What Is API Gateway?
Also known as: API management, API proxy, API gateway ERP
Definition
An API gateway is a server that sits in front of one or more back-end services and acts as their single entry point. It authenticates callers, enforces rate limits, routes requests, and logs traffic so each back end does not have to.
API Gateway Explained
Without a gateway every service handles its own authentication, throttling and logging, and every client must know each service address. A gateway centralizes these concerns. Typical features are API key or OAuth 2.0 token validation, rate limiting and quotas, request and response transformation, caching, TLS termination, versioned routes and an audit log of every call.
For ERPs the value is protection and control. An ERP API is often expensive to call and has limited concurrency, and a runaway script or a new integration can slow down order entry. A gateway can cap calls per client, block unknown callers, and hide the ERP's own address and credentials. It also lets a team expose a stable, curated set of endpoints while the ERP behind it changes during an upgrade.
Gateways come as products (Kong, Apigee, AWS API Gateway, Azure API Management, WSO2 and others) and as built-in features of an integration platform such as Infor ION API. On-premises deployments often use an open-source gateway in the DMZ so no traffic leaves the network.
For AI agents the gateway becomes a policy point. An agent should call the ERP through a narrow, read-only route with a service identity, not through a shared admin login. The gateway records which agent asked what and when, which supports audit, and it can block write methods unless a human approval token is present.
Why It Matters
- It protects the ERP from overload and from callers that should not reach it.
- Central logging gives a single audit trail of who called which ERP endpoint.
- It decouples clients from the ERP, so upgrades and migrations break fewer integrations.
- It is the natural place to enforce read-only access and approvals for AI agents.
In Practice
A plant exposes three ERP lookups to a chatbot: item availability, open orders and work order status. A gateway route maps each to the ERP API, allows only GET, limits the bot's service account to 60 calls a minute, and logs every request with the user on whose behalf it ran. When an upgrade changes the underlying ERP endpoints, only the gateway mapping changes and the chatbot keeps working.
Frequently Asked Questions
Is an API gateway the same as middleware?
No. A gateway manages access to APIs: security, limits, routing. Middleware or an iPaaS moves and transforms data between systems. Some products do both.
Do I need an API gateway for an on-prem ERP?
It is advisable when external systems or AI agents call the ERP, because it adds authentication, throttling and logs the ERP may lack.
Can a gateway run without the cloud?
Yes. Several gateways are open source or self-hosted and can run inside a private network.
Does a gateway make AI access safer?
It helps by limiting methods, rate and scope, and recording calls. It does not replace ERP role security or human approval on writes.
Related Terms
API (Application Programming Interface)
An API (Application Programming Interface) is a defined contract that lets one software system request data or trigger functions in another, specifying the available operations, the structure of requests and responses, and the rules for authentication and error handling.
REST API
A REST API is a web interface that exposes application data as addressable resources over HTTP, using standard verbs such as GET, POST, PUT, PATCH, and DELETE, stateless requests, and conventional status codes, typically exchanging JSON.
Middleware
Middleware is software that sits between applications and handles the communication, transformation, routing, and reliability concerns of moving data between them, so that the applications themselves do not need to know about each other directly.
Webhook
A webhook is an HTTP callback in which a source system automatically sends an HTTP request to a subscriber-provided URL when a defined event occurs, pushing notification to the consumer instead of requiring the consumer to poll for changes.
MCP (Model Context Protocol)
MCP (Model Context Protocol) is an open standard that defines how AI applications connect to external tools and data sources, so any compliant client can use any compliant server without custom integration code for each pair.
Working with API Gateway in a live environment? Our engineers do this every day - and our AI agents automate most of it.
Try it here, free
API Gateway Capacity Calculator
Size node count and monthly infrastructure cost for an API gateway from peak requests per second, payload size, and latency SLA requirements.
Keep exploring
Free tools
- API Gateway Capacity CalculatorSize node count and monthly infrastructure cost for an API gateway from peak requests per second, payload size, and latency SLA requirements.
- Infor ION API Gateway OAuth Token Request Generator (.ionapi)Turn the values in a downloaded .ionapi file into code that requests a token from the Infor authorization server, calls the ION API Gateway and revokes the token.
- Infor M3 MI API and ION API Gateway Security ChecklistSecurity checklist for on-prem M3 13.x integrations using MI programs over REST and the ION API gateway: accounts, authorization, transport, monitoring and lifecycle.
ERP fixes and how-tos
- Infor ION API Connection Point and Enterprise Connector SetupHow to set up an API connection point and an enterprise connector in Infor ION, and what changes between cloud and on-premise deployments.
- ERP Integration Architecture: API vs iPaaS vs ETLHow a CTO should choose between direct ERP APIs, an iPaaS and ETL: a decision rule by data direction, latency and volume, plus the failure modes of each.
- Oracle EBS REST API: Integrated SOA Gateway and PL/SQL APIsOracle EBS REST and SOAP APIs through Integrated SOA Gateway: find APIs in the Integration Repository, deploy, grant access and call PL/SQL public APIs.
Guides
- Infor ION Connect API Gateway Setup GuideConfigure Infor ION Connect API Gateway with OAuth2 authentication, endpoint registration, rate limiting, and external system integration for CloudSuite.
- How to Set Up SyteLine ION IntegrationStep-by-step guide to configuring Infor ION integration with SyteLine CloudSuite Industrial. Learn connection points, BODs, document flows, and ION API gateway setup.
- Managing Rate Limits and Throttling in SyteLine REST APIsManage SyteLine REST API rate limits and throttling. Configure request quotas, implement backoff strategies, and optimize throughput for CloudSuite Industrial APIs.
AI on your ERP
- AI Agents Over Infor ION API, BODs, and the Infor Data LakeBuild AI agents on Infor ION API Gateway, BODs, and Data Lake, alongside or instead of Infor's own GenAI features, with your choice of model and hosting.
- AI Agents for Oracle E-Business Suite, With Approved Actions Through Public APIsAI agents for Oracle E-Business Suite 12.2 and 12.1: read-only first, then approved actions through public APIs, open interfaces and Integrated SOA Gateway.
Integrations
- How to connect Power BI to Infor SyteLineHow to connect Power BI to Infor SyteLine: direct SQL Server, IDO or ION API, data warehouse options, on-prem gateway, key dashboards, and natural-language Q&A.
- How to connect Power BI to Oracle E-Business SuiteConnect Power BI to Oracle E-Business Suite: Oracle connector, reporting replica, on-premises data gateway, manufacturing dashboards and natural-language Q&A.