Infor XA PowerLink (Power Link), SIWA and Net-Link: What Each Does and Your Options
infor xa powerlink
Also searched as
- infor xa power link
- infor xa siwa
- infor erp xa net-link
- infor xa user guides
Short answer
Infor XA runs on IBM i with a 5250 green-screen core. PowerLink (also written Power Link) and Net-Link are the interface layers Infor offered to put a more modern or web face on that core, and SIWA is another piece of XA's interface and integration tooling. Because naming and packaging changed across releases, confirm exactly what is installed before planning any change.
Applies to: Infor XA (formerly MAPICS XA) on IBM i. Release-specific details differ; treat this page as orientation and verify against your installed release documentation.
Work out what your XA environment uses
- 1Ask your IBM i administrator which Infor XA components are installed, using the product library list and the installed licensed program inventory.
- 2Collect the user guides and release notes for your XA release; they are the authoritative source for each component's name and role.
- 3Survey users: who works in 5250 sessions, who uses PowerLink or Net-Link, and who uses neither and relies on exports.
- 4Map each interface to its dependencies: Windows clients, Java versions, web servers, browser support.
- 5Identify reporting and BI tools that read XA data, and whether they connect through ODBC, DB2 for i or flat extracts.
- 6Check support status for every component and for the IBM i OS level you run.
- 7Decide per interface: keep, replace with browser access, or retire in favour of a data layer outside the 5250 UI.
The interface layers in plain terms
XA business logic lives in RPG and CL programs on IBM i, with data in DB2 for i files. The native interface is a 5250 terminal session. PowerLink is associated with a Windows-based graphical front end over those programs. Net-Link is the web-based approach, covered separately in the related page. SIWA appears in Infor documentation as part of the XA interface and integration tooling, and its role should be confirmed from your release guides.
None of these replace the business logic. They are presentation and integration layers, which is why they can be modernized or replaced without changing how orders, inventory and MRP calculate.
PowerLink, reporting and BI
People often meet Power Link in the context of getting data out of XA into Excel and reports. The reliable long-term pattern is to read DB2 for i directly through ODBC or JDBC with a read-only profile, or to land data into a separate store, rather than depend on a legacy client that needs old Windows or Java versions.
If your reporting depends on a desktop component that vendors no longer support, treat that as a risk item and plan a data-layer replacement first, since it carries no business logic risk.
Modernization options
Options range from keeping XA and wrapping it with web services, to adding a read-only analytics layer, to migrating the ERP. Wrapping with ION or REST-style services is covered in the related integration page. A private AI layer sits at the data layer and does not require changing the 5250 screens at all, which makes it a low-risk first step.
Try it here, free
Infor XA Secure Net-Link Setup and Upgrade Checklist
A step checklist for deploying or redeploying Net-Link for Infor XA 9.2 and 10 in Apache Tomcat or IBM WebSphere, securing it with TLS and verifying it before users switch.
Common pitfalls
- !Assuming the same component names mean the same thing in every XA release.
- !Depending on old Windows or Java clients with no support path.
- !Giving BI tools write-capable IBM i profiles.
- !Starting an interface rewrite before documenting what users actually do.
How an ERP-grounded AI assistant handles this
XA users often cannot get answers without a green-screen inquiry or a developer-written query. A private assistant such as ERPray or a DataRay deployment can read DB2 for i through a read-only profile and answer questions in plain language, showing the SQL, without installing anything on the 5250 side. It can run on your own hardware near the IBM i partition.
Frequently asked questions
What is PowerLink in Infor XA?
It is an Infor XA interface and integration component associated with a graphical Windows front end over XA programs. Naming and packaging varied by release, so confirm with your installed documentation.
Is Power Link the same as PowerLink?
In searches and documentation both spellings refer to the same product family. Treat them as the same unless your release guides distinguish them.
What is SIWA in Infor XA?
It is a component name used in XA interface and integration documentation. Check the user guide for your release for its exact role rather than relying on a short description.
How do I get XA data into BI tools?
Use ODBC or JDBC access to DB2 for i with a read-only profile, or scheduled extracts to a separate store. This avoids dependence on legacy desktop components.
Related
Infor XA Net.Link: what it is, how it is configured and common issues
Net.Link is the web access layer associated with Infor XA (formerly MAPICS XA) that exposes XA functions through a browser, running on an IBM i web application server. It depends on the IBM i version, the web server profile and Java runtime, so most problems after changes trace to those components. Details vary by XA release, so confirm against your installation guide.
