On-Prem AIFree assessmentPDF, Excel, Word export

RAG Accuracy Readiness Assessment: Will Your System Actually Be Accurate?

This free RAG accuracy readiness assessment scores your retrieval-augmented generation system across the eight dimensions that actually predict production accuracy: chunking validation, evaluation set quality, retrieval measurement, reranking, groundedness, index freshness, entitlement-aware retrieval, and the production feedback loop. It is built for AI engineers and platform leads who need an honest read on whether a RAG system is ready for real users before it ships. Most RAG accuracy problems are diagnosable and fixable, but only if the system is instrumented well enough to reveal which of these eight layers actually broke.

0 of 8 answered0%

1. Has your chunking strategy been tested against real questions, or set once and left alone?

Chunk size and boundaries are the single most common cause of poor RAG recall.

2. Do you have a labeled evaluation set with known correct source passages for each question?

3. Do you measure recall at k for your retrieval layer specifically, separate from final answer quality?

Most RAG failures are retrieval failures. Measuring only the final answer hides where the system actually broke.

4. Does your pipeline include a reranking step after initial retrieval?

5. Do you measure groundedness, meaning whether the generated answer is actually supported by the retrieved passages?

6. How current is your indexed content relative to the source documents?

7. Does retrieval respect the same access permissions as the source documents?

A common and serious failure mode: the assistant surfaces content a user could not see in the source system.

8. Is there a working feedback loop from production failures back into your evaluation set?

Was this tool useful?

Why RAG accuracy fails silently

Unlike a crashing application, a RAG system with poor accuracy keeps running and keeps producing fluent, confident-sounding answers, which is exactly what makes it dangerous. The failure hides inside one of a small number of layers: the wrong chunks were retrieved, the right chunks were retrieved but ranked too low to reach the model, the model was given the right context but generated an unsupported answer anyway, or the index was simply stale. Without measuring each layer separately, teams cannot tell which one is broken, and they end up tuning the wrong component while the real problem persists.

The two failure modes that matter most

Retrieval failures and groundedness failures behave very differently and need separate detection. A retrieval failure means the correct source document never made it into the context the model saw, which no amount of prompt engineering can fix because the information genuinely was not available. A groundedness failure means the correct information was retrieved but the model generated an answer not actually supported by it, which is a hallucination masquerading as a cited fact. Measuring recall at k catches the first; measuring groundedness against retrieved passages catches the second. Most teams only check the second, informally, and miss the first entirely.

  • Recall at k answers: did we retrieve the right document at all?
  • Groundedness answers: did the generated answer actually rely on what we retrieved?
  • A system can have perfect recall and still hallucinate if groundedness is not enforced or checked.
  • A system can have perfect groundedness and still be wrong if recall failed and the model answered from parametric memory instead.

Entitlement-aware retrieval is the most overlooked risk

Security and accuracy converge at one specific point: if retrieval is not filtered by the requesting user's actual permissions, the assistant will happily surface restricted engineering drawings, supplier pricing, or personnel data to anyone who asks the right question, regardless of how well the rest of the pipeline performs. This is not a hypothetical edge case; it is the default behavior of a naively indexed corpus, and it is the single finding most likely to stop a production launch in a regulated industry once security review catches it.

How Netray builds and validates accurate RAG systems

Netray builds retrieval systems for manufacturers where wrong answers have real operational consequences: misread specifications, incorrect part substitutions, or outdated procedures presented as current. We instrument all eight dimensions in this assessment before calling a system production-ready, build entitlement-aware retrieval that mirrors your ERP and PLM permissions, and set up a production feedback loop so real failures continuously strengthen the evaluation set. Engagements typically start with an accuracy audit of an existing pilot or a from-scratch evaluation harness for a new build.

Frequently Asked Questions

What is the difference between a retrieval failure and a groundedness failure?

A retrieval failure means the system never fetched the document that actually contains the answer, so the model was working blind regardless of how it was prompted. A groundedness failure means the correct document was fetched and made available, but the model generated a response that goes beyond, or contradicts, what that document actually says. They require different fixes: retrieval failures point to chunking or reranking, groundedness failures point to prompting, generation constraints, or citation verification.

How many questions should be in a RAG evaluation set?

Start with at least 50 questions written or reviewed by subject matter experts, covering common queries, edge cases, and out-of-scope questions the system should decline to answer. Mature production systems typically maintain 100-300 questions, continuously expanded from real production failures. Fewer than 50 makes it hard to detect regressions reliably, since a handful of questions can pass or fail somewhat randomly between pipeline changes.

Why does index freshness matter for accuracy, not just relevance?

A stale index does not just miss new content, it actively serves outdated content as if it were current, which is arguably worse than missing it entirely because the answer looks complete and authoritative. A revised safety procedure, updated part specification, or superseded policy that has not been reindexed will be confidently presented to users as the current version. For any content type that changes on a predictable schedule, index freshness should match that schedule, not lag behind it by choice.

Is entitlement-aware retrieval really necessary if the corpus is mostly internal documentation?

Yes, because 'mostly internal' documentation still typically includes supplier pricing, unreleased product specifications, personnel-adjacent records, and export-controlled technical data mixed in with general reference material. If retrieval treats the corpus as a single flat permission space, any user who can query the assistant can effectively read anything in the index, which is a materially different, and usually worse, permission model than the source systems that content came from.

Get a full accuracy audit of your RAG pipeline with a prioritized plan to close the gaps that matter most.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Troubleshooting

Comparisons