DELMIA Ortems + private AI
AI for DELMIA Ortems: Explaining Plans and Reconciling with the ERP
Short answer
AI for DELMIA Ortems adds a private assistant beside the planning and scheduling tool, so planners can ask why an order is late, which resource or material drove it, and how the plan compares with ERP records. It reads through governed, read-only connectors and does not replace the scheduling engine or release process.
- ERP
- DELMIA Ortems
- Industries
- Manufacturing, Aerospace, Food and Beverage, Process Manufacturing
- Written for
- Production Planner
DELMIA Ortems is Dassault Systemes' planning and scheduling product for finite-capacity scheduling in discrete and process plants. It sits between the ERP and the shop floor, taking orders, routings, stock and calendars from the ERP and producing a sequenced plan that respects capacity, materials and other constraints. Some sites use it alongside other DELMIA or 3DEXPERIENCE components, others run it as a standalone planning layer.
As with any APS, the difficulty lies in explaining and trusting the result. Planners must justify a date to a customer, explain a change to a plant manager, and notice when the plan and the ERP disagree. Doing this means reading Ortems resource definitions, constraint settings and the ERP data feeding it, often across several screens and exports.
Ortems provides its own visualization and reporting, which many plants use effectively. A private AI layer is worth considering when questions cross systems, when documentation of the model is thin, and when order and customer data cannot go to a public AI service, which is common in aerospace and defense supply chains.
The sections below describe how AI connects to an Ortems estate, what it does well, and where the product already suffices. The assistant explains and proposes; the planner remains the decision-maker and Ortems remains the scheduler.
What usually gets in the way
The problems we hear most from production planner teams running DELMIA Ortems.
Explaining plan changes
After each recalculation, planners must tell sales and production what moved and why, usually by assembling evidence from several views.
ERP and plan divergence
Order changes in the ERP between synchronizations leave the plan out of step, and spotting every difference by hand is slow.
Thin model documentation
Resource groups, constraints and rules were configured during the project, and the reasoning is rarely written down.
Material and capacity interplay
A delay may come from a late component, a limited resource or both. Separating them takes cross-checking schedule and purchasing data.
Restricted data
Aerospace and defense customers often restrict where order and program data may be processed.
Where AI earns its place in DELMIA Ortems
Each use case names the ERP objects it reads or writes, so your ERP team can judge the integration effort before anyone commits budget.
Late order root cause
For each late order, state in plain language whether capacity, material, calendar or priority drove the delay, with supporting figures.
Touches: Orders, Operations, Resources, Calendars, ERP stock and purchase orders
Outcome: Gives customer-facing teams a clear reason and a more reliable date.
Plan to ERP reconciliation
Compare ERP production orders with those loaded in the planning tool and list differences in quantity, dates or routing.
Touches: ERP production orders, routings, planning orders, interface tables
Outcome: Finds interface problems earlier and keeps plan and ERP aligned.
Recalculation change summary
After a recalculation, summarize the largest changes in start dates, sequence and resource load against the prior plan.
Touches: Plan versions, Operations, Resources
Outcome: Replaces manual comparison before the daily planning meeting with a reviewable summary.
Model documentation
Read resource, constraint and rule definitions and produce a searchable description of how the plant is modeled.
Touches: Resource definitions, constraints, calendars, rules
Outcome: Reduces dependency on a single expert and supports reviews and upgrades.
Capacity scenario summaries
Describe how added shifts, outages or priority changes alter late orders and loads across plan copies.
Touches: Calendars, Resources, plan scenarios
Outcome: Supports faster, better-evidenced capacity decisions.
Shortage-driven prioritization
List planned orders blocked by missing materials with linked purchase orders and promise dates.
Touches: BoM, stock, purchase orders, planned operations
Outcome: Aligns buyers with the items that gate the plan.
Floor Q&A
Supervisors ask what is next on a resource and what it depends on, answered from the plan and ERP status.