How-toInfor XA REST API: expose XA through IBM i Integrated Web Services or ION
Infor XA has no single built-in REST API. Practical routes are IBM i Integrated Web Services (IWS), which turns RPG or SQL routines into REST endpoints on the same machine, and Infor ION where your environment supports it. For reads, SQL-backed services are straightforward. For writes, call XA's own programs so business rules run.
How-toInfor XA User List Report: Users, Status and Access for an Audit
Infor XA runs on IBM i, so a complete user list is built from two layers: the IBM i user profiles (who can sign on, status, last sign-on, group profiles, special authorities) and the XA application security tables (which menus, functions and facilities each user may run). Export the first with DSPUSRPRF or the QSYS2.USER_INFO view, add the second from your XA security setup, and join them by user ID.
How-toInfor XA costing: cost types, roll-up and standard cost setup
Product costing in Infor XA builds an item's cost from its material, labor, and overhead using the bill of material and routing. Standard cost is the frozen planning cost used to value inventory and measure variance, while other cost sets are used for current or simulated views. A cost roll-up calculates costs from the lowest BOM level upward. Exact program names and options vary by release.
How-toInfor XA Factory Track: What It Does and How to Plan Shop Floor Data Collection
Factory Track is the shop floor data collection offering associated with Infor XA. It captures labor, job and material transactions at the work centre, often with bar code terminals, and posts them to XA production control so that job status, costs and inventory stay current without re-keying. Details differ by release, so check your documentation before configuring anything.
AdvancedHow to add a private AI layer to Infor XA on-prem
Infor XA keeps its data in Db2 for i on IBM i, so the safest way to add AI is a read-only reporting copy or logical-file access over JDBC or ODBC, a retrieval index over documents, a small tool server that exposes approved queries, and an open-weight model served on local GPUs. Nothing has to leave the building, and any write-back goes through the supported XA transaction programs after a person approves it.
AI for ERPAI for Infor XA on IBM i: On-Prem, No Replatforming Required
Add AI to Infor XA on IBM i (AS/400) without a migration project. Read DB2 for i directly, ground answers in live XA data, keep everything on-prem.
Stuck on Infor XA (IBM i)?
Talk to engineers who work inside Infor XA (IBM i) every week, and who build private AI that answers these questions from your own ERP data.
New to Infor XA? Start with the Infor XA guide and toolkit.
Keep exploring
Free tools
- Infor XA Secure Net-Link Setup and Upgrade ChecklistA step checklist for deploying or redeploying Net-Link for Infor XA 9.2 and 10 in Apache Tomcat or IBM WebSphere, securing it with TLS and verifying it before users switch.
- IBM i Commands for Infor XA Administrators ReferenceA lookup of common IBM i CL commands for jobs, output, libraries, objects, data and backups, with what each is for.
- Infor XA AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor XA users.
ERP fixes and how-tos
- Infor XA Net.Link: what it is, how it is configured and common issuesWhat Net.Link is in Infor XA (MAPICS), how the web layer on IBM i is typically set up, what commonly breaks, and what to do when planning modernisation.
- How to add a private AI layer to Infor XA on-premReference architecture to add AI to Infor XA on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
- Infor XA User List Report: Users, Status and Access for an AuditHow to produce an Infor XA user list and access report for an audit: IBM i user profiles, group profiles, last sign-on and XA application security, with SQL.
Guides
- Infor LN UI Modernization OptionsInfor LN UI options compared: LN Web UI, Ming.le homepages, custom portals and mobile, with a tiered plan by user type to modernize the LN interface.
- BAAN Reporting Modernization and BI Platform MigrationModernize BAAN reporting with BI platform migration, Crystal Reports replacement, real-time dashboards, and self-service analytics for legacy BAAN environments.
- AI-Powered Documentation Generation for ERP SystemsAutomatically generate ERP documentation with AI agents including user guides, configuration docs, process flows, and training materials from live system data.
Integrations
- How to connect Power BI to Infor XAHow to connect Power BI to Infor XA on IBM i: Db2 for i connector, on-premises data gateway, a staging warehouse, manufacturing dashboards and Q&A.
- How to add AI agents to Infor XA on IBM iHow to add AI agents to Infor XA on IBM i: a tool layer over Db2 for i and RPG programs, approval gates, on-prem models, and realistic expedite and exception flows.
Software
- Infor XAIndependent guide to Infor XA (formerly MAPICS XA), an IBM i ERP for discrete manufacturers: modules, integration options, limits and modernisation paths.
- Microsoft Power BIVendor-neutral guide to Microsoft Power BI for manufacturers: modules, ERP and MES integrations, strengths, limitations, alternatives and AI use cases.