On-Prem AIFree calculatorPDF, Excel, Word exportCustom MES (SQL Server)Manufacturing

Custom MES on SQL Server AI Assistant Sizing and Value Calculator

This calculator sizes a private AI assistant over Custom MES on SQL Server and estimates the value it returns. Change the inputs to see how many GPUs you need, how large the retrieval index is and when the project pays back.

Your numbers

users
35 %

Share of named users who ask at least one question on a working day.

questions
tokens

Include retrieved context in the prompt. Retrieval-heavy questions are often 1,500 to 6,000 tokens.

x

Busiest hour as a multiple of the average working hour. Shift starts and handovers raise it.

tokens/s

Aggregate generation plus prompt throughput under batching. Measure your model on your GPU; this default is a planning assumption only.

documents

Records, work orders, procedures or files, counted as documents.

pages
minutes
$/hour
$/month

Amortised hardware, power and support per GPU, or private cloud rental.

$

Your results

GPUs needed (no redundancy)
1
Add one GPU if you need redundancy.
Simple payback
1.2 months
Zero means no payback at these inputs.
Daily active users
88
Questions per day
438
Tokens per day
612,500
Peak questions per hour
164
Assumes an 8-hour working day.
Peak concurrent requests
1
Little's law with a 20-second average request time.
Peak tokens per second
64
Index chunks
207,000
600 tokens per page, 400-token chunks, 15% overlap.
Index size
1.449
About 7 KB per chunk for vector, text and metadata.
Hours saved per month
919 hrs
Assumes 21 working days.
Monthly value
$50,531
Monthly GPU cost
$900
Net monthly value
$49,631

Planning estimate only. Throughput per GPU depends on model, quantisation, context length and serving stack, so benchmark your own setup. Time saved is a user-reported assumption, not a measured result.

Free, optional. Reopen it on any device.
Save results:

Monthly value and GPU cost vs named users

Sweeps Named users from 20 to 1500, holding your other inputs fixed.

Check these numbers on your data

Optional: a short sizing review using your own user counts and document volumes.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Start with named users and the share who use the assistant on a typical day. Set questions per active user from a pilot or a survey; three to six a day is a common planning range for a plant tool. Prompt plus answer tokens should include retrieved context, which dominates cost. Then set your measured throughput per GPU. The chart shows how value and GPU cost scale with the number of named users.

  • Use pilot data for questions per day
  • Include retrieved context in token counts
  • Benchmark tokens per second on your own GPU
  • Treat minutes saved as an assumption to verify

Formulas and assumptions

Questions per day = users x daily active share x questions per user. Peak questions per hour = questions per day divided by 8, times the peak multiplier. Peak concurrency uses Little's law with a 20-second request time. GPUs = ceiling of peak tokens per second divided by tokens per second per GPU, minimum one. Index chunks = documents x pages x 600 tokens x 1.15 overlap divided by 400. Hours saved = questions per day x 21 days x minutes saved divided by 60. Payback = one-time cost divided by net monthly value.

System notes for Custom MES on SQL Server

The ai schema is the contract: only reviewed views are visible, columns that hold sensitive data are left out or masked, and every query runs with the end user's identity in the session context so row-level security applies. Write actions go only through the MES service layer with human approval, never through direct updates.

Common mistakes

Sizing errors are usually in tokens and in value, not in arithmetic.

  • Counting only the question and answer, and forgetting retrieved context
  • Using vendor peak throughput instead of measured throughput under real batching
  • Assuming every named user is active every day
  • Counting all minutes saved as cash savings

Frequently Asked Questions

What default throughput per GPU should I use?

The default of 1,500 tokens per second is a planning assumption for a mid-sized open-weight model with batching. Real figures vary a lot with model size, quantisation and context length, so measure your own setup with vLLM or Ollama before buying hardware.

Why is peak concurrency calculated from a 20-second request?

Little's law says concurrent requests equal arrival rate times time in system. Retrieval plus generation often takes 10 to 30 seconds for a grounded answer, so 20 seconds is a reasonable default. Change the expression if your measured time differs.

How reliable is the hours-saved figure?

It is only as good as the minutes-saved input. Measure it in a pilot by timing how long the same question takes without the assistant. Treat early numbers as a range, and do not count the saved minutes as cash unless the work is actually reduced.

Does the index size include the model?

No. Index size covers vectors, chunk text and metadata for the documents you list. Model weights are separate and range from a few GB to tens of GB depending on model size and quantisation.

If you would like these numbers checked against a pilot on your own Custom MES on SQL Server data, Netray can run the sizing and a read-only proof of value on your hardware.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Comparisons

Software