Location Hierarchy Design
SyteLine organizes warehouse locations through a hierarchy of Site, Warehouse, and Location records. The Sites form defines each physical facility, the Warehouses form (SLWhses IDO) creates storage areas within a site, and the Locations form (SLLocations IDO) defines individual storage positions. The location field on the whse_loc table supports structured naming conventions like ZONE-AISLE-RACK-BIN for easy identification.
- Define sites on the Sites form for each physical facility with address and timezone configuration
- Create warehouses under each site using the SLWhses IDO with default GL accounts and costing groups
- Configure locations with structured naming (e.g., A-01-03-B for Zone A, Aisle 01, Rack 03, Bin B)
- Set location types including Bulk, Pick, Stage, QC Hold, Shipping Dock, and Receiving Dock
- Enable ranked location sequences for directed put-away using the loc_rank field on each location record
Location Properties and Constraints
Each location record in the whse_loc table carries properties that control what can be stored and how transactions interact with it. The loc_type field determines whether a location is a standard storage bin, a staging area, or an inspection hold zone. Capacity constraints including max_qty, max_weight, and max_volume prevent over-stocking.
The perm_item_flag restricts locations to specific items for dedicated storage strategies.
- Set max_qty, max_weight, and max_volume on locations to enforce physical capacity limits during put-away
- Use perm_item_flag to dedicate locations to specific items for high-velocity or hazardous material storage
- Configure loc_type to control transaction behavior: QC Hold locations block picking until release
- Enable mixed_items flag to allow multiple item numbers in a single location for smaller components
- Define default_loc on the item-warehouse record (SLItemWhse IDO) for automatic put-away routing
Location Integration with Transactions
Once locations are configured, all inventory transactions reference specific locations. PO receipts direct items to receiving dock locations, then put-away transactions move them to storage. The Pick/Pack/Ship process pulls from pick locations based on allocation rules.
The loc field appears on every transaction record in the matltran table, enabling location-level inventory accuracy tracking.
- Material Receipts default to the warehouse receiving location before put-away processing
- Put-away transactions move received goods from dock to storage using directed or manual location selection
- Picking operations allocate from locations based on FIFO, FEFO, or location rank sequences
- Transfer transactions between locations maintain full audit trail in the matltran table
- Location-level on-hand queries via the SLItemLocations IDO support real-time inventory visibility
Try it here, free
SyteLine Cycle Count Variance Worksheet
An editable cycle count sheet that computes variance quantity, variance value and record accuracy per line and overall.
Optimize your SyteLine warehouse layout—connect with our warehouse configuration specialists today.