On-Prem AIFree calculatorPDF, Excel, Word exportMicrosoft Dynamics GPAll Microsoft Dynamics GP tools

Dynamics GP AI Assistant Sizing and Value Calculator

Small and mid-size GP sites rarely need large GPU clusters. This calculator shows what a private AI assistant needs for your user count and question volume, and what time saved is worth against the cost.

Your numbers

users
40 %
questions
tokens
documents
pages
min
per hour
per GPU
tokens/s

Lower default for a 24 GB class card running a mid-size quantised model. Measure yours.

one-time

Your results

GPUs needed (before redundancy)
1
Monthly net value after GPU cost
$13,284
Daily active users
24
Questions per day
168
Tokens per day
420,000
Peak concurrent requests
0.1867
Assumes 20% of questions in the busiest hour and 20 seconds per request.
Retrieval index size
0.983
Hours saved per month
370 hrs
Monthly value of time saved
$14,784
Simple payback
2.6 months

Estimate for planning. Measure real throughput, include redundancy and confirm time savings with a pilot before committing budget.

Free, optional. Reopen it on any device.
Save results:

Peak concurrent requests vs named users

Sweeps Named GP users from 10 to 500, holding your other inputs fixed.

Get a sizing review for your GP estate

Optional: share your inputs and we will check GPU count, index design and rollout assumptions.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter named GP users and the portion who will use the assistant daily; finance teams often have higher usage than the rest. Count questions per user based on current requests for reports and lookups. Set tokens per question higher if you plan to summarise documents. Use a measured throughput from your own GPU.

  • Finance users usually ask more
  • Keep minutes saved conservative
  • Compare one and two GPU scenarios
  • Include the build cost for payback

The formulas

Questions per day equal active users times questions each. Peak concurrency equals 20% of daily questions divided by 3600 and multiplied by 20 seconds of processing per request, an application of Little's law. GPUs equal peak tokens per second divided by GPU throughput, rounded up. Monthly value equals hours saved times hourly cost with 22 working days.

Reading the result

At GP scale the GPU count is often one, and concurrency is a handful of requests. That means latency and quality matter more than raw capacity. If value is marginal, test whether SmartList, SSRS or Power BI already covers the highest volume questions before building anything.

Frequently Asked Questions

Why show peak concurrency?

It tells you how many requests overlap at the busiest moment, which drives latency. Even small teams can see a handful of overlapping requests.

Is a 24 GB GPU enough?

For a small team and a quantised mid-size model, often yes. Quality needs and context length decide, so run your own test questions.

What does the chart show?

Peak concurrent requests as named users grow, with other inputs fixed. Use it to see when you might need a second GPU.

Does it include power and cooling?

Only if you include them in the GPU monthly cost. Enter an all-in amortised figure for a fair comparison.

If you want a second pair of eyes on these numbers for your GP estate, Netray can review the inputs with your IT team.

Get Microsoft Dynamics GP alerts

Support and maintenance deadlines, release changes that affect Microsoft Dynamics GP sites, and new free Microsoft Dynamics GP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Microsoft Dynamics GP: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Microsoft Dynamics GP? Start with the Microsoft Dynamics GP guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations