Supplier Total Cost of Ownership Comparison Calculator
The cheapest quote on the RFQ is rarely the cheapest part by the time it is on your shelf and through your line. This tool compares two suppliers on landed price plus the expected cost of rejects, and tells you the reject rate that flips the decision.
Your numbers
Incumbent or domestic quote.
Challenger or offshore quote.
Inbound freight, duty, brokerage and tooling amortization as a percent of price.
Material, handling, sorting, line disruption and replacement freight per reject.
Your results
Planning model. Add inventory carrying cost for longer lead times and currency risk separately if they are material to your decision.
Annual TCO vs Supplier B reject rate
Sweeps Supplier B expected reject rate from 0 to 10, holding your other inputs fixed.
Link TCO to live ERP data
Optional: an expert review of how to feed landed cost, receipts and rejects from your ERP into sourcing decisions.
Optional. The tool and every export work without this. No spam.
How to use it
Enter annual volume and the two unit prices. Express freight, duty, brokerage and tooling amortization as a percent of price for each supplier, using actual quotes from your forwarder or customs broker. Enter an expected reject rate for each, using history for the incumbent and a prudent assumption or first-article data for the challenger. The cost per rejected unit should include everything a reject triggers, not just the lost part.
- Use landed prices, not ex-works prices
- Use a conservative reject rate for a new supplier
- Include replacement air freight in cost per reject
- Run the chart before trusting a single point estimate
The formula
Landed unit price equals quoted price times one plus the adder percentage. Annual TCO equals volume times landed price plus volume times reject rate times the full cost per reject. The break-even reject rate for Supplier B is the rate at which its TCO equals Supplier A's: A's TCO minus B's landed purchase spend, divided by volume times cost per reject. It is a quick way to see how much quality slippage a price advantage can absorb.
Reading the default case
In the default example, Supplier B quotes about 12 percent lower, but duty and freight narrow the gap, and a 2.5 percent reject rate at $22 per reject takes much of what remains. The chart shows the two TCO lines crossing at the break-even reject rate. If you believe the challenger can hold a rate below that point and you can enforce it with a quality agreement, the move pays. If not, the quote is a false saving.
Common mistakes
Do not ignore working capital: a longer sea freight lead time means more inventory and safety stock, which this model leaves out on purpose so the comparison stays transparent. Do not use the reject rate from a sample build for a production forecast. Finally, keep the same volume and specification for both suppliers, or the comparison is not like for like. Document the assumptions with the sourcing decision.
Frequently Asked Questions
What is total cost of ownership in purchasing?
It is the full cost of acquiring and using a part: purchase price, freight, duty, quality failures, inventory, and support. Piece price is only one component, and often not the largest when the supplier is far away or less capable.
Where do I get the reject rate for a new supplier?
Use first-article and pilot lot results, the supplier's process capability data, and references. Then add a safety margin. A new supplier usually performs worse in the first year, so a conservative assumption is more honest.
Can the break-even be negative?
Yes. If Supplier B's landed price already exceeds Supplier A's total cost, no reject rate makes B cheaper and the result shows zero or a negative number. Treat that as a signal that A wins on cost under these inputs.
Does this include currency risk?
No. If you buy in a foreign currency, run the calculator at your expected rate and again at a stressed rate, then compare the two results. A hedging cost can also be added to the adder percentage.
Netray can connect this comparison to your ERP purchase history and receiving data so the inputs update from real transactions rather than estimates.
Related Tools
Supplier Cost of Poor Quality Calculator
Turns a supplier's reject rate into an annual cost of poor quality, including handling, expedites and line-down time, with a what-if chart.
Supply Chain & InventoryVolume Discount Break-Even Order Quantity Calculator
Compares the annual cost at your normal EOQ with the cost of ordering at the supplier's price break quantity, so you know if the discount really pays.
Costing & FinanceSupplier Payment Terms Extension Cash Benefit Calculator
Shows the working capital released by moving a supplier from net 30 to net 60 or beyond, the value to you and the financing cost it pushes onto the supplier.
Costing & FinanceSupplier Price Increase Margin Impact Calculator
Quantifies the margin hit from a supplier price increase and the customer price rise needed to hold your gross margin percentage.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Supplier Total Cost of Ownership Comparison WorksheetCompare suppliers on landed, quality and inventory carrying cost per unit to find the lowest total cost, not just the lowest price.
- Supplier Total Cost of Ownership CalculatorAdd freight, duty, poor quality, inventory carrying and ordering cost to the quoted price to see what a supplier really costs per unit and per year.
- Supplier RFQ Quote Comparison WorksheetCompare supplier quotes on landed cost: unit price, freight, duty, MOQ and lead time per supplier, with extended cost and price spread calculated.
Guides
- ERP Total Cost of Ownership CalculationCalculate the true total cost of ERP ownership including hidden costs. Compare cloud vs on-premise TCO with a 10-year analysis framework and benchmarks.
- SyteLine Cloud vs On-Premise: Complete ComparisonCompare SyteLine cloud and on-premise deployments. Total cost of ownership, performance, security, customization flexibility, and migration considerations.