Infor XA Secure Net-Link Setup and Upgrade Checklist
A checklist for installing or upgrading Net-Link and Secure Net-Link for Infor XA 9.2 and 10, following the steps in Infor's Setup Guide for Secure Net-Link. It covers WAR generation, deployment to Apache Tomcat or IBM WebSphere, TLS, the SiWA reverse proxy and go-live checks.
0 of 31 items complete
9 critical items still open - these are the highest-risk gaps.
Prerequisites
Generate the WAR file
Deploy to Tomcat or WebSphere
Security
Rollout and go-live verification
Critical items protect access and security. Do not switch users to the new Net-Link until every critical item is ticked; non-critical gaps can be closed in the first week.
Get your Net-Link plan checked
Send us your topology, ports and certificate plan and we will check them against the Infor Secure Net-Link steps before your change window.
Optional. The tool and every export work without this. No spam.
Where Net-Link fits
Net-Link is the browser interface to XA, built on IDF. In a standard install users reach it through a URL on the IBM i, which keeps them inside the network. When users outside the network need access, Infor's guidance is not to expose the IBM i directly but to run the Net-Link web components in a servlet container, Apache Tomcat or IBM WebSphere, packaged as a WAR file. The WAR contains configuration for talking to the IBM i, which is why it is generated from your own environment rather than shipped with IDF. The container used for System i Workspace (SiW Anywhere) can host it as well.
How to use the checklist
Work through the groups in order and tick items as they are done; export the result to keep with the change record. On an upgrade, repeat the WAR group and the redeploy item whenever a new IDF build is applied, because an old WAR can carry components that no longer match the server. Record the ports you use: the Infor examples use 36001 for IDF HTTP and show how to move Net-Link to a new port when the wizard warns of a clash. Critical items are the ones that, if skipped, leave the system exposed or users unable to sign in.
TLS, reverse proxy and threads
Run the Configure TLS wizard in HTTPAdmin for the Net-Link HTTP server, choose to disable non-SSL access, select the certificate from the system store and restart. Infor recommends that SiWA and Net-Link use the same host and port, done with a reverse proxy in the WSANYWHERE httpd.conf: load proxy_module and proxy_http_module and add ProxyPass and ProxyPassReverse for /NetLink inside the SSL virtual host. Then set the secured URL in SiWA Admin. The guide also notes that IBM default thread counts can be too low: HTTP server threads default to 40 and web container threads to 50, and the guide suggests users x 125% for HTTP threads and 10 more for the web container.
Common mistakes
Most failed deployments trace back to host names: if the IBM i and Windows server do not have proper FQDNs before System i Workspace is installed, URLs and SSL settings are created wrong. Other frequent problems are deploying a WAR downloaded from the global environment when the user's environment is on a different build, forgetting to update the Net-Link URL in SiWA Admin after enabling TLS, and leaving port 2001 reachable from outside. Keep the previous WAR and httpd.conf so you can roll back in minutes.
Frequently Asked Questions
How do I get the NetLink.war file for Infor XA 10?
Sign in to Net-Link for the environment that has the correct build, then in the same browser session open http://server:port/NetLink/WebArchive, where server is the IBM i hosting IDF and port is the IDF HTTP port. The NetLink.war file is generated from that environment and downloaded.
Can Net-Link run in Tomcat instead of WebSphere?
Yes. Infor's guide covers Apache Tomcat, typically the Tomcat used by a SiWA Windows install, and IBM WebSphere 8.5 and 9.x on IBM i. For Tomcat you stop the SiWA service, copy NetLink.war into the webapps folder and restart, and Tomcat deploys it automatically.
Do I need to redeploy Net-Link after applying an IDF build?
Yes. The WAR file contains components that can change with each IDF build, so Infor recommends refreshing it whenever a new build is applied. Regenerate the WAR, replace it in Tomcat or use Update on the installed application in WebSphere, and restart the HTTP and application servers.
How many threads should Secure Net-Link have?
Infor's guide notes IBM defaults of 40 HTTP server threads and 50 web container threads, which can be too low. It suggests setting HTTP threads to about your user count x 125% and the web container to 10 more. Save the WebSphere master configuration and restart both servers.
If you are opening XA to users outside the network and also want a private AI assistant behind the same secure front end, we can design both together on your own servers.
Related Tools
Infor XA Integration Options Reference (System-Link, IDF, Triggers, ION)
One row per way of getting data into or out of Infor XA on IBM i, with direction, transport, the XA objects involved and the main watch-outs.
Developer ToolsInfor XA IBM i SQL Services Health Query Generator
Fill in your XA library, thresholds and subsystem and get five ready-to-run Db2 for i queries for file size, reorganise candidates, inactive users, active XA jobs and history file growth.
Other ERPsIBM i Commands for Infor XA Administrators Reference
A lookup of common IBM i CL commands for jobs, output, libraries, objects, data and backups, with what each is for.
ERP Migration & SelectionInfor XA (MAPICS) Migration Readiness Assessment
Ten questions that score how ready you are to move off Infor XA (MAPICS), covering customizations, IBM i dependencies, data quality and ownership.
More Other ERPs tools
See all- MAPICS and Infor XA Private AI Layer Blueprint Generator
- Infor XA (MAPICS) AMFLIB Database File Reference
- Infor XA History File Growth and Purge Retention Simulator
- Infor VISUAL Work Order Status and Structure Reference
- Infor VISUAL Manufacturing Scheduling Checklist
- Infor XA (MAPICS) Period End Close Checklist
- Infor VISUAL Database Table Reference
- Infor XA (MAPICS) Application Module Reference
- Acumatica Generic Inquiry Design Template
New to Infor XA? Start with the Infor XA guide and toolkit.
Keep exploring
Free tools
- Infor XA AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor XA users.
- Infor XA Private AI Layer Blueprint GeneratorFill in your Infor XA version, database, hosting and use cases and get a shareable architecture plan for a private AI layer.
- IBM i Commands for Infor XA Administrators ReferenceA lookup of common IBM i CL commands for jobs, output, libraries, objects, data and backups, with what each is for.
ERP fixes and how-tos
- Infor XA PowerLink (Power Link), SIWA and Net-Link: What Each Does and Your OptionsWhat PowerLink (Power Link), SIWA and Net-Link are in Infor XA, how they relate to the 5250 interface, reporting and BI, and your modernization options.
- Infor XA Net.Link: what it is, how it is configured and common issuesWhat Net.Link is in Infor XA (MAPICS), how the web layer on IBM i is typically set up, what commonly breaks, and what to do when planning modernisation.
- How to add a private AI layer to Infor XA on-premReference architecture to add AI to Infor XA on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
Guides
- SyteLine 9 to 10 Upgrade ChecklistComplete upgrade checklist for migrating from Infor SyteLine 9 to SyteLine 10, covering Mongoose migration, database conversion, and form compatibility steps.
- MAPICS to SyteLine Migration Planning GuidePlan your MAPICS XA or MAPICS AS/400 migration to Infor SyteLine or CloudSuite Industrial. Data mapping, timeline, and risk mitigation strategies.
- SyteLine 9 to 10 Upgrade: The Complete Step-by-Step GuidePlan your SyteLine 9 to 10 upgrade with this step-by-step guide: Mongoose framework changes, FormSync customization merges, timelines, costs, and testing.
Integrations
- How to add AI agents to Infor XA on IBM iHow to add AI agents to Infor XA on IBM i: a tool layer over Db2 for i and RPG programs, approval gates, on-prem models, and realistic expedite and exception flows.
- How to add an AI chatbot to Infor XAHow to add an AI chatbot to Infor XA on IBM i: grounded answers from Db2 for i, internal and customer portals, role-based access, and a fully on-prem option.