ERP OperationsFree referencePDF, Excel, Word export

Unit of Measure Conversion Reference for ERP

Wrong unit of measure conversions quietly corrupt purchasing, inventory value and costing. This reference lists common conversion factors, flags which are exact by definition, and explains how to hold them in an ERP item master without rounding errors.

Download:
FromToMultiply byDimensionNote
in
mm
25.4
Length
Exact by definition
ft
m
0.3048
Length
Exact by definition
yd
m
0.9144
Length
Exact by definition
mile
km
1.609344
Length
Exact by definition
mil (thou)
mm
0.0254
Length
1 mil = 0.001 in
ft
in
12
Length
Exact
m
mm
1000
Length
Exact
cm
mm
10
Length
Exact
lb
kg
0.45359237
Mass
Exact by definition (avoirdupois)
oz
g
28.349523125
Mass
Avoirdupois ounce, exact
lb
oz
16
Mass
Exact
kg
g
1000
Mass
Exact
metric ton (t)
kg
1000
Mass
Exact
short ton (US)
kg
907.18474
Mass
2,000 lb
long ton (UK)
kg
1016.0469088
Mass
2,240 lb
troy oz
g
31.1034768
Mass
Precious metals
L
mL
1000
Volume
Exact
m3
L
1000
Volume
Exact
gal (US)
L
3.785411784
Volume
Exact by definition
gal (imperial)
L
4.54609
Volume
Exact by definition
qt (US)
L
0.946352946
Volume
1/4 US gallon
gal (US)
qt (US)
4
Volume
Exact
fl oz (US)
mL
29.5735295625
Volume
1/128 US gallon
ft3
L
28.316846592
Volume
Exact from ft definition
barrel (oil)
L
158.987294928
Volume
42 US gallons
in2
mm2
645.16
Area
Exact
ft2
m2
0.09290304
Area
Exact
yd2
m2
0.83612736
Area
Exact
m2
ft2
10.7639104167
Area
Inverse of 0.09290304
bar
kPa
100
Pressure
Exact
psi
kPa
6.894757293
Pressure
Approximate to 9 digits
MPa
kPa
1000
Pressure
Exact
h
min
60
Time
Exact
min
s
60
Time
Exact
day
h
24
Time
Exact
dozen (DZ)
each (EA)
12
Count
Exact
gross (GR)
each (EA)
144
Count
12 dozen
gross (GR)
dozen (DZ)
12
Count
Exact
pair (PR)
each (EA)
2
Count
Exact
ream
sheet
500
Count
Common paper definition

Multiply the quantity in the From unit by the factor to get the To unit. To go the other way, divide. Conversion factors in your ERP should keep enough decimals; rounding a factor like 0.45359237 to 0.454 causes visible drift on large quantities. Pack sizes (case, pallet, reel) are item specific and are not listed here.

Have thousands of items with questionable UoMs?

Optional: we can scan an item export and flag implausible conversion factors.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search by unit name or dimension, then multiply the quantity in the From unit by the factor to get the To unit. Divide to go the opposite direction. Use the table when you set up base and alternate UoMs on an item, when you check a supplier price unit against your stock unit, or when you review conversion records during a data migration. Export to Excel or CSV for use in a load template.

Exact versus approximate factors

Many factors are exact since the inch, pound and gallon are defined in terms of metric units: 1 inch is exactly 25.4 mm, and 1 pound is exactly 0.45359237 kg. Others, such as psi to kPa, are derived and rounded. Keep as many digits as the ERP field allows. If a system limits decimals, prefer a numerator and denominator pair, if supported, over a rounded single factor.

  • Exact: in, ft, yd, mile, lb, US gallon
  • Derived: psi to kPa, barrel to liter
  • Count units: dozen and gross are exact
  • Pack sizes are item specific, never generic

UoM setup in an ERP

Most ERPs keep one base unit per item and alternate units with a conversion factor. Choose the base unit as the smallest unit you track in stock, so quantities stay whole where possible. Purchase and sales units then convert into it. SAP material master holds alternative units of measure with a numerator and denominator, and many other systems store a single decimal factor. Check how yours treats rounding on receipt and invoice, since small differences multiply across thousands of transactions.

Common mistakes

Mixing US and imperial gallons or short and long tons is the classic error and it is silent. Entering the factor in the wrong direction multiplies instead of dividing. Rounding factors to three decimals causes cost and quantity drift. Allowing free-text units creates duplicates like EA, EACH and PC. Changing the base unit of an item with stock or open orders is dangerous and should be done only through the ERP's supported process, if at all.

Frequently Asked Questions

What base unit of measure should I choose for an item?

Use the smallest unit you need to track in stock so that quantities stay whole where practical, for example each or gram. Larger purchase and sales units then convert into it. Avoid changing it later once stock and transactions exist.

Are US and imperial gallons the same?

No. A US gallon is exactly 3.785411784 liters and an imperial gallon is exactly 4.54609 liters, about 20 percent larger. Confirm which one a supplier uses before setting a conversion.

How many decimals should a conversion factor have?

Keep as many as your ERP allows, at least six for derived factors. Exact factors such as 25.4 or 0.45359237 should be stored in full. Where possible use a numerator and denominator to avoid rounding altogether.

Does this table include pack sizes like case or pallet?

No. Case, box, reel and pallet quantities depend on the item and the supplier, so they must be entered per item from the packaging specification, not from a generic table.

If you are cleaning UoM data across thousands of items, we can help build a read-only scan that flags inconsistent or implausible conversions in your ERP.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides