Other ERPsFree templatePDF, Excel, Word exportDeltek Costpoint

Deltek Costpoint Private AI Layer Blueprint Generator

This generator turns a few inputs about your Deltek Costpoint environment into a structured architecture plan for a private, on-prem AI assistant. It covers components, security controls, a three-phase rollout and questions for IT, ready to export and share.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Deltek Costpoint Private AI Layer Blueprint Generator

Private AI Layer Architecture Plan: Deltek Costpoint

Company: Acme Precision Ltd Deltek Costpoint version: Costpoint 7.1 Database: SQL Server Hosting: on-prem server Named users: 400 across 2 site(s) Target go-live: 2027-03-01

1. Context and goal

Acme Precision Ltd runs Deltek Costpoint and wants an AI assistant that answers questions and drafts work without moving data off its own infrastructure. The assistant is read-only by default and shows the query or API call behind each answer.

Main use cases: Order and stock status questions, shortage summaries, supplier email drafts, and answers from procedures and certificates.

Typical Costpoint questions cover project cost to date, funding remaining, labor by project and variance explanations, and many answers cite long contract or policy documents.

2. Components

ComponentDesign for Deltek CostpointNotes
Data access pathRead-only replica with an ai_read view schema over PROJ, ORG, ACCT and ledger summary tables; Costpoint web services for single recordsViews built from your own data dictionary
Retrieval indexVector and keyword index over contracts, SOWs, rate approvals and policies inside the same boundaryAccess controls copied as metadata
Model servingvLLM or Ollama on 1 x 48 GB GPU, hosted on-prem serverModel sized for 400 named users
Tool serverNamed read tools; drafts only for anything that touches accountingNo model-posted entries
Identity and permissionsDirectory user mapped to Costpoint user; organization and project access appliedLabor and personnel data restricted
AuditPrompt, tool call, SQL or web service request, answer, approverRetained inside the boundary and available to assessors

3. Security controls mapped to your inputs

Requirement from your inputsControlVerification
Data that must never leave the site: Customer pricing, drawings, personnel data and any export controlled or contract data.Model and index run on-prem server; no outbound inference calls; egress blocked at the gatewayFirewall rule review and test with outbound traffic blocked
Named users: 400Directory sign-in; every call carries the asking user; rights applied as filters or by the system APITest with users of different rights and confirm different answers
Database: SQL ServerRead-only replica or reporting copy; no write access for the assistant accountAttempt a write with the assistant login and confirm it fails
Sites: 2Site and company limits applied to every tool callCross-site test queries
WritesOnly via supported APIs with named human approval; no direct database writesReview the approval log for a sample period

4. Three-phase rollout

PhaseScopeExit criteria
Phase 1: read-onlyQuestions on core transactions, with the query shown. Pilot group first. GPU: 1 x 48 GB GPU.Answer accuracy checked against reports on a sample set; no permission leaks
Phase 2: draftsDraft emails, summaries and transaction payloads; nothing sent or posted automatically.Users accept most drafts with light edits; audit log complete
Phase 3: approved actionsNarrow set of low-risk actions through supported APIs with approvers. Accounting entries are never posted by the model; drafts are submitted by a person through standard screens or import interfaces.Rollback procedure tested; approvers named per action

5. Open questions for IT

1. Which environments and companies or folders are in scope? 2. Can a read-only replica be created on SQL Server, and who owns it? 3. Which directory provides identity, and how are users mapped to Deltek Costpoint users? 4. Where do documents and attachments live, and who controls their permissions? 5. Is 1 x 48 GB GPU confirmed, and who hosts and patches the model server? 6. Which logs go to the SIEM, and how long are they kept? 7. Who approves each write action, and what is the rollback plan? 8. Does the plan need to be added to a security or compliance boundary before go-live on 2027-03-01?

Approvals

Prepared by / Date
IT lead / Date
Security officer / Date
Business owner / Date

Planning document, not a design guarantee. Model size, GPU count and index size must be validated with your own prompts and data. Verify table, API and version details against your Deltek Costpoint documentation.

Review my Deltek Costpoint AI blueprint

Send your generated plan for an optional expert review against your Deltek Costpoint environment. The tool works fully without it.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Fill in the company name, your Deltek Costpoint version, database engine, hosting model, user and site counts, the main use cases, and the data that must stay on site. Pick the GPU you have or expect to buy, set a target go-live date, and the document updates as you type. Export to PDF or Word and circulate to IT, security and the business owner before any build starts.

  • Be specific in the never-leave field; it drives the security table.
  • Use the open questions section as an agenda for the first IT meeting.
  • Re-generate after each decision so the plan stays current.

The design behind the plan

The plan follows a common pattern: a read-only copy of the data, a retrieval index over documents, a tool server that exposes only approved read actions, an open-weight model served locally with vLLM or Ollama, and an audit log. Deltek Costpoint-specific choices are in the components table, including how to read records and how to apply user permissions.

How to read the result

Treat the components table as the technical scope and the security table as the acceptance test list. The rollout table is deliberately cautious: phase 1 is read-only, phase 2 is drafts, and only phase 3 touches transactions. If your organisation is not ready for phase 3, stopping after phase 2 still delivers real value.

Common mistakes

Skipping identity mapping, giving the assistant a broad service account, letting the model compose free-form SQL, and planning hardware before measuring prompts are the usual failures. Another is treating the model as an authority on arithmetic; totals should come from queries. The plan encodes the opposite choices.

Frequently Asked Questions

Does this plan require internet access?

No. The design runs the model, index and gateway inside your network. For an air-gapped network, weights and containers are imported on approved media and there is no outbound route.

Is the assistant able to change data in Deltek Costpoint?

Read-only by default. Writes are limited to supported APIs, drafted by the assistant and submitted only after a named person approves them. Direct database writes are excluded.

How accurate are the hardware choices?

They are planning ranges. Use the sizing calculator and then test with your own prompts and document sizes before ordering hardware.

Can I share the output with auditors?

Yes, as a design starting point. It lists controls and verification steps. It does not assert any certification; your own compliance process decides what evidence is required.

Want this plan reviewed against your actual Deltek Costpoint environment? Netray can review the blueprint with your IT team and partner and build the private AI layer on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software