How to build an MCP server for Made2Manage
Short answer
An MCP server for Made2Manage is a small service that exposes a handful of read-only tools, such as order status, job lookup, open POs and stock by part, backed by parameterised SQL Server queries. Any MCP client, including Claude and ChatGPT-compatible tools, can then use them without knowing your schema.
The Model Context Protocol gives AI clients a standard way to call tools and read resources. For Made2Manage, which has no built-in MCP support, that means you write the server yourself or commission it. The payoff is that one well-built server serves every client and every future model.
The real work is not the protocol. It is deciding which questions deserve a tool, how each tool maps to your SQL Server schema, and how to keep permissions tight on a system that was designed long before AI.
This page is a design guide for that server: tool list, authentication, transport, permissions and audit.
What teams use it for
Order and job lookup tools
get_sales_order, get_job and job_operations return exactly what a CSR or planner would see, in compact JSON.
Inventory and availability
stock_by_part and available_to_promise answer 'do we have it' with on-hand, allocated and incoming quantities.
Purchasing visibility
open_po_by_part and po_status expose promise dates and receipts so buyers and agents can reason about lateness.
BOM and where-used
bom_explode and where_used help engineers and agents answer impact questions about a part change.
Resource for definitions
Publish a resource that explains your status codes and local terminology so models stop guessing.
Made2Manage integration surface
- SQL Server is the likely backing store for current installs; older FoxPro-based installs need a different data access path and probably an export or replication step.
- Use a read-only database user, preferably against a replica, with access limited to views you create for the server.
- Create SQL views that encode your business logic (what 'open' means, which statuses to exclude) so tools do not reimplement it.
- Check whether Aptean offers a supported API for your version; if so, a tool can wrap that instead of SQL for better rule enforcement.
- Part numbers, job numbers and sales order numbers have local formatting rules, such as padding. Normalise inputs in the tool.
How it works
- 1
List the top 15 questions
Interview planners, buyers and CSRs. Each repeated question becomes a tool candidate; one-offs do not.
- 2
Create database views
Build one view per tool with explicit columns, row limits and no sensitive fields. Grant the server account access to views only.
- 3
Pick an SDK and write the tools
Use an official MCP SDK in TypeScript or Python. Define typed inputs, short descriptions and consistent output shapes with units and as-of time.
- 4
Choose the transport
Use stdio for a local desktop client on one machine, and streamable HTTP for a shared server behind your gateway. Remote use needs real authentication.
- 5
Add authorisation
Map the caller to a role and filter tool lists by role. A buyer should not see cost rates or payroll-adjacent data.
- 6
Audit and test
Log each call, parameters and row counts. Use an MCP inspector and a regression list of questions with known answers.
Example flows
Availability question
Trigger: Client asks: can we ship 200 of part X by Friday?
- Model calls stock_by_part and receives on-hand and allocations.
- It calls open_po_by_part for incoming quantity.
- It answers with the numbers and states assumptions.
Result: A sourced answer rather than a guess.
Engineering change impact
Trigger: Engineer asks what is affected if a component changes.
- Call where_used for the component.
- Call open_jobs_by_part for each parent.
- Summarise jobs and open orders at risk.
Result: A quick impact list before the change is approved.
Keeping data on-prem
The server itself should run on your network, near the SQL Server replica, so no database port is ever exposed. Pair it with a local MCP-capable client and an open-weight model served by vLLM or Ollama, and the entire loop stays inside the building. For hosted clients such as Claude or ChatGPT, publish the server through an authenticated gateway or VPN rather than opening the ERP network. On older Windows servers, run the MCP service on a separate small VM so you never install runtimes on the machine hosting the ERP.
Security checklist
- Never expose raw SQL execution as a tool.
- Use a read-only account limited to purpose-built views.
- Require token or mTLS authentication for any remote transport, and rotate secrets.
- Filter tools and fields by caller role; log every invocation.
- Treat tool output as untrusted text when it reaches the model, since stored notes can contain injected instructions.
Ways to get it done
Build it yourself with an MCP SDK
Effort: 2 to 4 weeks for a solid read-only server.
In-house developer comfortable with SQL Server and TypeScript or Python.
Vendor-supported integration wrapped in MCP
Effort: Depends on API scope; often a few weeks.
Your Made2Manage version includes an official API that enforces business rules.
Partner build such as Netray
Effort: A short scoped project, then add tools as needs appear.
You want tested tools, roles and audit without learning MCP internals.
Pitfalls
- !Exposing dozens of overlapping tools; keep the list short and distinct.
- !Returning free-text notes that include prompt-injection text from outside parties.
- !Forgetting pagination and limits, leading to enormous responses.
- !Mismatched number formats or unit-of-measure confusion in outputs.
- !Running the MCP server on the ERP host itself, tying it to legacy OS constraints.
Frequently asked questions
What is an MCP server for an ERP?
It is a service that offers a standard set of tools and resources to AI clients. For Made2Manage, each tool wraps a vetted query, like open POs by part. Any MCP client can call them, so you build the integration once instead of per model.
Which tools should we build first?
Start with read-only lookups: sales order status, job status, stock by part, open POs and BOM explode. These cover most daily questions, carry little risk and let you validate accuracy before anyone discusses write access.
stdio or HTTP transport?
Use stdio when the client and server run on the same machine for one user. Use HTTP when several people or a hosted client need access, with proper authentication and TLS. Most shared deployments end up on HTTP behind a gateway.
Can the server write to Made2Manage?
It can, but we advise against it early. Writes should go through supported application paths so costing and inventory rules apply. A safer pattern is a tool that creates a request for approval rather than updating tables directly.
Does it work with both Claude and ChatGPT?
MCP is an open protocol and many clients support it, but client support and remote connection features differ and keep changing. Build to the standard, test with each client you plan to use, and expect small differences in setup.
Want MCP server working on your Made2Manage?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
Made2Manage AI Assistant Sizing and Value Calculator
Estimate GPU count, token volume, index size, hours saved and payback for a private on-prem AI assistant on Made2Manage.
Keep exploring
Free tools
- Made2Manage AI Assistant Sizing and Value CalculatorEstimate GPU count, token volume, index size, hours saved and payback for a private on-prem AI assistant on Made2Manage.
- Made2Manage Private AI Layer Blueprint GeneratorGenerate a shareable architecture plan for adding a private, on-prem AI assistant to Made2Manage, with components, security controls and a three-phase rollout.
- MCP Server Security ChecklistWork through authentication, authorization, input handling, prompt injection, secrets, logging and deployment before an MCP server touches ERP data.
AI on your ERP
- An MCP Server for SAP: Giving AI Agents Safe, Governed Access to ECC and S/4HANAHow to build an MCP server for SAP so AI agents read ECC and S/4HANA safely: OData and BAPI tools, per-user auth, read-only defaults, gated write tools.
- AI for Aptean Made2Manage: A Private Assistant on Top of Your M2M DataAdd AI to Aptean Made2Manage without a rip-and-replace: a private LLM grounded in your M2M SQL Server data for order, shop floor, and MRP questions.
Integrations
- How to build an MCP server for Infor SyteLineHow to build a Model Context Protocol server for Infor SyteLine: which read-only tools to expose, IDO and SQL access, auth, transports, and audit for any MCP client.
- How to build an MCP server for Infor LNHow to build a Model Context Protocol server for Infor LN: which read-only tools to expose, auth through ION API, stdio versus HTTP, permission scoping and audit.