Connect a Birst Space to Infor Data Lake and build a report
how to connect birst to infor data lake
Also searched as
- birst live access infor data lake setup
- build a birst space for infor cloudsuite
- infor birst source connection how to
- birst report from ion data
Short answer
Birst is Infor's embedded BI layer, and the recommended way to report on live Data Lake data is a Live Access source inside a Birst Space rather than a static upload. Build the logical model over a filtered set of tables, apply row-level security, and publish the dashboard to a Ming.le homepage so users reach it without leaving Infor OS.
Applies to: Infor OS Portal, Birst, Infor Data Lake, CloudSuite tenants with Birst provisioned
Connect a Birst Space to Infor Data Lake and build a report
- 1In Birst, accessed from Infor OS Portal or directly at the tenant's Birst URL, create or open a Space for the reporting subject area, for example Finance or Manufacturing.
- 2Go to Sources and add a new source, choosing the Live Access connection type for Infor Data Lake rather than a file upload, so the report queries current lake data instead of a static extract.
- 3Point the Live Access source at the same catalog/schema visible in Compass, and select only the tables needed for this subject area to keep the model manageable and fast.
- 4Build the logical model in Birst's Data Modeler - define hierarchies such as Fiscal Calendar, Item, or Customer, and the relationships between the fact table and the dimension tables just added.
- 5Open Visualizer and drag measures and attributes onto a canvas to build the first chart, then save it to a Dashboard so it can be shared with other users.
- 6Set row-level security if the report needs to be restricted by company, site, or business unit, using Birst's user attributes tied to the viewer's Infor OS identity.
- 7Confirm the refresh behavior - Live Access queries live, so validate a handful of report totals against a known report in the source application before publishing broadly.
- 8Publish the Dashboard and assign it to the relevant Infor OS homepage or Ming.le drawer so users reach it inside the portal instead of a separate Birst login.
Birst's place in the Infor OS stack
Birst is Infor's embedded, multi-tenant business intelligence platform, tightly tied to ION and Infor Data Lake. Where Compass is aimed at ad hoc SQL for someone who already knows what they are querying, Birst is aimed at recurring, secured, business-user-facing dashboards built on a modeled semantic layer rather than raw tables.
Live Access vs data upload
A Birst source can either query Data Lake directly through Live Access or ingest a curated extract on a schedule. Live Access keeps the dashboard current with the lake's own publish cadence and avoids maintaining a separate copy of the data, but every dashboard query then depends on the lake's performance and latency. A scheduled extract can be faster for very large fact tables at the cost of the data being only as current as the last load.
Building the logical model
Birst's Data Modeler expects a reasonably conventional star schema - a fact table with measures joined to dimension tables through defined keys. The most common mistake when modeling directly against Data Lake tables is missing or mismatched join keys between a BOD-derived fact table and a dimension table that was populated by a different BOD, which silently produces duplicated or dropped rows in reports rather than an obvious error.
Security and rollout
Row-level security in Birst is enforced through user attributes, which can be tied to the viewer's Infor OS identity so the same dashboard shows different rows to different users, for example by company or site. This matters even for internal dashboards, since Data Lake tables often span every company or site a tenant has ever operated, not just the one the viewer is authorized to see.
Try it here, free
Infor Data Lake Compass SQL API Request Generator
Fill in your ION API base URL, tenant and SQL to get working Python and curl code for the Compass v2 job, status and paged result calls.
Common pitfalls
- !Modeling directly against a huge Data Lake fact table without filtering it down first, producing slow dashboards.
- !Skipping row-level security setup and exposing cross-company or cross-site data to users who should only see their own.
- !Building reports against Data Lake tables that have publish latency, then getting confused when numbers do not match a live app report taken minutes earlier.
- !Not validating a few known totals against a source application report before rolling a new dashboard out broadly.
- !Mixing Live Access and uploaded sources in the same model without understanding which parts refresh live and which do not.
How an ERP-grounded AI assistant handles this
At the reporting layer, an assistant grounded on a Space's logical model can help a user find the right existing dashboard for a business question rather than hunting through Spaces and Sources by hand, and it can flag when a figure looks stale relative to Data Lake publish latency instead of presenting it as real-time. It works within the Space's existing row-level security rather than bypassing it, so a user still only sees what their Birst permissions already allow.
Frequently asked questions
What is the difference between Birst and Compass?
Compass is for ad hoc SQL against Data Lake tables, best for someone who knows what they want to query. Birst adds a modeled, secured, and dashboard-ready semantic layer on top of the same lake data, better suited to recurring reports used by business users.
Does Birst require Data Lake, or can it use direct app connections?
Birst commonly connects to Infor Data Lake through Live Access, but it can also model other sources depending on the tenant's Birst configuration. For CloudSuite reporting the Data Lake route is the most common and best supported path.
Can I restrict a Birst dashboard by company or site?
Yes, using row-level security tied to user attributes in Birst, mapped to the viewer's Infor OS identity. This lets one dashboard definition show different rows to different users without building a separate dashboard per company or site.
Where do users find published Birst dashboards?
A published dashboard can be assigned to an Infor OS homepage or a Ming.le drawer, so users reach it inside the portal they already use, rather than needing a separate Birst login or bookmark.
