Upgrading Navision for better inventory management
Upgrading Dynamics NAV (Navision) to Business Central improves inventory management mainly through a supported platform, current warehouse and planning features, mobile and Power BI access, and a clean break from old C/AL modifications that slow posting and cost adjustment. The gains are real only if the upgrade also fixes item setup, costing and reordering data; moving bad parameters to a new version just runs them faster.
When this makes sense
- NAV 2009 to NAV 2018 sites where Adjust Cost - Item Entries runs for hours and inventory value never quite matches the general ledger.
- Distributors and manufacturers that still plan purchases in spreadsheets because nobody trusts the reordering policies in NAV.
- Warehouses using paper pick lists or a bolt-on scanner app that breaks every time NAV is touched.
- Companies whose NAV version is out of support and whose auditors or insurers now ask about it.
- Businesses adding a second warehouse, lot or serial tracking, or e-commerce stock sync that the current setup cannot handle.
What the engagement covers
Inventory modification inventory
List every C/AL change touching Item, Item Ledger Entry (table 32), Value Entry (5802), Reservation Entry and warehouse tables, and decide per change: drop because standard Business Central now covers it, rebuild as an AL extension, or replace with an AppSource app.
Costing review before data moves
Check costing methods per item, unapplied and open negative entries, expected cost posting, Average Cost Period and Automatic Cost Adjustment settings. Reconcile with the Inventory to G/L Reconcile report so the upgraded database starts balanced.
Planning and replenishment setup
Reset reordering policies (Fixed Reorder Qty., Maximum Qty., Order, Lot-for-Lot), safety stock, lead time calculation, dampener and time bucket per item or stockkeeping unit, then prove them in the planning and requisition worksheets.
Warehouse configuration
Choose the right location setup for each site: basic receipt and shipment, inventory put-away and pick, or full directed put-away and pick with bins, zones, bin rankings and warehouse worksheets. Many NAV sites run a level that no longer fits their volume.
Item tracking and variants
Set item tracking codes for lot, serial or package tracking, expiration dates and warehouse tracking; rationalize item variants and units of measure carried over from years of NAV use.
Upgrade path and data migration
Pick the route: technical upgrade through Business Central 14 (the last C/AL release) and on to current AL versions, or a fresh Business Central with open balances and history migrated. Older NAV databases may need an intermediate step first.
Inventory reporting and mobile
Replace custom NAV inventory reports with standard reports, report extensions, Power BI inventory reports and the Business Central mobile app for counts and lookups.
How it runs
- 1
Assessment (2-4 weeks)
- Analyze C/AL objects and inventory customizations
- Run costing and item ledger health checks
- Review warehouse process and item setup with users
- Choose upgrade route, SaaS or on-premises
- 2
Design and cleanup (3-6 weeks)
- Clean item master, units of measure and variants
- Fix open applications and run full cost adjustment
- Design warehouse level, bins and replenishment parameters
- Define which customizations become AL extensions
- 3
Build and upgrade (6-14 weeks)
- Convert or rebuild extensions in AL
- Run test upgrades of a copy of production
- Configure planning, warehouse and tracking setup
- 4
Test and cutover (3-6 weeks)
- Reconcile inventory quantity and value against NAV
- Run planning worksheet and pick tests with real orders
- Physical count or cycle count to start clean
- Cutover weekend and hypercare
What you get
- Inventory customization register with keep, rebuild or drop decisions
- Costing health report with fixes applied before upgrade
- Replenishment parameter set per item or stockkeeping unit
- Warehouse design: location settings, bins, zones and process flows
- Upgraded or migrated Business Central environment with reconciled inventory value
- Test scripts for receiving, put-away, picking, counting and planning
- Power BI or standard inventory reports replacing legacy custom reports
What drives cost and effort
| NAV version and code base | Older versions with heavy C/AL modifications need more conversion and may need an intermediate upgrade step; NAV 2017 or 2018 with light changes is far simpler. |
| Costing data quality | Years of unadjusted entries, wrong costing methods or open negative inventory add cleanup weeks before any upgrade can reconcile. |
| Warehouse complexity | Moving to directed put-away and pick with bins and scanners adds design, setup and training well beyond a basic location. |
| Scanner and WMS add-ons | Third-party scanning or warehouse apps need a compatible Business Central version and retesting. |
| Data volume and history | Large item ledger and value entry tables lengthen test upgrades and cost adjustment runs; deciding how much history to bring matters. |
| Number of locations | Each warehouse needs its own setup, testing and count at cutover. |
Fixed-fee assessment then fixed-scope upgrade
Companies that want a firm number for the upgrade after the code and data are understood.
Time and materials with a cap
Sites with uncertain costing cleanup or many customizations, where scope will be clearer after the first test upgrade.
Phased upgrade then improvement retainer
Teams that want a like-for-like technical upgrade first and inventory process improvements in monthly increments after go-live.
Questions to ask any Microsoft Dynamics NAV consultant
Will you fix our costing data before the upgrade or after?
Unreconciled item ledger and value entries carry straight into Business Central; fixing them first is cheaper and avoids a messy opening balance.
Which of our inventory customizations does standard Business Central now cover?
A good partner removes modifications instead of rewriting them all, which lowers upgrade cost and future update effort.
How many test upgrades will you run on a copy of production?
Test upgrades expose data errors and runtime problems; one test run is rarely enough for a large NAV database.
How will you prove replenishment parameters before go-live?
Bad reordering settings in a new system destroy user trust quickly; running the planning worksheet against real demand catches them.
What happens to our scanner or WMS add-on?
Add-ons need a supported version and may change licensing or process; confirm early.
SaaS or on-premises, and why for us?
Business Central online changes how custom code, file handling and updates work; the choice should follow your integrations and IT constraints.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Inventory value differs from the general ledger after upgrade.
Run full cost adjustment and the Inventory to G/L Reconcile report before and after each test upgrade, and sign off differences.
Old modifications are rebuilt one-for-one and slow everything again.
Challenge every customization against standard features before writing AL.
Warehouse users fall back to paper after go-live.
Train on real picks in a test environment and staff the floor during the first weeks.
Planning suggestions flood buyers with noise.
Tune dampener, time bucket and order multiples, and roll planning out by item group.
Cutover counts disagree with migrated quantities.
Count or cycle count just before cutover and post adjustments in NAV first.
If your NAV is on a recent version, inventory runs fine and the real problem is reorder points or a messy item master, fix the data and parameters in NAV first; that alone often delivers most of the benefit. Upgrade when support, security, integrations or warehouse needs force it, not as a cure for setup problems that will follow you.
Frequently asked questions
Can we upgrade NAV directly to the latest Business Central?
Usually not in one jump. C/AL code must become AL extensions, and the data upgrade typically passes through Business Central 14 or another supported step depending on your NAV version. Some companies choose a fresh implementation and migrate balances instead.
Will Business Central fix slow cost adjustment?
Partly. A modern platform helps, but slow cost adjustment usually comes from data: huge numbers of unadjusted entries, average cost items with long histories or open applications. Cleaning those is part of the upgrade work.
Do we need directed put-away and pick?
Only if bins, zones and system-directed movements pay off for your volume. Many smaller warehouses work well with inventory put-away and pick, which is simpler to run.
Can AI help with an inventory-focused upgrade?
Yes, mostly in analysis: scanning C/AL objects for inventory customizations, profiling item ledger data and checking migrated quantities line by line. Netray uses agents for these checks so consultants spend time on design decisions.
How long does a NAV inventory upgrade take?
For a single site with moderate customization, a few months end to end is common. Multi-site warehouses, scanner apps and heavy costing cleanup extend that.