How-toSAP ERP / S/4HANAQM / Sampling Procedures and Schemes

How to Create a Sampling Procedure in SAP QM

Question
how to create sampling procedure in sap qm

Also searched as

  • sampling procedure create
  • qdv3 sap sampling procedure
  • sap qm sampling scheme qdp1

Short answer

In SAP QM, a sampling procedure decides how many units to inspect and how to accept or reject the lot. Maintain it in QDV3, choose a sample type (fixed, percentage, sampling scheme or 100 percent) and a valuation mode, and where needed build the scheme in QDP1. Then assign the procedure to a master inspection characteristic or inspection plan.

Applies to: SAP ECC 6.0 and S/4HANA QM; QDV3, QDP1, QP01 and QS21

Create and use a sampling procedure

  1. 1Decide the inspection need: fixed sample size, percentage of the lot, 100 percent, or a size from a statistical scheme such as an AQL table.
  2. 2If you need a scheme, run QDP1 (Create Sampling Scheme), define the lot size ranges and the sample size and accept or reject numbers for each, then save.
  3. 3Run QDV3 (Maintain Sampling Procedure) and create a new procedure with a key and a short text.
  4. 4Choose the sample type: for example fixed sample, percentage sample, or use the sampling scheme created earlier.
  5. 5Set the valuation mode, which defines how the sample result decides accept or reject, for example by number of defectives.
  6. 6Optionally link a dynamic modification rule so inspection stringency changes automatically with quality history.
  7. 7Assign the procedure to a master inspection characteristic (QS21) or directly to the characteristic in an inspection plan (QP01), then test with a sample lot.

Procedure, scheme and valuation mode

The sampling procedure is the object plans reference. It defines the sample type and valuation mode. A sampling scheme is optional and holds the table of lot size versus sample size and accept and reject numbers, typically built from a standard such as ISO 2859 or ANSI tables your quality department uses.

The valuation mode tells QM how to evaluate the results. For attributes, it often uses the number of defectives against the accept number from the scheme. For variables, it may use mean and standard deviation rules. Choose the mode that matches your quality standard.

Choosing the sample type

Fixed sample is simplest: always inspect the same number of units, such as one for first article. Percentage sample scales with the lot. Sampling by scheme gives statistical rigor and the right lot size dependency. 100 percent inspection checks every unit and suits critical features or small lots.

Match this to risk. High-risk safety characteristics should not use a lenient sample. Low-risk visual checks seldom justify 100 percent. Document the reasoning, since auditors often ask.

Assigning to plans and dynamic modification

A procedure is used where a characteristic is defined: on the MIC in QS21 or on the plan line in QP01. If the plan line has none, the MIC default is used. Check the sample size in the inspection lot (QA03) after creation to confirm the system calculated what you expected.

Dynamic modification rules, created in QDR1, adjust inspection stringency by quality history, moving from normal to reduced or tightened inspection. They need to be assigned in the material master QM view or plan and rely on lot results being recorded promptly.

Try it here, free

SAP QM Sample Size Calculator by Lot Size and Sampling Procedure

Open full tool

Compare the sample size from an AQL table, a percentage rule and a fixed sample for any lot size, and estimate the inspection time.

Common pitfalls

  • !Defining a scheme with overlapping or missing lot size ranges.
  • !Assigning a sampling procedure that does not match the characteristic type.
  • !Forgetting to release or assign it, so the lot gets a default sample.
  • !Mixing attribute and variable valuation modes without testing.
  • !Turning on dynamic modification without capturing results timely.

How an ERP-grounded AI assistant handles this

A private AI layer can read your sampling procedures, plans and past inspection lots to show where the sample size is inconsistent or where a characteristic has no procedure. It supports review and training, while procedures and schemes continue to be maintained in SAP QM.

Frequently asked questions

What transaction creates a sampling procedure?

QDV3 maintains sampling procedures in SAP QM. If you need a sampling scheme with lot size ranges and accept numbers, create it first in QDP1 and then reference it in the procedure.

What is the difference between a procedure and a scheme?

The procedure defines the sample type and valuation mode and is what plans reference. The scheme is a table of lot sizes, sample sizes and accept or reject numbers used when the sample type is scheme-based.

How do I assign it to an inspection plan?

In QP01 enter the procedure on the characteristic line, or define it on the master inspection characteristic in QS21 so it is the default. Then check the lot in QA03 to confirm the calculated sample size.

Can I change inspection stringency automatically?

Yes, with dynamic modification rules. They move between normal, reduced and tightened inspection based on quality history, and need assignment on the material or plan together with consistent results recording.

Related

How-to

How to Create a MIC (Master Inspection Characteristic) in SAP QM

A MIC is a reusable inspection characteristic in SAP QM, created in QS21 with a plant, a name and a version, then defined as quantitative (measured values with limits) or qualitative (codes from a catalog). Inspection plans (QP01) pick MICs so tolerances are maintained once. MIC data is in table QPMK, with text in QPMT.

How-to

What Is First Article Inspection in SAP, and How to Run It in QM

First article inspection (FAI) in SAP is not a single button. You model it in SAP QM with an inspection type that creates an inspection lot when the production order is released, an inspection plan with the characteristics to verify on the first piece, and results recorded then closed by a usage decision. Aerospace AS9102-style FAI forms normally need extra reporting on top.

How-to

SAP QA11 Usage Decision: Make It and Post Stock Correctly

The usage decision (UD) in QA11 closes an inspection lot, assigns a quality score and a UD code such as accepted or rejected, and posts the lot quantity from quality inspection stock to unrestricted use, blocked stock, scrap or return to vendor. The UD is blocked until required inspection characteristics are closed and results are recorded.

Error fix

SAP M7 021: Deficit of SL Stock Quantity

M7 021 fires during a goods issue, delivery, or confirmation when SAP checks the unrestricted-use (SL) stock for the exact plant, storage location and batch combination and finds less than what you are trying to post out. Fix the entry (batch, storage location, quantity) first; only enable negative stock or downgrade the message to a warning if the business genuinely needs to post ahead of a receipt.

Error fix

SAP IDoc Status 51: Application Document Not Posted

Status 51 tells you the IDoc reached the application layer and failed to post, but the status text itself is not the error - the real cause sits in the status record's long text or the linked application log. Fix the underlying data or configuration, then reprocess the IDoc through BD87 rather than editing the status.

Error fix

SAP Short Dump TIME_OUT: Maximum Runtime Exceeded

A TIME_OUT runtime error means a dialog (or RFC) work process ran longer than the maximum allowed runtime, controlled by profile parameter rdisp/max_wprun_time (600 seconds by default). The fix is almost always to move the long-running work to background processing or tune the underlying program, not to raise the timeout.

AI for ERP

AI for SAP Quality Management: Notifications, 8D, and CAPA Without the Manual Drafting

AI grounded on SAP QM data that triages notifications, drafts 8D and CAPA reports, and summarizes inspection trends, deployed on-prem for full traceability.

AI for ERP

AI for NCR, CAPA, and 8D Drafting in AS9100 and ISO 9001 Quality Systems

AI drafts NCR, CAPA, and 8D reports from ERP quality data for engineer review, cutting drafting time under AS9100 and ISO 9001 without changing sign-off.

Stuck on SAP ERP / S/4HANA?

Talk to engineers who work inside SAP ERP / S/4HANA every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring