • Define GS02 (Application Sender) and GS03 (Application Receiver) codes for functional group routing
  • Enable ISA14 acknowledgment flag to request 997/999 functional acknowledgments automatically

Communication Protocol and VAN Settings

SyteLine supports AS2, SFTP, and VAN-based communication for EDI document exchange. The communication profile linked to each trading partner in the EDICommProfile table defines connection parameters, encryption requirements, and retry policies. AS2 connections require MDN (Message Disposition Notification) configuration for delivery confirmation.

  • Configure AS2 URL, certificate, and MDN settings in EDICommProfile for direct connections
  • Set SFTP host, port, directory paths, and SSH key for file-based exchange partners
  • Define VAN mailbox routing with sender/receiver IDs matching ISA envelope qualifiers
  • Enable automatic retry with exponential backoff for failed transmission attempts
  • Set up communication logging in SLEDILog table for audit trail and troubleshooting

Transaction Set Agreements and Mapping Profiles

) are exchanged, their direction, and which mapping profile to use. The EDITSAgreement IDO links a trading partner to specific inbound and outbound maps stored in EDIMap, ensuring the correct field transformations are applied per partner.

  • Create transaction set agreements for each document type and direction in EDITSAgreement
  • Link inbound 850 maps to the partner-specific mapping profile in EDIMap IDO
  • Configure outbound 856 and 810 maps with partner-specific segment requirements
  • Set processing priority and batch schedule per transaction set agreement
  • Define error handling rules: reject, hold for review, or auto-correct per agreement

Try it here, free

SyteLine AI Integration Readiness Assessment

Open full tool

Score your SyteLine environment across version, IDO and ION API maturity, data quality, integration middleware, and organizational readiness for an AI layer.

Automate trading partner onboarding in SyteLine with Netray's AI-powered EDI configuration agents, get started today.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

Runs with your ERP

Guides

AI on your ERP

Comparisons