Specialist ERPsERP Platform

GLOVIA G2 + on-prem AI

AI for Fujitsu GLOVIA G2 that stays inside your contract boundary

Short answer

AI on Fujitsu GLOVIA G2 works best as a private layer that reads order management, configurable BOM, and engineering change data through GLOVIA's own APIs, then answers questions and drafts routine transactions without any contract or technical data leaving the customer's network. For most GLOVIA G2 shops running government or prime-contractor work, that means a self-hosted model, not a vendor's shared cloud AI service.

ERP
Fujitsu GLOVIA G2
Industries
Aerospace, Defense
Written for
IT Director

GLOVIA G2 is not a mainstream ERP most consultants can quote from memory. Fujitsu Glovia built it for exactly the kind of manufacturer that ends up reading this page: engineer-to-order and configure-to-order aerospace and defense suppliers running multi-level BOMs, engineering change orders, and cost-plus or FFP government contracts side by side with commercial work. That combination of configuration complexity and contract accounting rigor is why GLOVIA G2 shops tend to be smaller, tighter IT teams than SAP or Oracle sites, and why every new system has to prove it will not put export-controlled or CUI data somewhere it should not be.

The practical pain shows up as reporting and access, not as a lack of data. GLOVIA G2 holds accurate order status, configurable BOM structure, and engineering change history, but getting a plain-English answer out of it usually means a planner or program manager waiting on a report request, or opening several screens to reconstruct the current configuration of a make-to-order unit. Add DCAA-compliant job costing and the numbers most people actually want, current burden rate against a contract, unbilled WIP by job, sit behind finance-only views.

Public AI assistants are a non-starter here. Most GLOVIA G2 customers carry ITAR technical data, DFARS 252.204-7012 obligations, or both, and a browser-based copilot that sends a BOM description or a contract line item to a third-party API is a compliance incident waiting to happen, regardless of the vendor's terms of service. The fix is architectural: keep the model, the retrieval layer, and the logs on hardware you control, and treat GLOVIA G2 as a read source through its own web services rather than as a place to bolt on a SaaS chatbot.

This page is deliberately general about GLOVIA G2's internal object model. Fujitsu Glovia's implementation partners and your own DBAs know the exact table and API names for your version; we are not going to guess at specifics we cannot verify. What we can describe with confidence is the architecture that works for a system like GLOVIA G2, an Oracle-backed, API-addressable ERP with heavy configuration and government contract accounting, and where a private AI layer earns its keep fastest.

What usually gets in the way

The problems we hear most from it director teams running Fujitsu GLOVIA G2.

Configuration status is locked behind screens

Reconstructing the as-configured BOM and current engineering revision for a specific sales order or work order takes navigating several GLOVIA G2 screens, and program managers end up asking engineering or planning instead of self-serving.

Contract cost visibility is finance-only

Unbilled WIP, burden rate variance, and funding remaining on a contract line live in cost accounting views that operations and program staff cannot query directly, so status updates travel by email instead of by report.

Engineering change impact is manual

When an ECO changes a component on a configurable BOM, tracing every open order, work order, and inventory lot affected is a manual cross-reference exercise, which is exactly the kind of task an LLM with real ERP access should shorten.

Small IT teams, specialist system

GLOVIA G2 shops rarely have a bench of in-house developers who know the platform deeply, so any AI project has to work with existing integration points rather than assume a large internal engineering capacity.

Export control and CUI boundaries

Technical data tied to defense programs cannot pass through a public AI API, which rules out most off-the-shelf copilots and pushes the requirement toward on-prem or sovereign-cloud deployment by default.

Where AI earns its place in Fujitsu GLOVIA G2

Each use case names the ERP objects it reads or writes, so your ERP team can judge the integration effort before anyone commits budget.

Plain-language order and configuration status

Program managers and customer service ask for the current status, configuration, and open engineering changes on a sales order in ordinary language instead of navigating multiple GLOVIA G2 screens.

Touches: Sales order and configurable BOM records, work order status, engineering change records

Outcome: Cuts routine status lookups from a multi-screen search to a single answer with the source record cited

Engineering change impact assistant

When an ECO is proposed, an agent traces every open order, work order, and on-hand inventory lot referencing the affected part or revision and drafts an impact summary for engineering sign-off.

