Wire Harness Build and Inspection Checklist (IPC/WHMA-A-620)
IPC/WHMA-A-620 sets acceptance requirements for cable and wire harness assemblies. This checklist turns the common topics of the standard into a form that an assembler or inspector can fill during a build, then export for the traveler file.
0 of 32 items complete
13 critical items still open - these are the highest-risk gaps.
Materials and preparation
Crimping and terminals
Soldering, shielding and termination
Routing, lacing and marking
Test and release
Mark every item. Any unchecked critical item should stop release until corrected or dispositioned. This checklist follows topics covered by IPC/WHMA-A-620 and is not a copy of the standard, so use the current standard and your drawing for acceptance criteria.
Keep inspection records searchable
Optional: a short look at how inspection results could be analyzed alongside ERP data.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Print or fill the checklist for each harness or each lot, depending on your work instruction. Go through the groups in order: materials, crimps, soldering, routing, test. Mark critical items first, since they stop release when missed. Export to PDF or Excel and attach it to the build record with the serial number. If your customer specifies a class (1, 2 or 3), record it at the top and apply the matching criteria from the standard to every visual check.
What the standard covers
A-620 is an acceptance standard rather than a design guide. It describes target, acceptable and defect conditions for items such as crimped terminations, soldered terminations, wire preparation, insulation, wire dress, marking, and shielding. Class 3 is for high-reliability products, including most defense and aerospace work. The checklist reflects those topics, but the drawing and customer specification may add stricter limits or other test steps.
- Class 1: general electronic products
- Class 2: dedicated service electronic products
- Class 3: high-performance, harsh environment products
- Customer drawing overrides general guidance
Common mistakes
Typical problems are crimping with the wrong tool die for the wire gauge, skipping pull tests at changeover, placing a contact in the wrong cavity, and forgetting to record lot codes for traceability. Another common issue is accepting a harness on continuity alone, missing intermittent faults that show up under flex. Keep inspector stamps controlled, train to the current revision and record rework so repeated defects trigger corrective action.
Frequently Asked Questions
Is this checklist a substitute for IPC/WHMA-A-620?
No. It lists the topics to check. Acceptance criteria, photos and class-specific limits are in the standard, which you need to license and train to. Use this as a build aid alongside your drawing and the current standard.
Which class should I build to?
Use the class in your purchase order or drawing. Defense and aerospace work is commonly Class 3. If no class is stated, ask the customer, and do not assume. The class changes what counts as an acceptable condition.
How often should crimp height be checked?
Follow your work instruction and the tooling maker. Many shops check at setup, after tool change and at set intervals during a run. The checklist asks you to confirm that your defined frequency was followed.
Can I add my own items?
Yes. After exporting to Excel you can add rows for customer-specific tests, special marking or serialization rules. Keep a controlled revision of the checklist so builds can be traced to the version used.
Netray can help turn checklist results into searchable quality data in your ERP. Ask us if you want build records analyzed privately on your own hardware.
Related Tools
Electronic Component Lot Traceability SQL Generator
Fill in your table and column names to get forward trace, backward trace and quarantine-scope SQL for a component lot or date code.
Electronics ManufacturingConformal Coating Types Reference (IPC-CC-830)
A comparison table of conformal coating families (acrylic, epoxy, silicone, urethane, parylene) with typical traits and rework notes.
Aerospace & DefenseMIL-STD-810H Test Methods Reference Table
Look up every MIL-STD-810H environmental test method number, title and the stress it covers, then export the list for your test plan.
Engineering & PLMPCB Trace Width and Current Capacity Calculator (IPC-2221)
Enter current, allowed temperature rise and copper weight to get the minimum external or internal trace width from the IPC-2221 formula.
More Electronics Manufacturing tools
See all- Moisture Sensitive Device Floor Life Log Worksheet
- Electronics Lot and Date Code Traceability Log Worksheet
- Reflow Oven Profile and Solder Paste Log Worksheet
- Solder Paste Stencil Aperture Area Ratio Calculator
- Electronic Component Junction Temperature Derating Calculator
- MSL Floor Life and Exposure Time Remaining Calculator
- Solder Paste Stencil Area Ratio Calculator
- PCB Assembly Cost Estimator
- SMT Line Capacity Calculator
Keep exploring
Free tools
- Cable and Wire Harness Build Inspection Record TemplateA fill-in inspection record for cable and wire harness builds: crimp pull checks, continuity, insulation test, labeling and final visual.
- IPC/WHMA-A-620 Class 1, 2 or 3 Selection AssessmentA scored questionnaire on end use, failure consequences, environment and service life that indicates which workmanship class a harness most likely needs.
- Wire Harness RFQ Review ChecklistCheck the drawing package, BOM, class, test, material, compliance and commercial points on a harness RFQ before you commit to a price.
Guides
- How to Quote a Wire Harness From a Customer DrawingStep-by-step wire harness quoting: read the drawing, build the BOM, price wire and connectors, time every termination, and add NRE, test and scrap.
- IPC/WHMA-A-620 Requirements in a Wire Harness QuoteHow IPC/WHMA-A-620 Class 1, 2 and 3 affect harness cost: training, inspection, crimp validation, rework limits and what to state on the quote.
- ERP for Cable Assembly and Wire Harness Manufacturers: What to RequireWhat a cable assembly or wire harness shop needs from ERP: BOM by drawing revision, wire by the foot, lot traceability, kitting, and test records.
Manufacturing hubs
- IPC and its standards: what electronics manufacturers need to know, and the ERP and data work behind themIPC standards explained for electronics manufacturers: IPC-A-610, J-STD-001, IPC-6012 and IPC/WHMA-A-620, plus the ERP, traceability and private AI issues EMS shops face.
- WHMA and wire harness manufacturing: the A-620 standard, harness BOMs and the ERP problems that followWHMA and wire harness manufacturing: IPC/WHMA-A-620, crimp and cable assembly requirements, and the ERP, BOM and private AI issues harness shops face.