Mobile inventory / barcodeSAP Business ByDesign

ByDintec and SAP Business ByDesign: handheld warehouse transactions with continuous scanning

The Mobile Warehouse Scanner App ByDintec from Dintec LLC is a handheld extension for SAP Business ByDesign, built with SAP Build per the SAP partner listing. It supports continuous-scan warehouse transactions, serial numbers and label creation, aimed at ByDesign users who want faster receiving and movement capture.

How Mobile Warehouse Scanner App ByDintec connects to SAP Business ByDesign

Handheld extension built with SAP Build (SAP partner listing)

The listing describes a handheld extension created with SAP Build. Details of the services it calls are not in the listing, so confirm them with Dintec during evaluation.

ByDesign communication arrangement and user

Like other external apps, expect to configure a communication system, user and arrangement, and give the user only the authorizations the scanning transactions need.

What data moves

FromToDataWhen
ByDesignByDintecProducts, serial numbers and open warehouse documentsUser starts a transaction
ByDintecByDesignGoods receipts and goods issues from continuous scansScan session completed
ByDintecByDesignSerial number captures against productsSerial scanned during a transaction
ByDintecByDesignLabel creation requests and internal movementsUser prints a label or posts a movement

Setting it up

  1. 1Review the listing and trialRequest a demo or trial from Dintec and confirm supported transaction types and devices.
  2. 2Create the ByDesign integration setupCreate the communication system, user and arrangements, then test connectivity from a device.
  3. 3Check master dataEnsure products, serial number profiles and storage locations are defined and barcodes match product IDs.
  4. 4Configure label creationSet up label formats and printers, and test that printed labels scan back correctly.
  5. 5Deploy to devicesInstall on the handhelds in scope and set up named users.
  6. 6Pilot and verify stockRun a limited pilot and compare ByDesign stock and serial history to physical reality.

What usually breaks

  • !Continuous scanning of the wrong item or quantity can post many lines quickly, so review before submit.
  • !Products without serial profiles configured in ByDesign cannot accept captured serial numbers properly.
  • !Label formats that do not scan on your printers or label stock waste time at the dock.
  • !Shared device logins make audit trails useless.
  • !Dependence on SAP Build artifacts means upgrades should be confirmed with the vendor after ByDesign releases.
  • !Unclear support boundaries between SAP, the partner and your reseller slow incident resolution.

A private AI layer across both systems

Serial number anomaly review

An assistant looks for duplicate, missing or out-of-sequence serial numbers across receipts and issues and proposes corrections for approval.

Scan session audit

Summarize large continuous-scan sessions against the expected document quantities and highlight deviations before posting.

Stock questions in plain language

Ask where a serial-numbered unit was last moved or which documents touched a product, with read-only queries and the query shown.

When something else fits better

  • SnAPscan or WMS Cloud are alternative ByDesign scanning apps with different device and offline trade-offs.
  • ByDesign's own screens can be enough for low transaction volumes.
  • A dedicated WMS may be warranted for directed putaway and wave picking beyond scan-and-post.

Frequently asked questions

What does ByDintec cover?

The listing mentions continuous-scan warehouse transactions, serial numbers and label creation for ByDesign, delivered as a handheld extension built with SAP Build. Ask Dintec for the exact list of supported documents and devices.

Does it need an integration layer?

It is described as an extension rather than a middleware product, but it still needs a ByDesign user and communication setup. The listing is brief, so verify details such as offline support before committing.

Can we keep AI and data on-premises?

ByDesign is a cloud ERP, so the ERP itself is not on-prem. A private AI layer can run on your own infrastructure, read ByDesign through its APIs and keep model inference inside your network.

Pairing documented at www.sap.com/taiwan/products/erp/partners/dintec-llc-mobile-warehouse-scanner-app . Mobile Warehouse Scanner App ByDintec is a product of Dintec LLC; Netray is independent and not affiliated with either vendor.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Runs with your ERP

AI on your ERP

Integrations

Software