Bearing Grease Quantity and Annual Cost Calculator
Over-greasing and under-greasing are both common causes of early bearing failure. This calculator gives a starting grease quantity from bearing size, then scales it to a yearly consumption and cost so you can build a lubrication plan.
Your numbers
Check the gun with a scale. Many deliver 1 to 2 g per stroke.
Your results
The rule is a generic starting point. Follow the bearing and grease supplier's guidance, and note that over-greasing raises temperature and can damage seals.
Annual grease cost vs relubrication interval
Sweeps Relubrication interval from 250 to 8000, holding your other inputs fixed.
Lubrication route from ERP data
Optional: turn your equipment list into lubrication work orders.
Optional. The tool and every export work without this. No spam.
How to use it
Read the outer diameter and width from the bearing designation or datasheet. Enter your relubrication interval, annual run hours and the number of similar bearings. Check your grease gun output by weighing ten strokes, and enter the grams per stroke. The result shows grams per shot, strokes per bearing, yearly kilograms and cost. The chart shows how cost reacts if you extend or shorten the interval.
The rule and its limits
A widely used relubrication quantity is G = 0.005 x D x B, with G in grams and D and B in millimetres. The interval depends on speed, temperature, bearing type, grease and contamination, and is best taken from the supplier's chart or from condition monitoring. If ultrasonic or vibration readings stay healthy, the interval can sometimes be extended. If they rise after greasing, the interval or the quantity is probably wrong.
- Shorter intervals raise cost but lower the risk of dry running
- High temperature roughly halves grease life for every 15 degrees C rise
- Do not mix incompatible thickeners
Common mistakes
Using the same shot for every bearing regardless of size is the most common error. Others include skipping a gun calibration, greasing a stationary bearing, and ignoring the drain or relief path so excess grease is forced into the winding of an electric motor. Record every greasing event against the equipment record so intervals can be reviewed against failures.
- Not calibrating the grease gun
- Greasing with the relief plug still in place
- Using one interval for dirty, hot and clean locations alike
Frequently Asked Questions
How much grease should I add to a bearing?
A common starting estimate is 0.005 x outer diameter x width in grams, using millimetres. Always confirm against the bearing or motor manufacturer's nameplate or manual, which takes precedence.
How do I find the relubrication interval?
Use the grease or bearing supplier's interval chart, which accounts for speed factor, bearing type and temperature, then adjust using condition monitoring and inspection history.
What happens if I over-grease?
Excess grease raises churning temperature, can blow out seals and, on motors, push grease into windings. Add slowly with the machine running where the manufacturer allows it.
Does one stroke equal one gram?
Not necessarily. Output varies by gun type and grease stiffness. Weigh ten strokes on a scale and divide to get the real value for your gun.
Netray can generate lubrication routes and work orders from your ERP equipment list so each point gets the correct quantity and interval.
Related Tools
Bearing L10 Life Calculator (ISO 281)
Basic and adjusted rating life of ball and roller bearings from C, P and rpm, with a load sweep chart.
Maintenance & ReliabilityVibration Velocity, Acceleration and Displacement Converter
Convert a single-frequency vibration reading between velocity, acceleration and displacement, with a frequency sweep chart.
Maintenance & ReliabilityMotor Winding Insulation Life vs Temperature Calculator
Thermal margin and expected insulation life of a motor from class, ambient, rise and hot spot allowance, with an ambient sweep.
Maintenance & ReliabilityCondition Monitoring Alarm Limit Worksheet (Statistical Baseline)
Editable worksheet that sets alert (mean + 2 sigma) and alarm (mean + 3 sigma) limits per asset and measurement.
More Maintenance & Reliability tools
See all- Preventive Maintenance Schedule Template
- Maintenance Work Order Template
- Inherent vs Operational Availability Calculator (MTBF, MTTR)
- Spare Parts Criticality Scoring Worksheet
- Maintenance Backlog Calculator (Weeks of Work and Crew Size)
- PM Compliance and Schedule Compliance Calculator
- Reliability Centered Maintenance (RCM) Worksheet
- Maintenance Cost per Unit Produced Calculator
- Optimal PM Interval Calculator (Weibull Cost Model)
Keep exploring
Free tools
- Bearing Grease Quantity CalculatorEstimate regrease quantity per bearing, grease gun shots, and annual grease use, cartridges and cost for any number of bearings.
- Bearing L10 Life CalculatorCompute L10 life in million revolutions and hours for ball or roller bearings, apply a reliability factor, and see how life falls as load rises.
- Ultrasonic Bearing Readings Log WorksheetAn editable route log for ultrasound readings. Enter baseline and current dB, get rise over baseline per row and record the lubrication or inspection action.