Touches: Engineering change records, BOM structure, open order and work order lines, inventory lots

Outcome: Turns a multi-hour manual cross-reference into a reviewed draft in minutes, with a human approving before anything is posted

Contract cost and WIP narration for program reviews

Ahead of a program review, an agent pulls unbilled WIP, burden variance, and funding remaining by contract line and drafts plain-English commentary for the program manager to check and present.

Touches: Job costing and contract accounting records, burden rate tables

Outcome: Shortens program review prep from a finance data pull plus manual write-up to a reviewed first draft

Purchase order and supplier follow-up drafting

For routine POs approaching their promise date, an agent drafts a status inquiry email to the supplier referencing the PO line, quantity, and need date, for the buyer to review and send.

Touches: Purchase order lines, vendor records, receiving history

Outcome: Reduces time buyers spend writing routine follow-up emails on non-critical lines

Quality and non-conformance drafting

For a logged non-conformance, an agent assembles the affected part, lot, order history, and prior similar findings into a draft disposition memo aligned to AS9100 documentation expectations.

Touches: Quality and non-conformance records, part and lot history, prior corrective actions

Outcome: Cuts first-draft time on routine non-conformance documentation while keeping the quality engineer as the final author

Government contract compliance question answering

Contracts and finance staff ask an agent to explain how a specific FAR or DFARS clause maps to current GLOVIA G2 cost accounting setup, grounded in the actual chart of accounts and cost pools rather than generic web answers.

Touches: Cost accounting configuration, contract records, indirect rate pools

Outcome: Gives contracts staff a faster, source-grounded starting point instead of relying on institutional memory alone

New-hire and cross-training assistant

Because GLOVIA G2 knowledge is concentrated in a few long-tenured staff, an agent trained on internal procedures and screen flows answers how-to questions for new planners and buyers.

Touches: Internal SOP documents plus read access to relevant transaction screens for context

Outcome: Shortens ramp time for new staff on a system with a thin external talent pool

Reference architecture

A private layer sits beside GLOVIA G2, reading order, BOM, engineering, and cost data through its web services and database views, grounding a locally hosted model, and writing back only through approved, human-reviewed transactions.

  1. 1

    GLOVIA G2 connector

    Reads order management, configurable BOM, engineering change, and cost accounting data through GLOVIA's web services and, where authorized, read-only database views.

  2. 2

    Data and semantic layer

    Normalizes GLOVIA objects, BOM configurations, and cost pool structures into a consistent schema the model can query and cite accurately.

  3. 3

    Model serving

    An open-weight model (Llama, Qwen, or Mistral class) served on customer-owned or customer-controlled GPUs, sized to concurrent user load.

  4. 4

    Retrieval and agents

    Retrieval-augmented answers grounded in live GLOVIA data and engineering or contract documents, with agent actions scoped to specific, pre-approved transaction types.

  5. 5

    Governance and audit

    Every query and draft action is logged with the source records used, role-based access mirrors GLOVIA's own security, and no write-back happens without human approval.

Integration notes for your ERP team

  • Read access goes through GLOVIA G2's supported web services and reporting views wherever available, rather than direct table writes.
  • Configurable BOM structures are normalized so the model can explain a specific unit's as-built configuration accurately, not just its base part number.
  • Cost accounting integration respects existing role-based security; users only see cost pool and rate detail they are already entitled to see in GLOVIA G2.
  • Any write-back, an approved engineering change note, a drafted PO follow-up, a filed non-conformance, goes through a staged approval queue, never a direct API write.
  • Document grounding includes engineering drawings, SOPs, and prior contract correspondence stored outside GLOVIA G2, indexed alongside the transactional data.
  • Model updates and retrieval index refreshes run on a schedule the customer controls, with no dependency on an external vendor's release cycle for data freshness.

Deployment options

Air-gapped on-prem

Programs carrying ITAR technical data or classified-adjacent CUI

Model, retrieval index, and logs run entirely on customer hardware with no outbound network path, matching how the GLOVIA G2 database itself is typically isolated.

Private or sovereign cloud

Commercial A&D suppliers without a hard air-gap requirement

Deployed in a dedicated tenant or the customer's own cloud account, keeping data under contractual and geographic control without the overhead of physical isolation.