Touches: Dispatch lists, work centers, ERP order status
Outcome: Reduces routine interruptions to planners.
Reference architecture
The assistant reads plan data and ERP data through governed, read-only connectors. It explains and drafts; DELMIA Ortems does the scheduling and releases remain a planner action.
- 1
Ortems and ERP connectors
Reads planning data through Ortems database or export interfaces and ERP data through APIs or SQL views using scoped read-only accounts.
- 2
Semantic layer
Maps orders, operations, resources and constraints, including site-specific attributes, to planner terminology.
- 3
Model serving
Open-weight models served with vLLM or Ollama on customer hardware or a private cloud.
- 4
Retrieval and agents
Retrieval over live data and model documentation; proposals are drafts for planners to apply.
- 5
Governance and audit
Per-user logging of questions, queries and answers, held inside your environment.
Integration notes for your ERP team
- Ortems exchanges orders, items and stock with the ERP through interface tables, files or middleware; use the same staging data as the source for the assistant.
- Use read-only database roles for plan data; the assistant must not be able to recalculate or release plans.
- If Ortems is part of a wider DELMIA or 3DEXPERIENCE deployment, confirm which data actually lives in Ortems and which in other components.
- Index calendars and resource groupings, since many questions concern capacity assumptions.
- ERP reads use documented APIs or read replicas, keeping role rules in force.
- Where an MES or shop-floor system provides confirmations, read them to compare plan with actuals.
- Test against your Ortems release and re-test at upgrade.
Deployment options
Air-gapped on-prem
Aerospace and defense suppliers with strict data rules.
All components run on site with no outbound path.
Private or sovereign cloud
Sites with planning and ERP workloads in their own cloud tenant.
Deployed in the same region and network boundary as the source systems.
Hybrid
Groups with several plants and different ERPs.
Central governance, local connectors, data stays in place.
Compliance and data control
How the architecture supports your obligations. Certification and accountability stay with your organisation; the design keeps the evidence straightforward.
ITAR / EAR data handling
Keeping model and data in infrastructure you control lets you apply your own access rules to controlled program data.
AS9100 planning records
Logged and reproducible explanations support control of planning information in audits.
Customer flow-down and NDA terms
Order and program data is not sent to public AI services.
GDPR and regional privacy
Personal data stays within infrastructure and region you control.
Where Netray fits
ERPray
Grounded questions and dashboards over ERP orders, stock and purchasing alongside plan snapshots.
DataRay
Suited when plan exports, model documents and ERP data must be queried together on-prem.
Custom build
Recalculation summaries and reconciliation agents depend on your model and are usually bespoke.
How an engagement runs
Phase 1 . 2-4 weeks
Discovery
- -Inventory of Ortems release, interfaces and data stores
- -Prioritized planner questions
- -Security review
- -Deployment recommendation
Phase 2 . 6-8 weeks
Pilot
- -Read-only connectors on non-production data
- -Late-order and reconciliation use cases live
- -Accuracy review with planners
- -Logging validated
Phase 3 . 4-6 weeks
Production
- -Production cutover with scoped accounts
- -Runbook for new questions
- -Planner training
- -Audit review process
Phase 4 . Ongoing
Scale
- -More plants and ERPs
- -Draft-action workflows
- -Model refresh
- -Quarterly accuracy review
Questions to ask any vendor, including us
A short list that separates real DELMIA Ortems AI work from a chatbot demo.
- Does the assistant ever recalculate or release a plan?
- Which Ortems interfaces and data stores does it read?
- How are our constraints and calendars represented in answers?
- Where does the model run and what leaves our network?
- How is accuracy checked against planner investigations?
- How does it reconcile with our ERP, and with what accounts?
- What is the upgrade plan for Ortems and the ERP?
- What do we keep if we end the engagement?
Frequently asked questions
Does AI replace DELMIA Ortems?
