Supply Chain & InventoryFree referencePDF, Excel, Word export

X12 855 Acknowledgment Status Codes Reference (BAK02 and ACK01)

When an 855 lands in your inbox or leaves your system, two fields drive what customer service does next: BAK02 at header level and ACK01 on every line. This table decodes them in plain language.

Download:
ElementCodeMeaningCustomer service action
BAK02
AC
Acknowledge, with detail and change
Review each changed line before confirming to the customer
BAK02
AD
Acknowledge, with detail, no change
Order accepted as placed; no outreach needed
BAK02
AE
Acknowledge, with exception detail only
Only exception lines are listed; check each against the PO
BAK02
AK
Acknowledge, no detail or change
Header-level acceptance; line dates not confirmed
BAK02
RD
Reject, with detail
Contact the customer with the line-level reasons
BAK02
RF
Reject, with exceptions only
Resolve the listed exceptions, then request a resend
BAK02
RJ
Rejected, no detail
Call the customer; the reason is not in the message
BAK02
ZZ
Mutually defined
Check the partner implementation guide
ACK01
IA
Item accepted
None; promised date stands
ACK01
IB
Item backordered
Confirm the new ship date in ACK05 and notify the customer
ACK01
IC
Item accepted, changes made
Compare date, quantity and price to the PO
ACK01
ID
Item deleted
Verify the customer agreed to remove the line
ACK01
IE
Item accepted, price pending
Set an owner and a date to finalize the price
ACK01
IH
Item on hold
Find the hold reason (credit, engineering, material) and update the buyer
ACK01
IP
Item accepted, price changed
Price differs from the PO; expect a buyer query
ACK01
IQ
Item accepted, quantity changed
Confirm partial quantity and the balance plan
ACK01
IR
Item rejected
Explain why and offer an alternative
ACK01
IS
Item accepted, substitution made
Get customer approval for the substituted part
ACK04
068
Date qualifier: current schedule ship date
This is the date you commit to ship
ACK04
069
Date qualifier: promised for delivery
Date the goods reach the customer

Codes are from the X12 code lists. Not every partner accepts every code, and some use ZZ or private codes, so the partner's implementation guide always wins.

Map ERP statuses to EDI codes

Optional: a short review of how your order statuses map to 855 codes.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Type a code or a keyword such as 'backorder' in the search box. Each row shows the element, the code, what it means and the action a customer service rep normally takes. Export the table to Excel or PDF for a desk reference or training handout for new order desk staff.

Header versus line codes

BAK02 describes the acknowledgment as a whole: accepted unchanged, accepted with changes, exceptions only or rejected. ACK01 then qualifies each PO1 line. A header of AD with any line other than IA is inconsistent, and many buyer systems will flag it. Align the header to the worst line status you send.

Using the codes to reduce status calls

Most 'where is my order' contacts start from a line that was not IA. Route IB, IH, IQ and IP lines to a worklist the same day the 855 is sent, and make sure the promised date in ACK05 is one you can keep. A late 855 or an overly optimistic date does more harm than a rejected line with a clear reason.

Limits of the list

The X12 standard defines more codes than shown here, and trading partners restrict which ones they accept. This list covers the codes seen most often in manufacturing and distribution order flows. Always check the partner guide before mapping codes from your ERP statuses.

Frequently Asked Questions

What does IA mean in an EDI 855?

IA in ACK01 means Item Accepted. The seller will supply the line as ordered, with the quantity and date shown. It is the clean, no-exception status that most buyer systems auto-accept.

What is the difference between AC and AD?

AD acknowledges with line detail and no change from the PO. AC acknowledges with line detail where something changed, such as a date, quantity or price. Use AC whenever any line is not IA.

Where is the promised ship date in an 855?

It is normally in ACK04 and ACK05 as a qualifier and date, for example 068 for the current schedule ship date. Some partners want it in a DTM segment instead, so follow their guide.

Is a 997 the same as an 855?

No. A 997 only confirms that an X12 message was received and passed syntax checks. An 855 is the business-level acknowledgment of a purchase order.

If you want these codes mapped from your ERP order and line statuses automatically, we can help. The reference works on its own.