Hybrid

Sites that want to pilot before committing hardware budget

Start on a rented GPU instance for evaluation, then move the same stack on-prem once usage patterns and value are proven.

Compliance and data control

How the architecture supports your obligations. Certification and accountability stay with your organisation; the design keeps the evidence straightforward.

ITAR

Technical data referenced by the model stays on infrastructure the customer controls, avoiding any deemed-export exposure from a public AI API.

DFARS 252.204-7012 / NIST SP 800-171

AI infrastructure is designed to sit inside the same controlled environment as GLOVIA G2 itself, subject to the same access and logging controls.

DCAA cost accounting

AI-drafted cost commentary is clearly labeled as a draft citing source records, never posted or submitted without a human reviewer in the loop.

AS9100

Quality and non-conformance drafting follows existing documentation formats and requires quality engineer sign-off before any record is finalized.

How an engagement runs

Phase 1 . 2-3 weeks

Discovery

  • -GLOVIA G2 API and data access inventory
  • -Prioritized use case list by pain and feasibility
  • -Deployment boundary decision (air-gapped vs private cloud)

Phase 2 . 6-8 weeks

Pilot

  • -Working connector to order, BOM, and cost data
  • -One or two use cases live for a pilot group
  • -Accuracy and grounding review against source records

Phase 3 . 4-6 weeks

Production

  • -Role-based access matching GLOVIA G2 security groups
  • -Approval workflow for any write-back actions
  • -Audit logging and monitoring in place

Phase 4 . Ongoing

Scale

  • -Additional use cases added by priority
  • -Model and hardware right-sizing as usage grows
  • -Quarterly review of accuracy and coverage

Questions to ask any vendor, including us

A short list that separates real Fujitsu GLOVIA G2 AI work from a chatbot demo.

  1. Does any part of this solution send GLOVIA G2 data to a shared, multi-tenant AI service?
  2. Can the vendor name the specific GLOVIA G2 API or view each use case reads from?
  3. Who owns the model weights and the retrieval index if we end the engagement?
  4. What happens to a write-back action if the AI's draft is wrong, is there always a human approval step?
  5. How is access scoped so a buyer cannot see cost pool detail they are not authorized to see today?
  6. What is the realistic GPU sizing and cost for our expected concurrent user count?
  7. How does the vendor handle a GLOVIA G2 version upgrade that changes the underlying API surface?

Frequently asked questions

Is there an off-the-shelf AI copilot for Fujitsu GLOVIA G2?

Not in the way SAP or Microsoft ship one for their own ERPs. GLOVIA G2 customers who want generative AI today are building or commissioning a private layer that reads GLOVIA's data through its APIs rather than waiting on a vendor feature.

Can AI safely touch DCAA-relevant cost data?

Yes, if it is read-only for reporting and any drafted commentary is clearly marked as a draft requiring human review before it feeds a contract deliverable. AI should never post or submit cost accounting entries on its own.

Does this require replacing or upgrading GLOVIA G2?

No. The AI layer reads from your current version through supported APIs and views; it does not require a version upgrade or a change to how GLOVIA G2 itself operates.

What models are realistic for a shop this size?

Open-weight models in the 7B to 70B parameter range, served on one to a few GPUs, are typically sufficient for question answering and drafting tasks grounded in GLOVIA data, without needing frontier-scale infrastructure.

How do you handle export-controlled technical data in the BOM or engineering records?

The model and its retrieval index run entirely on infrastructure the customer controls, with no outbound calls to a third-party API, so technical data never leaves the boundary it is already required to stay inside.

Can engineering change impact analysis actually be trusted?

The agent produces a draft impact list citing the specific orders, work orders, and lots it found; engineering still reviews and signs off. It replaces the manual search, not the engineering judgment.

What does a pilot cost roughly?

Costs vary by GPU sizing and integration scope, but a focused pilot on one or two use cases is typically the fastest way to get a real number for your environment rather than a generic estimate.

Talk it through with an engineer who knows Fujitsu GLOVIA G2

Bring one real question your team cannot answer from the ERP today. We will map the data path, the model, and where it runs, and tell you honestly if AI is the wrong tool for it.

Try it here, free

Engineering Change Management Maturity Assessment

Open full tool

Ten-question self-assessment that scores how controlled your engineering change process is and gives practical next steps for your score band.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs

Integrations

Troubleshooting

Comparisons