No. Ortems remains the planning and scheduling engine. The AI layer explains results, reconciles plan and ERP data, and drafts proposals. Planners still decide, recalculate and release plans through the normal process.
Do we need AI if Ortems already reports well?
Perhaps not. Built-in views cover many needs. The AI layer helps with explanatory and cross-system questions, such as why an order is late given ERP stock, and with documenting the model.
Can it work with other DELMIA products?
Possibly, depending on which components hold the data and what interfaces they expose. Discovery maps the actual landscape first and confirms what can be read safely.
How does it connect to the ERP?
Through documented APIs, SQL views or a read replica with a scoped read-only account, so the ERP's roles still apply.
Is our data protected for defense work?
Model and data run on infrastructure you control, so program data is not sent to a public AI service. Your own compliance obligations remain yours, and the design helps you meet them.
Can it suggest schedule changes?
It can draft proposals, such as moving a priority, for a planner to evaluate. Applying a change and releasing a plan stay with the planner in Ortems.
How long does a pilot take?
Typically two to four weeks of discovery and six to eight weeks of pilot, longer with several plants or complex interfaces.
Related guides
AI Demand Forecasting for Manufacturers: Better Numbers and an Explanation Planners Can Trust
AI demand forecasting explains ERP forecast changes in plain language, flags exceptions for planners, and handles short-history SKUs without Excel overrides.
AS9100D + on-prem AIAI for AS9100 Quality Management on Your ERP
AI on top of your ERP quality module for AS9100D suppliers: NCR/CAPA drafting, FAI support, counterfeit parts screening, with a full audit trail.
Souverainete numerique + AI on ERPAI for ERP in France: Souverainete and SecNumCloud-Aligned Architecture
On-prem and sovereign AI for SAP, Infor LN, and Sage X3 in French manufacturing: SecNumCloud-aligned architecture, CNIL-compliant, data stays in France.
Shop floor + on-prem AIAI shop floor assistant for operators working inside your ERP
An on-prem AI copilot answers operator questions against your ERP work instructions, travelers, and routings in plain language, at the machine, without a screen full of menus.
RAG + SQL + permissionsA Private LLM Grounded on Your ERP Data
How a private LLM answers questions on your ERP data: RAG plus text-to-SQL, role-based permissions inherited from the ERP, and where each fits.
Ask your ERP anythingNatural Language Query for ERP Data: Ask SAP, Infor, or Oracle a Question in Plain English
See how natural language query over SAP, Infor, Oracle, and NetSuite data works: grounded text-to-SQL, role-based permissions, and a visible audit trail.
Plan it with numbers
Production Scheduling Maturity Assessment
Score your scheduling practice across method, capacity logic, adherence, and shop floor feedback - and see the staged path to finite-capacity scheduling.
Free ToolMRP Nervousness Assessment
A 10-question diagnostic that scores how badly your MRP plan churns between runs - and pinpoints which levers will stabilize it.
Free ToolERP AI Maturity Assessment
Benchmark how deeply AI and automation are embedded in your ERP operations, from data foundations to autonomous agents, across four maturity levels.
GuideAI-Optimized Production Scheduling for Manufacturing
Optimize production scheduling with AI. Reduce changeover time 30%, improve on-time delivery 20%, and maximize throughput using constraint-based optimization algorithms.
GuideAI-Powered Demand Forecasting for Manufacturing
Improve manufacturing demand forecasts by 30-50% with AI. Combine ERP history, external signals, and ensemble ML models for accurate production planning.
GuideSyteLine Capacity Requirements Planning (CRP) Guide
Configure SyteLine Capacity Requirements Planning with work center capacity, routing-based load calculation, and bottleneck analysis for production scheduling.
Talk it through with an engineer who knows DELMIA Ortems
Bring one real question your team cannot answer from the ERP today. We will map the data path, the model, and where it runs, and tell you honestly if AI is the wrong tool for it.