Related
How to query Infor Data Lake with Compass SQL
Compass is the SQL query layer in Infor OS for querying Infor Data Lake, where flattened copies of BODs published over ION are stored by Noun and Verb. Open a Compass SQL Workbench tab, browse the schema for the correct table, and run a filtered SELECT rather than pulling the full history, since Data Lake tables can hold years of append-only data.
Error fixFix a Ming.le homepage widget that will not load
A blank or endlessly spinning Ming.le widget is usually a permissions, session, or backend availability problem, not a broken widget itself. Confirm the issue is widget-specific, check the user's Security Group access to the underlying app, and look at the widget's network calls in browser dev tools to see whether it is failing with 401/403 or simply timing out against a down service.
Error fixDiagnose and fix a failed BOD document flow in ION Desk
A Document Flow showing Failed in ION Desk means a BOD (Business Object Document) stopped either at schema validation, at the mapping step, or at the target application. Open the failed instance's detail to see the exact failing element, fix the source data or mapping, then use Resubmit rather than re-triggering the original transaction to avoid duplicates.
Error fixFix a 401 Unauthorized error from Infor ION API
A 401 from ION API almost always means the credentials in the .ionapi file no longer match what ION API Gateway expects - not that the password is simply wrong. Check whether the Authorized App or service account behind the file was revoked, regenerated, expired, or issued for a different tenant, then re-test with a direct OAuth2 client_credentials call before touching any calling code.
How-toHow to Create an .ionapi File and Service Account in Infor OS
An .ionapi file is a JSON credentials file you download from ION API after registering an Authorized App of type Backend Service and creating a service account for it. It carries the tenant, client id, client secret, the token and authorization endpoints, and the service account keys that your scripts or integrations use to request an OAuth 2.0 access token.
How-toHow to Search and Upload Documents with the Infor IDM REST API
Infor Document Management (IDM) exposes REST services through ION API under the IDM path of your tenant. You search items with a $query expression written against an entity and its attributes, read the returned resource links to fetch the file, and create new items with a multipart request that carries an XML description of the entity and attributes plus the file stream.
AI for ERPA Private LLM Grounded on Your ERP Data
How a private LLM answers questions on your ERP data: RAG plus text-to-SQL, role-based permissions inherited from the ERP, and where each fits.
AI for ERPNatural Language Query for ERP Data: Ask SAP, Infor, or Oracle a Question in Plain English
See how natural language query over SAP, Infor, Oracle, and NetSuite data works: grounded text-to-SQL, role-based permissions, and a visible audit trail.
Stuck on Infor OS / Birst?
Talk to engineers who work inside Infor OS / Birst every week, and who build private AI that answers these questions from your own ERP data.
Keep exploring
Free tools
- Infor Data Lake Compass SQL API Request GeneratorFill in your ION API base URL, tenant and SQL to get working Python and curl code for the Compass v2 job, status and paged result calls.
- Infor LN Logical Table Sharing Design WorksheetPlan which LN tables a logical company reads from a physical company, including the reference tables that must be shared with them, before you touch Logical Tables.
ERP fixes and how-tos
- Infor Birst API: Web Services for Data Loading and AutomationHow to use the Birst web services API to log in, upload data, publish a space and run queries from scripts, with a safe automation pattern and error handling.
- Infor Birst Dynamic Groups for Row-Level Data AccessHow to restrict Infor Birst data by user with dynamic groups and filters: the security table pattern, session variables, testing, and common mistakes.
- Infor Birst: Documentation, BQL and Smart Insights ExplainedA practical Infor Birst starting guide: where the documentation lives, what BQL is, how Smart Insights works and how to build your first report from ERP data.
Guides
- Infor Data Lake Setup and Analytics ConfigurationConfigure Infor Data Lake for CloudSuite Industrial with data replication, schema mapping, Birst analytics integration, and custom reporting for enterprise insights.
- Birst BI Integration with SyteLineIntegrate Infor Birst analytics with SyteLine for advanced BI dashboards, automated data pipelines, and manufacturing analytics in CloudSuite Industrial.
- Infor Birst Analytics: Integration and ConfigurationConfigure Infor Birst analytics for CloudSuite applications. Data connections, dashboard design, embedded analytics, and performance optimization.
AI on your ERP
- AI on Infor Birst and ERP Analytics: Natural-Language Answers Beside Your DashboardsHow AI works with Infor Birst and ERP analytics: what Birst does well, where natural-language answers help, live versus replicated data, and private options.
- AI Agents Over Infor ION API, BODs, and the Infor Data LakeBuild AI agents on Infor ION API Gateway, BODs, and Data Lake, alongside or instead of Infor's own GenAI features, with your choice of model and hosting.
Integrations
- How to connect Power BI to Infor M3How to connect Power BI to Infor M3: Data Lake and Compass, direct database, or API options, on-prem gateway, key manufacturing dashboards, and natural-language Q&A.
- How to connect Power BI to Infor LNHow to connect Power BI to Infor LN: direct database, ION and Data Lake options, on-prem data gateway, key manufacturing dashboards and adding natural-language Q&A.