How-toDELMIAworks (formerly IQMS)Engineering / Quality / Shop Floor

DELMIAworks with SolidWorks, SPC and Shop-Floor Add-ons

Question
delmiaworks solidworks

Also searched as

  • delmiaworks spc
  • delmiaworks shopworks
  • shopworks for delmiaworks
  • solidworks bom to delmiaworks

Short answer

To get a SolidWorks bill of materials into DELMIAworks, export the BOM with item numbers that match the ERP item master, stage it, validate it, and load it through a supported import or the web API. SPC and shop-floor add-ons connect through the same pattern: define the data, the owner of each field, and a validation step. Confirm product specifics with the vendor.

Applies to: DELMIAworks (IQMS) with SolidWorks or SolidWorks PDM. Vendor-specific add-on names (including ShopWorks) should be confirmed with your reseller.

BOM transfer from SolidWorks to DELMIAworks

  1. 1Agree the item numbering rule so SolidWorks part numbers equal ERP item numbers.
  2. 2Add custom properties in SolidWorks for the ERP fields (description, unit of measure, make or buy, material).
  3. 3Export the BOM, from SolidWorks or PDM, to a flat file or table with a revision.
  4. 4Load it into a staging area and validate: missing items, unit mismatches, duplicate levels.
  5. 5Create new items in the ERP item master first, then the BOM structure.
  6. 6Load through a vendor-supported import or the web API; do not write straight to the tables.
  7. 7Control revisions with an engineering change process so released BOMs are not overwritten.
  8. 8Reconcile after load: compare counts and a few BOMs by hand.

Who owns what

Engineering owns geometry, drawings and the design BOM; the ERP owns the manufacturing BOM, routings and costs. The two are not identical: the ERP BOM adds phantom, consumable and purchased items that the CAD model never contained. Decide this before building any integration.

SPC

Statistical process control needs measurement data tied to a part, a characteristic and a work order. DELMIAworks includes quality functions, and some sites use separate SPC tools. Whichever you use, the integration must carry part number, operation, characteristic, limits and result, and must not let operators edit limits.

Shop-floor add-ons

ShopWorks and similar tools are shop-floor data collection add-ons. Ask the vendor for the supported connection method, the data it reads and writes, and its support for your version. Keep a test environment so that updates to either side can be tried first.

Try it here, free

DELMIAworks (IQMS) Private AI Layer Blueprint Generator

Open full tool

Fill in your version, database, hosting and use cases to get an architecture plan for a private, on-prem AI assistant on DELMIAworks (IQMS), ready to share with IT and security.

Common pitfalls

  • !Assuming the CAD BOM is the manufacturing BOM.
  • !Different part numbers in CAD and ERP, forcing manual mapping.
  • !Loading BOMs without revision control.
  • !Buying an add-on without checking compatibility with your DELMIAworks version.

How an ERP-grounded AI assistant handles this

An assistant can compare a staged CAD BOM against the ERP item master and existing BOMs, listing missing items and unit conflicts before anything loads. It reads and reports; the load remains an approved step. Netray builds such checks on-prem.

Frequently asked questions

Does DELMIAworks integrate with SolidWorks?

Both belong to Dassault Systemes, and sites typically move BOMs through exports and supported imports. Ask your reseller for the current supported method for your version.

Can SPC data live in DELMIAworks?

DELMIAworks has quality capabilities, and some sites add dedicated SPC tools. Choose based on your characteristics and reporting needs, and confirm with the vendor.

What is ShopWorks for DELMIAworks?

It is referred to as a shop-floor add-on. Confirm its vendor, supported versions and connection method with your reseller before relying on it.

Related

How-to

DELMIAworks Web API: How to Integrate and Where to Get Support

DELMIAworks offers a web-based API for integration, and the technical documentation sits behind the customer support portal for licensed customers, so confirm access and licensing with your account team first. Alongside it, many sites integrate through the Oracle database, import and export utilities, and middleware. Pick the route by direction of data and risk.

Advanced

IQMS ERP API: DELMIAworks Integration Options Compared

IQMS was renamed DELMIAworks after Dassault Systemes acquired it, so searches for the IQMS ERP API lead to the DELMIAworks integration options: a web API, read-only access to the Oracle database, import and export utilities, EDI, and middleware. The right option depends on whether you read, write or both, and on how much upgrade risk you accept.

Advanced

How to Add a Private AI Layer to DELMIAworks (IQMS) On-Prem

DELMIAworks, formerly IQMS EnterpriseIQ, runs on an Oracle database that you can read through a standby or replicated copy. A private AI layer queries well-known tables such as ARINVT for items, indexes documents locally, serves an open-weight model on your own GPUs, and writes back only through the vendor's supported interfaces after a person approves.

AI for ERP

AI for DELMIAworks (IQMS), grounded in your production monitoring data

Add private, on-prem AI to DELMIAworks (IQMS): query production monitoring data, triage scrap, and draft CAPA reports in plain language. See how it fits your plant.

AI for ERP

AI for SOLIDWORKS PDM: Ask Your Vault and Your ERP the Same Question

Private AI for SOLIDWORKS PDM Professional: search vault metadata, explain where-used and BOM differences, review ECO workflows and sync with your ERP item master.

Stuck on DELMIAworks (formerly IQMS)?

Talk to engineers who work inside DELMIAworks (formerly IQMS) every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software