Microsoft DynamicsFree referencePDF, Excel, Word exportMicrosoft Dynamics 365 Business CentralAll Microsoft Dynamics NAV and Business Central on-prem tools

Business Central Item Costing Method, Replenishment and Reordering Policy Reference

The item card in Business Central holds a handful of fields that control how stock is valued and how planning behaves. This reference explains each option in plain terms so a consultant, planner or controller can pick the right value during setup.

Download:
Item card fieldOptionWhat it doesTypically fits
Costing Method
FIFO
Outbound cost is taken from the oldest inbound entry still on hand
Perishables, items with price drift, simple audit trail
Costing Method
LIFO
Outbound cost is taken from the newest inbound entry
Rare, only where local rules allow it
Costing Method
Specific
Cost follows the exact lot or serial number sold
High value serialized goods, requires item tracking on every transaction
Costing Method
Average
Unit cost is recalculated as a moving average per period or day
Commodity materials with frequent receipts
Costing Method
Standard
Items are valued at a fixed standard cost, differences go to variance accounts
Manufactured items where variance reporting is wanted
Item Type
Inventory
Tracks quantity and value in item ledger and value entries
Stocked goods and manufactured items
Item Type
Service
No inventory tracking, used on sales and purchase lines
Labor, freight, installation
Item Type
Non-Inventory
No quantity tracking, but can be bought and sold with a cost
Consumables expensed on receipt
Replenishment System
Purchase
Planning suggests purchase orders for the item
Bought components and trading goods
Replenishment System
Prod. Order
Planning suggests production orders using the production BOM and routing
Manufactured items
Replenishment System
Assembly
Planning suggests assembly orders using the assembly BOM
Simple kits and light assembly
Replenishment System
Transfer
Planning suggests transfer orders from another location through stockkeeping units
Multi-location distribution
Reordering Policy
Fixed Reorder Qty.
When projected stock falls to the reorder point, order the fixed reorder quantity
Stable demand, items with set pack sizes
Reordering Policy
Maximum Qty.
When projected stock falls to the reorder point, order up to the maximum inventory
Replenish-to-level items, min-max stock
Reordering Policy
Order
Create a supply order for each demand line, linked one to one
Make-to-order and project items
Reordering Policy
Lot-for-Lot
Supply is planned to cover demand inside the time bucket, with optional safety stock
Most MRP driven manufactured items
Reordering Policy
(blank)
Item is not planned by the planning worksheet or requisition worksheet reordering logic
Items handled manually
Manufacturing Policy
Make-to-Stock
Production orders are planned from forecast and stock levels
Repetitive or catalog products
Manufacturing Policy
Make-to-Order
Production orders are created for each demand, with lower level components also made to order
Configured and engineered products
Order Tracking Policy
None
No order tracking links are created
Low value items
Order Tracking Policy
Tracking Only
Links between supply and demand are shown, no action messages
Reference visibility
Order Tracking Policy
Tracking & Action Msgs.
Links are shown and the system proposes changes to existing orders
Items managed by MRP
Reserve
Optional
Users can reserve manually on demand lines
General use
Reserve
Always
The system reserves automatically where stock exists
Scarce stock with a firm allocation rule

Options are listed as they appear on the item card and stockkeeping unit card in current Business Central versions. Costing method changes on items with entries are restricted, so decide the method before go-live.

Planning parameter review

Optionally ask for a read-only review of reorder points and lead times from your ERP history.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the reference

Filter by the item card field name you are configuring, for example Reordering Policy, and read each option with its typical fit. Combine this with your item categories: purchased raw materials may use Lot-for-Lot and Purchase, while engineered products use Order and Make-to-Order. Export the list and add a column for the choice you make per item category, then use it as the basis of your item template configuration.

Costing method decisions

Costing method controls how the cost of goods sold is determined. Standard costing needs a maintained standard cost and a periodic roll-up, but gives variance visibility. Average costing is the simplest for purchased materials. FIFO is intuitive for finance but requires cost adjustment to flow properly. Specific costing requires item tracking on every inbound and outbound line, so use it only where the business really tracks cost per serial or lot.

  • Pick a default per item category and put it in an item template
  • Run the Adjust Cost - Item Entries batch job on a regular schedule
  • Test a purchase, consumption and sale before changing method on live items

Planning options and how they interact

Reordering Policy only matters when the replenishment system is set. A manufactured item with Prod. Order replenishment and Lot-for-Lot policy gets production proposals in the planning worksheet. Add a production BOM and routing, otherwise the planning run cannot explode components. Order Tracking Policy decides whether you see action messages. Safety stock and lot accumulation period shape the quantities that are suggested.

Common mistakes

Leaving Reordering Policy blank on items you expect to be planned is the most frequent mistake, as is choosing Maximum Qty. without a maximum inventory value. Another is setting Make-to-Order for items that actually have a stock buffer. Finally, changing costing method after posting creates confusion in the value entry history, so settle it early.

Frequently Asked Questions

Which costing method is best in Business Central?

There is no single best one. Standard fits manufacturers who want variance analysis, Average suits commodity materials, FIFO suits many distributors, and Specific is for tracked, high value items. Match the method to how finance wants to see cost and how the item is received.

What is the difference between Maximum Qty. and Fixed Reorder Qty.?

Fixed Reorder Qty. orders the same quantity each time the reorder point is hit. Maximum Qty. orders whatever brings the projected stock up to the maximum inventory level, so the order size varies with how far stock has fallen.

Does Lot-for-Lot create orders per demand line?

No, that is the Order policy. Lot-for-Lot plans supply to cover net demand within a time bucket, optionally grouped by the lot accumulation period, so several demand lines can share one supply order.

Can I change the costing method on an item with entries?

Business Central restricts it because existing value entries were created under the old method. Plan the change as a controlled process with finance, ideally with a new item or a documented cutover, not as a casual edit.

If you want item setup reviewed against your actual consumption and lead times, we can analyze your ERP data on-premises and suggest planning parameters for a planner to approve.

Get Microsoft Dynamics NAV and Business Central on-prem alerts

Support and maintenance deadlines, release changes that affect Microsoft Dynamics NAV and Business Central on-prem sites, and new free Microsoft Dynamics NAV and Business Central on-prem tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Microsoft Dynamics NAV and Business Central on-prem: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Microsoft Dynamics NAV and Business Central on-prem? Start with the Microsoft Dynamics NAV and Business Central on-prem guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Comparisons

Software