Costpoint: Project Cost Exceeds Funding or Ceiling
Costpoint project cost exceeds funding ceiling billing
Also searched as
- Costpoint funding limit exceeded invoice
- Costpoint project ceiling cost overrun billing hold
- how to set funding and ceiling on Costpoint project
- Costpoint billing limit revenue limit project
Short answer
Costpoint tracks funding, cost ceilings and billing or revenue limits separately, and a project can be over any one of them while being fine on the others. When costs exceed funding, billing and revenue are limited to what the limits allow, so the first step is to identify which limit is binding and whether a contract modification should raise it.
Applies to: Deltek Costpoint 7.x and cloud, Project Setup and Billing for cost-type and time-and-materials contracts. Field names and screens vary by release and configuration.
How to work an overrun
- 1Pull the contract and the latest modification. Write down the contract value, funded amount, cost ceiling and any fee or limitation-of-cost clauses, since these are different numbers.
- 2In Project Setup, open the project and compare the funding and limit values to the contract. A mismatch usually means a modification was not entered.
- 3Run a project status or cost-to-funding report to see incurred cost, billed amounts and remaining funding by project and level.
- 4Identify which limit is binding: funded amount, the contract ceiling, a labor-category or ODC sub-limit, or a billing limit. Billing holds and revenue caps follow the specific limit.
- 5If a modification added funding, enter it through your normal process with the effective date and reference, then reprocess billing for the affected period.
- 6If no modification exists, notify the program manager and contracts team at once. Limitation of cost clauses typically require advance notice to the government before the funded amount is reached.
- 7Do not move cost to another project or remove it to clear the hold. Resolve it through funding or an approved correction.
Funding, ceiling and limit are three different things
Contract value is what the contract could pay if fully exercised. Funded amount is what the government has actually obligated, and on incrementally funded cost contracts it is usually less than the value. The ceiling is the maximum cost the contractor may incur and be reimbursed. A project can be below its ceiling and still out of funding.
Costpoint holds these as separate settings so billing and revenue can respect each. When a user says the invoice is stuck, ask which limit; the answer changes the fix. Out of funding means get a modification. Over a sub-limit means a contract change or reallocation, if the contract allows it.
What happens to billing and revenue
When a project is configured to enforce limits, the billing and revenue processes cap amounts at the limit. The excess stays as unbilled cost, so the work is not lost, but it is not invoiced. That shows up as growing unbilled receivables on the balance sheet and is a cash flow issue as well as a compliance one.
Watch how the cap interacts with fee. On a cost-plus-fee contract, fee is often calculated on allowable cost up to the limit, so an overrun can silently reduce earned fee. Review the fee calculation after any limit change and reprocess if the effective date goes back to a prior period.
Weekly funding watch (concept)
For each open cost-type project:
remaining_funding = funded_amount - billed_to_date
burn_rate = average weekly incurred cost, last 8 weeks
weeks_left = remaining_funding / burn_rate
Flag when weeks_left < notice period in the contractPreventing the surprise
Most overruns are discovered at invoice time because nobody was watching the burn rate. Build a weekly funding watch for every cost-type project. Compare remaining funding to the average recent weekly cost and flag any project whose remaining runway is shorter than the notice period in the contract.
Also make sure contract modifications enter Costpoint the same week they are signed. A common root cause is a signed modification sitting in a contracts folder while the project still shows the old funding. A simple checklist at modification signing, with a named owner, prevents most of these holds.
Common pitfalls
- !Raising the limit in Costpoint without a signed modification to support it.
- !Treating contract value as funded amount and overspending the actual obligation.
- !Moving costs to another project to clear a hold, which is a mischarge.
- !Ignoring the notice requirement in a limitation of cost clause until funding is exhausted.
- !Forgetting to reprocess billing and fee after a retroactive modification.
- !Letting unbilled receivables age without anyone owning the funding fix.
How an ERP-grounded AI assistant handles this
A grounded assistant can answer 'which projects will run out of funding in the next six weeks' by combining funded amount, billed to date and recent cost burn, and list the ones inside their contract notice window. Because it reads the data live and shows the query, project managers can check the logic. It does not change funding; changes need a signed modification and your usual approvals.
Frequently asked questions
Why is my invoice lower than the cost I incurred?
If limits are enforced, billing is capped at the funded amount or the applicable limit and the excess remains unbilled. Compare the invoice to the project's funding and limit settings, and confirm whether a pending modification should raise them.
Can I keep working while we wait for funding?
That is a contract and legal question. Limitation of cost and limitation of funds clauses restrict reimbursement for costs beyond funding, and you may be incurring cost at your own risk. Ask your contracts team before directing staff to continue.
Where do I see remaining funding by project?
Use the project status or funding-related reports in Costpoint, or a saved query comparing funded amount to billed and incurred cost. Most teams add a weekly report so remaining funding is reviewed before invoices are run.
Does this apply to fixed-price contracts?
Not in the same way. Fixed-price billing follows milestones or percent complete rather than cost reimbursement limits, though the project may still have a contract value. The funding and ceiling logic mainly applies to cost-type and T&M work.
Related
Costpoint Timesheet: Employee Cannot Charge to a Project
When Costpoint rejects a charge line on a timesheet, one of a short list of validations has failed: the project or task is not open for charging, the account or organization on the line is not valid for that project, the employee is not set up to charge it, or the timesheet date falls outside an open period. Work through those checks in order and the cause is almost always found in minutes.
AdvancedCostpoint Year-End Close and Indirect Rate True-Up
At year end a Costpoint contractor closes the periods, computes actual indirect rates from final pool and base amounts, and posts a true-up for the difference between provisional rates used all year and the actual rates. Do these in sequence, with reconciliations between each step, and the later incurred cost submission becomes mostly a reporting exercise.
How-toHow to Set Up Indirect Rate Pools in Deltek Costpoint
Indirect rate pools in Costpoint group related indirect costs, such as fringe, overhead, G&A, or material handling, so they can be allocated to direct cost bases using a defined rate. Pools and their bases are configured under the Indirect Rate Structure area, with pool tiers sequenced so that lower-level pools like fringe allocate into higher-level pools like overhead before G&A is calculated.
How-toHow to Prepare an Incurred Cost Submission From Costpoint
An incurred cost submission is built from closed-year, reconciled Costpoint data: final direct cost by contract, pool and base amounts, and final indirect rates. Close the fiscal year, freeze the cost data, reconcile pools and bases to the general ledger, then map the results into the government's Incurred Cost Electronic (ICE) model schedules before the deadline.
How-toHow to Create a Generic Inquiry in Acumatica
Generic Inquiries (GI) are Acumatica's no-code query builder for joining tables, adding filters, and exposing the result as an inquiry screen, dashboard data source, or API endpoint. Open System > Customization > Generic Inquiry, add your base table, define joins and conditions, then run and save. No SQL or customization project is required.
Error fixFix Odoo AccessError: You Are Not Allowed to Access Records
Odoo raises AccessError when a user's security groups do not grant a CRUD right on a model through ir.model.access.csv, or when an ir.rule record rule filters the specific record out for that user or company. Fix it by adding the user to the group named in the error, editing the model's access rights, or reviewing the record rule's domain under Settings > Technical > Security.
AI for ERPAI for Deltek Costpoint in government contract accounting
AI on Deltek Costpoint for timesheets, indirect rates, and incurred cost, grounded on real data and deployed on-prem to keep DCAA-relevant data in house.
Stuck on Deltek Costpoint?
Talk to engineers who work inside Deltek Costpoint every week, and who build private AI that answers these questions from your own ERP data.