A Netray ProductOpen Claw for Industries

See Your Industry.
Transformed.

Simulate your operations AS-IS and WITH Open Claw before you invest a single rupee.

28 verticals. 600+ use cases. Free to simulate.

$0B
Global Industrial AI Market
0.7%
India Mfg. AI CAGR
0
Industry Verticals
0+
Pre-built Use Cases

The $154B Opportunity Nobody Is Solving for India

Global industrial AI will hit $154B by 2030. Indian manufacturers are locked out by cost, complexity, and compliance gaps.

64M
Indian MSMEs
Less than 15% use any form of AI
$200K+
Existing Platform Cost
vs. $40K average manufacturer budget
6-18mo
Traditional Deployment
ClawRay: remote install in days
0
Indian-Built Alternatives
Until now. Built for Indian compliance.

Why ClawRay

Industrial AI that actually fits Indian manufacturing reality.

Open Claw, Not Generic Cloud

Purpose-built AI for factory floors. Not a chatbot with a hard hat.

Simulate Before You Invest

See ROI in a 3-state simulation: AS-IS, IN-TRANSITION, WITH Open Claw.

Air-Gap Ready

Full on-premise deployment. No data leaves your plant. Ever.

Built for Indian Compliance

FSSAI, BIS, CPCB, IATF, Schedule M, AS9100 out of the box.

Free for Association Members

Verified members of recognized industry associations deploy free.

ROI in Your Language

Units, manpower, downtime saved. Not cloud metrics. Real factory metrics.

How It Works

From simulation to deployment in four steps.

01

Select Your Industry

28 verticals, 96+ sub-verticals. From pharma to steel to textiles.

02

Run Your Simulation

See your operations AS-IS, IN-TRANSITION, and WITH Open Claw side by side.

03

Build Your Bundle

Mix and match from 600+ use cases. Custom transformation plan.

04

Deploy Free or On-Site

Remote install for association members. On-premise for deeper integration.

Real Impact. Real Numbers.

What happens when Open Claw meets your factory floor.

Downtime
12 hrs/mo1.8 hrs/mo
85% improvement
Quality Rejection
4.2%0.3%
93% improvement
Energy Cost/Unit
Rs.2.4Rs.1.5
37% improvement
Order Fulfillment
78%96%
23% improvement

0 Industry Verticals

Purpose-built AI for every corner of Indian manufacturing.

Aerospace & Defence
Automotive
Chemicals
Pharmaceuticals
Steel & Metals
Engineering
Textiles & Apparel
Food Processing
Electronics
Power & Energy
Logistics
Construction

+ 16 more verticals with 96+ sub-verticals

Why Not Them?

Existing platforms cost more than most Indian manufacturers earn in a year.

Palantir
$500K-$2M/yrIndia: No
C3.ai
$500K-$5M/yrIndia: No
Sight Machine
$200K-$1M/yrIndia: No
Rockwell
Locked pricingIndia: No
ClawRay
Free to simulateBuilt for India

Leaders Already Proved It Works

The world's top manufacturers are running AI on their floors. ClawRay brings that capability to every Indian factory.

Tata Steel
$2B
digital transformation savings with 600+ AI tools
BMW
1 car / 57s
AI-inspected at 99.98% accuracy
Bosch
97.6%
defect detection (up from 89%), $1.2M saved/yr per line
GSK Pharma
15,000+
variables monitored, 18% fewer batch rejections

Compliance-Native from Day One

Pre-configured for Indian regulatory frameworks

FSSAI
BIS
CPCB
IATF 16949
Schedule M
AS9100
GMP
ISO 22000

Ready to See Your Factory Transformed?

Free to simulate. Free for association members to deploy.
No data science team needed. No cloud lock-in.

Remote InstallAir-Gap DeploymentDays, Not Months