What Is Audit Trail?
Also known as: ERP audit log, change log, system audit trail, audit logging
Definition
An audit trail is a secure, time-stamped record of who created, changed, approved or deleted data in a system, including old and new values. In an ERP it supports financial, quality and security audits.
Audit Trail Explained
An ERP audit trail captures the who, what, when and often why of a data change. A good entry holds the user, the date and time, the record and field, the old and new value, and the source such as UI, import or integration. It must be tamper-resistant, meaning ordinary users cannot edit or delete it.
Capabilities differ and often need to be switched on. NetSuite records a System Notes tab on most records and offers login audit and setup audit trails. Infor SyteLine can track changes through audit log settings on selected tables and fields, and the Event System can record additional detail. SAP keeps change documents for many objects. Few ERPs log everything by default because of storage and performance cost, so you choose which tables and fields matter.
What to log is a risk decision: price and cost changes, vendor bank details, user and role changes, inventory adjustments, BOM and routing revisions, approvals, and posted journals. Regulated environments add more. 21 CFR Part 11 requires computer-generated, time-stamped audit trails for electronic records, and AS9100 and ISO 9001 expect traceable controlled changes.
Logs only help if someone reads them. Retention periods, protected storage, exception reports for sensitive changes and a defined review step turn an audit trail from a passive archive into a working control.
Why It Matters
- Auditors and customers ask to see evidence that sensitive changes were authorized and by whom.
- It speeds up root cause analysis when a cost, BOM or inventory balance changes unexpectedly.
- Logging everything without a plan bloats the database, while logging too little leaves gaps in an investigation.
- Agent and integration activity must appear in the trail under its own identity so automated changes are distinguishable from human ones.
In Practice
A plant discovers that a standard cost on a high-volume part dropped by 12 percent overnight and inventory value fell with it. The item cost audit log shows the user, the time and the old and new values, traced to a bulk import. The team adds a daily exception report for cost changes above a threshold and restricts the import role.
Frequently Asked Questions
Is the audit trail on by default in an ERP?
Usually only partly. Many ERPs record core changes, but field-level logging for sensitive tables often has to be configured deliberately because of storage and performance cost.
How long should audit logs be kept?
It depends on regulation and contract. Financial records often follow multi-year retention rules, and regulated industries may require longer. Confirm with compliance counsel and your auditors.
What is the difference between an audit trail and a transaction log?
A database transaction log supports recovery and is technical. An audit trail is a business-level record of who changed which data, designed to be read by auditors and investigators.
Related Terms
FDA 21 CFR Part 11
FDA 21 CFR Part 11 is the US regulation that defines the criteria under which the FDA accepts electronic records and electronic signatures as equivalent to paper records and handwritten signatures, requiring validation, audit trails, access controls, and signature integrity.
SOX (Sarbanes-Oxley) Compliance
SOX compliance is a US public company's obligation under the Sarbanes-Oxley Act of 2002 to establish, document, test, and certify internal control over financial reporting, including the IT general controls and segregation of duties in the systems that produce financial data.
Segregation of Duties (SoD)
Segregation of duties is an internal control that splits a sensitive process across different people so no single user can both create and approve a transaction, such as entering a vendor and also releasing its payment.
Traceability
Traceability is the ability to follow the history, location, and application of a part or material through the supply chain and production process, both backward to its sources and forward to every product and customer it reached.
Role-Based Access Control (RBAC)
Role-based access control grants ERP permissions to roles that match job functions, then assigns users to roles, instead of setting permissions user by user. It makes access consistent, reviewable and easier to remove.
Go Deeper
AI Audit Trail Readiness Checklist
A practical control checklist for building AI audit trails that satisfy compliance assessors, covering request-level logging, log integrity, identity evidence, and model lineage.
Free ToolERP Security Posture Checklist
Work through 30 concrete security controls across access, patching, network, data protection, and monitoring, with the highest-risk items flagged.
ERP Audit Trail Configuration Guide
Configure comprehensive ERP audit trails covering transaction logging, change tracking, data retention policies, and audit-ready reporting for SOX and ISO compliance.
ERP Security Best Practices Guide
Implement comprehensive ERP security best practices covering access control, encryption, monitoring, and compliance aligned with NIST CSF and CIS Controls frameworks.
ERP User Access Review Process Guide
Establish a structured ERP user access review process with review cycles, certification workflows, exception handling, and audit evidence for SOX and ISO compliance.
Working with Audit Trail in a live environment? Our engineers do this every day - and our AI agents automate most of it.
Try it here, free
NetSuite SuiteQL System Notes Audit Query Generator
Build SuiteQL over the systemnote table to audit field changes by record, user and date range, with a transaction join and a field discovery query.
Keep exploring
Free tools
- NetSuite SuiteQL System Notes Audit Query GeneratorBuild SuiteQL over the systemnote table to audit field changes by record, user and date range, with a transaction join and a field discovery query.
- AI Audit Trail Readiness ChecklistA practical control checklist for building AI audit trails that satisfy compliance assessors, covering request-level logging, log integrity, identity evidence, and model lineage.
- NetSuite Sandbox and Release Change Log WorksheetAn editable log of NetSuite changes across sandbox, release preview and production, with test status and hours spent, exportable to Excel.
Guides
- How to Configure Audit Trail in SyteLineStep-by-step guide to configuring audit trail functionality in Infor SyteLine. Set up change tracking, user activity logging, data integrity controls, and compliance reporting for regulatory requirements.
- Auditable Data Changes in SyteLine: Preview, Confirm, Record, UndoWhat a real audit trail for SyteLine data changes looks like: before/after values, attribution, undo. How governed editing brings AI-assisted changes under control.
- How to Set Up Event Logging in SyteLineConfigure event logging in Infor SyteLine for audit compliance, troubleshooting, and security monitoring including IDO events, user actions, and system alerts.