How to add document OCR to Infor VISUAL
Short answer
To add OCR to Infor VISUAL, scan or collect documents into a watched folder or inbox, extract fields with an OCR and language model pipeline, match them to POs and receipts in VISUAL, and queue low-confidence items for review. Post through a supported interface or a staging table.
Paper still moves through VISUAL shops: vendor invoices, packing slips, material certificates, inspection reports and customer drawings. The accounting team keys invoices against receipts, receiving staff look up POs from packing slips, and quality files certificates by hand.
OCR on its own is not the solution, because reading the text is the easy part. The value comes from matching what was read to what VISUAL knows: the PO, the receiver, the vendor, the part. That matching is what lets you flag discrepancies instead of just digitizing paper.
This page covers the document types that matter in a manufacturer and how to attach them to VISUAL records without compromising data quality.
What teams use it for
Vendor invoice capture
Invoices are read, matched to PO and receipt lines, and a payable voucher draft is prepared with differences highlighted.
Packing slip receiving
A slip is scanned at the dock, the PO is found, and quantities are suggested for the receiving transaction.
Certificate of conformance filing
Certs and mill test reports are read for heat or lot numbers and attached to the matching receipt or lot record.
Inspection report indexing
Scanned reports are tagged with part, work order and serial number so they can be found later.
Customer drawing intake
Drawing title blocks are read for part number and revision, and the file is linked to the part for engineering review.
Infor VISUAL integration surface
- Purchasing and receiving tables: PO, PO line and receiving structures supply the match targets. Confirm names and keys in your own schema and version.
- Payables: vendor invoice and voucher entry in VISUAL, which should be filled through a supported path and not by direct inserts.
- Lot and trace data: lot or heat records used when attaching certificates, depending on how you configure traceability.
- Attachments and document links: VISUAL supports attaching or linking files to records in various modules, though the exact mechanism depends on version and configuration.
- VISUAL API Toolkit: where licensed, the cleanest way to create or update transactions without bypassing business rules.
How it works
- 1
Define document types
Start with one, such as vendor invoices from your top ten suppliers. Each type needs its own fields and checks.
- 2
Set up capture
Use a scanner folder, an inbox, or a mobile photo upload. Store originals in a read-only archive immediately.
- 3
Run OCR and extraction
Use OCR for the text, then layout-aware and language-model extraction for fields. Record a confidence value per field.
- 4
Match to VISUAL
Find the vendor and PO, compare lines and quantities to receipts, and compute differences in price and quantity.
- 5
Review exceptions
Send anything below the threshold, or any mismatch beyond tolerance, to a review screen. Let clean documents flow through.
- 6
Post and link
Create the draft transaction through a supported route and link the original document to the record.
Example flows
Three-way match on an invoice
Trigger: A vendor invoice PDF lands in the accounts payable folder.
- Fields are extracted: vendor, invoice number, date, lines and totals.
- The service finds the PO and the receipts against it.
- Quantities and prices are compared within tolerance.
- A clean match becomes a draft voucher, and a mismatch goes to review.
Result: Accounts payable checks exceptions instead of typing every invoice.
Material cert filing
Trigger: Receiving scans a mill test report with a shipment.
- The heat number and material spec are read from the cert.
- The receipt line for that PO is found.
- The cert is compared against the required spec on the part.
- A pass is linked to the receipt, and a mismatch alerts quality.
Result: Traceability records are complete before the material reaches the floor.
Keeping data on-prem
Run the whole pipeline inside your network. OCR engines and open-weight vision-language models can run on a single GPU server, and the document archive and review screen can sit beside your VISUAL database. This avoids sending invoices, certs and drawings to an outside OCR service, which matters for ITAR, EAR or customer contract restrictions. Plan hardware by pages per day, not by headcount. A modest GPU handles typical job-shop volumes, but handwriting and poor scans lower accuracy whatever the platform, so keep a review step for those.
Security checklist
- Store originals in an access-controlled archive and never overwrite them.
- Restrict the review screen by role, since invoices and certs contain pricing and technical data.
- Require approval for changes to vendor bank details found on invoices.
- Log which fields were machine-read, which were corrected, and by whom.
- Exclude controlled documents from any external OCR service.
Ways to get it done
Dedicated AP or OCR product
Effort: Weeks
Good for invoices alone, if it has a tested path into VISUAL payables and the volumes justify the license.
Build in-house
Effort: Many weeks
Feasible for one or two document types if you have staff to tune extraction and maintain the VISUAL posting step.
