LLM Token Cost Calculator for ERP Chat
API pricing looks tiny per token and surprising per month. This calculator turns user counts and prompt size into a monthly bill so you can compare a hosted model against running one on your own GPUs.
Your numbers
Share of named users who ask at least one question on a working day
System prompt + chat history + retrieved ERP rows or document chunks + the question
Your results
Prices change often and differ by model, caching and batch discounts. Enter the current list price from your provider. This estimate excludes embedding costs, vector database hosting, engineering time and any enterprise minimums.
Monthly API cost vs named users
Sweeps Named users with chat access from 50 to 3000, holding your other inputs fixed.
Compare API cost with running it on-prem
Share your usage numbers and we will return a side by side estimate for a hosted model versus open-weight models on your own GPUs.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the number of people who will have access, the share who use it daily and the questions each one asks. The most important input is input tokens per question. An ERP assistant does not send only the question: it sends a system prompt, recent chat turns and retrieved rows or document chunks. Four to eight thousand input tokens per question is common for grounded answers. Output is usually much shorter than input, but costs more per token.
The formula
Cost per month = questions x input tokens / 1,000,000 x input price, plus questions x output tokens / 1,000,000 x output price. Questions equal named users x daily active share x questions per user x working days. Prompt caching and batch discounts can reduce input cost, but only if your prompt prefix is stable and the provider supports it. Model the list price first, then treat any discount as upside.
- Retrieved context is usually the biggest cost driver
- Long chat history multiplies input tokens on every turn
- Agents that call several tools per question can use five to ten times the tokens of a single answer
Reading the result
The default scenario of 300 users produces a modest monthly bill, which is why many pilots look cheap. The chart shows how cost scales with headcount: it is linear, so cost at 3,000 users is ten times the cost at 300. Compare the annual figure with a self-hosted option in the TCO calculator. Hosted APIs usually win at low volume and lose when volume is high and constant, or when data cannot leave your network.
Common mistakes
The usual error is estimating tokens from the visible question and answer only, which underestimates input by a factor of ten. Another is forgetting that agent loops and retries consume tokens. A third is ignoring growth: usage tends to double after a good launch. Add a 30 to 50 percent buffer for the first year, and measure real token counts from your pilot logs before committing a budget.
Frequently Asked Questions
How many tokens is a typical ERP question?
A short question is 20 to 60 tokens, but the full request including instructions, history and retrieved data is usually 3,000 to 8,000 input tokens. Check your provider's usage logs from a pilot for real numbers.
Does a cheaper model change the answer?
Yes, a lot. Smaller models can cost a fraction per token, and for lookup-style ERP questions they are often adequate. Test accuracy on your own questions before choosing on price alone.
Are embeddings included?
No. Embedding your documents is a one-time and incremental cost that is much smaller than chat usage for most companies, but the vector store and re-indexing still need budget.
What about taxes and currency?
Provider invoices may add VAT, GST or withholding, and billing is usually in US dollars. Add those on top of the calculated figure for your finance team.
If you want to see what the same workload costs on your own GPUs, we can size it with you and run the assistant against your ERP read-only.
Related Tools
ChatGPT vs On-Prem LLM TCO Calculator
Compare yearly cost of a hosted LLM API with a self-hosted GPU server for the same workload and find the break-even volume.
On-Prem AIOn-Prem GPU Sizing Calculator for ERP AI
Work out how much GPU memory and how many cards you need to serve an open-weight model to your ERP users on-prem.
On-Prem AILLM Token Cost Calculator
Turn request volume, prompt length, and per-million token pricing into a defensible monthly and annual LLM budget, including the effect of prompt caching.
On-Prem AILLM API vs Self-Hosted Cost Calculator
Model your API bill from requests and token mix, compare it against an all-in self-hosted monthly cost, and see monthly and annual savings.
More AI Agents & Automation tools
See all- Business Process Automation ROI Calculator
- AI Agent Use Case Prioritizer
- Document Processing Automation Savings Calculator
- AP Invoice Automation ROI Calculator
- Order Entry Automation Savings Calculator
- Quote-to-Cash Cycle Time Calculator
- Manufacturing AI Readiness Assessment
- RPA vs AI Agent Selector
- ERP AI Maturity Assessment
Keep exploring
Free tools
- LLM Token Cost CalculatorTurn request volume, prompt length, and per-million token pricing into a defensible monthly and annual LLM budget, including the effect of prompt caching.
- LLM Response Cache Token Savings CalculatorSee how much a result cache and prompt prefix caching cut your monthly LLM API bill when many ERP questions repeat.
- MCP Tool Definition Context Token Overhead CalculatorSizes the context window and input cost eaten by MCP tool schemas before the user says a word, and shows the what-if as you add tools.
ERP fixes and how-tos
- Private AI Layer for Infor VISUAL On-Prem: Reference ArchitectureReference architecture to add a private AI assistant to Infor VISUAL on-prem: data access paths, retrieval, permissions, sizing and rollout, no cloud needed.
- Epicor Eclipse AI Integration: A Private, On-Prem ArchitectureHow to add a private AI assistant to Epicor Eclipse: data access options, scheduled extracts, local indexing, open-weight models, roles and limits.
- Private AI Layer for Baan On-Prem: Reference ArchitectureReference architecture to add a private AI assistant to Baan on-prem: data access paths, retrieval, permissions, sizing and rollout, no cloud needed.
Guides
- The LLM Inference Cost Optimization PlaybookCut LLM inference costs with a practical playbook: quantization, batching, GPU right-sizing, caching, and the on-prem vs API breakeven math for 2026.
- Natural Language Query Over ERP Data: What Actually WorksNatural language query over ERP data: how text-to-SQL, semantic layers, and RAG let SyteLine and Infor LN users ask questions and get trustworthy answers.
- Chatting with SyteLine Data: What Separates Working Systems from DemosWhat it takes to reliably chat with an Infor SyteLine database: schema grounding, query validation, semantic definitions, and evidence. Why generic chatbots fail and governed layers work.
Integrations
- How to add an AI chatbot to SYSPROAdd an AI chatbot to SYSPRO for staff and customers: grounded in e.NET and SQL data, role-aware answers, portal embedding, and fully on-prem with open models.
- How to add an AI chatbot to ERPNextHow to add an AI chatbot to ERPNext or its customer portal: grounded in live ERP data, permission aware, with an option to run fully on-prem.
Troubleshooting
- Why your cost per token is too high, and the biggest levers to fix itHigh cost per token almost always traces back to low GPU utilization, the wrong model size, or no quantization or caching. Here is how to find the biggest lever.
- Why time to first token is high on your LLM endpoint, and how to fix itHigh TTFT usually comes from long prefill prompts, no prefix caching, cold starts, or queueing delay. Here is how to diagnose and fix each one.