Partner build with Netray
Effort: A few weeks per document family
Useful for an on-prem pipeline covering several document types with matching to VISUAL records and a review queue.
Pitfalls
- !Measuring OCR success by character accuracy instead of correct posted transactions.
- !Ignoring unit of measure and currency differences when comparing lines.
- !Auto-approving invoices without a receipt to match.
- !Mixing document types in one confidence threshold.
- !Forgetting multi-page documents and attachments split across emails.
Frequently asked questions
Does Infor VISUAL include OCR?
Not as a general capability that I know of. VISUAL can store and link documents, but reading and matching them needs additional software. Infor and its partners have offered document tools over time, so check what is available for your version before building your own.
How accurate will it be?
It depends on document quality and layout variety. Clean, typed invoices from repeat vendors can reach high accuracy, while scans, handwriting and unusual layouts do worse. Plan on a review queue and measure the share of documents that post without edits, rather than relying on a vendor claim.
Can it create the voucher automatically?
It can prepare one. A reasonable start is a draft voucher that a clerk approves. After a vendor has run cleanly for a while, you can allow automatic posting only when the PO, receipt, price and quantity all match within tolerance.
Can we keep drawings and certs off the cloud?
Yes. Local OCR and open-weight vision models can run on your own server, with the archive and review tool next to VISUAL. This is the usual approach for defense and aerospace suppliers whose contracts restrict where technical data can be processed.
How are scans connected to VISUAL records?
The pipeline stores the file in an archive and writes a link or attachment against the PO, receipt, lot or part, using the mechanism your VISUAL version supports. The key is to link through the record ID, not through a file name someone can rename.
Want Document OCR working on your Infor VISUAL?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
Infor VISUAL AI Assistant Sizing and Value Calculator
Size the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor VISUAL.
New to Infor VISUAL? Start with the Infor VISUAL guide and toolkit.
Keep exploring
Free tools
- Infor VISUAL AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor VISUAL.
- Infor VISUAL Manufacturing Scheduling ChecklistA practical checklist for finding why VISUAL schedules do not match the floor: calendars, resource data, routings, lead times and release habits.
- Infor VISUAL Private AI Layer Blueprint GeneratorFill in your Infor VISUAL environment and get a ready-to-share architecture plan for a private, on-prem AI assistant.
ERP fixes and how-tos
- Private AI Layer for Infor VISUAL On-Prem: Reference ArchitectureReference architecture to add a private AI assistant to Infor VISUAL on-prem: data access paths, retrieval, permissions, sizing and rollout, no cloud needed.
- Infor VISUAL report builder: build a custom work order reportHow to build and customise reports for Infor VISUAL using Crystal Reports and SQL, with a worked work order report example and the common tables involved.
- Infor VISUAL query tool and shop resource maintenanceHow to query Infor VISUAL data safely with SQL or the built-in query options, and how shop resources are defined and maintained for scheduling and costing.
Runs with your ERP
- 1 EDI Source EDI Integration with Infor VISUALHow 1 EDI Source connects Infor VISUAL to trading partners for EDI orders, invoices and ship notices via ION or direct API: setup, pitfalls and private AI.
- Infor VISUAL Shop Floor Mobile for Labor TrackingHow Infor VISUAL Shop Floor Mobile captures clock-ins and labor data from shop-floor devices directly into VISUAL: data flow, setup, pitfalls and private AI.
- RF Plus and Infor VISUAL ERP: mobile barcode data collectionHow RF Plus from Portable-Intelligence adds mobile barcode and RF transactions to Infor VISUAL, what data flows, setup steps, pitfalls and a private AI layer.
Guides
- AI-Powered Document Processing for ERP SystemsAutomate invoice, PO, and packing slip processing into ERP with AI document extraction. Covers OCR, layout analysis, validation rules, and ERP posting.
- Visual Manufacturing to CloudSuite Industrial MigrationMigrate from Infor Visual Manufacturing to CloudSuite Industrial. Understand architectural differences, data migration steps, and timeline expectations.
- Building an AI Document Processing Pipeline: OCR to ValidationHow to build an AI document processing pipeline: OCR quality, LLM extraction, schema validation, and the human review layer that catches what slips through.
Integrations
- How to add document OCR to Made2ManageCapture vendor invoices, packing slips, certs of conformance and drawings into Made2Manage with OCR, confidence thresholds and a human review step.
- How to add document OCR to MacolaCapture vendor invoices, packing slips and certs of conformance into Macola with OCR, confidence thresholds and human review, and a safe AP or receiving write path.