How to Add a Private AI Layer to QAD Enterprise Edition On-Prem
how to add AI to QAD Enterprise Edition on-prem
Also searched as
- QAD EE AI integration without cloud
- QAD OpenEdge SQL read-only AI assistant
- private LLM for QAD on premises
Short answer
QAD EE runs on a Progress OpenEdge database, which can be read through the OpenEdge SQL-92 engine over JDBC or ODBC without touching the 4GL application. A private AI layer reads a replica or reporting copy, indexes documents locally, serves an open-weight model on your own GPUs, and writes back only through QXtend or another supported QAD interface with human approval.
Applies to: QAD Enterprise Edition 2008 through 2021 EE on OpenEdge 10.2B, 11.x and 12.x; Adaptive ERP differs and is covered separately
Steps to add a private AI layer to QAD Enterprise Edition
- 1Inventory the OpenEdge databases (typically a main QAD database plus any separate report or archive databases) and confirm the OpenEdge version and whether the SQL broker is licensed and running.
- 2Stand up a read-only copy: OpenEdge Replication to a target database, or a Pro2-style replication into SQL Server or PostgreSQL if you want a standard relational engine for the AI layer.
- 3Create a dedicated SQL-92 account with SELECT only on the tables the assistant needs, and run UPDATE STATISTICS so the SQL engine plans queries sensibly.
- 4Build a thin semantic layer: views or a documented query catalogue over pt_mstr, sod_det, pod_det, wo_mstr, ld_det, tr_hist and the customer and supplier masters, always filtered by domain.
- 5Index QAD attachments and linked documents (drawings, certificates, quality records) into a local vector store with the originating domain, site and document class stored as filter metadata.
- 6Serve an open-weight model with vLLM or Ollama on local GPUs and expose approved read actions to it through an MCP or tool server that logs every call.
- 7Map each QAD user to their domain and site access, and apply it as a mandatory filter on every query and every retrieval request.
- 8Release in phases: read-only questions first, then drafts (for example a draft PO change), then approved write-backs through QXtend inbound after a named user confirms.
How QAD EE exposes its data
QAD EE stores everything in Progress OpenEdge databases. The application is written in the Progress 4GL, but the database also has a SQL-92 engine, so any JDBC or ODBC client can query tables without going through application code. Tables are exposed in the pub schema with the familiar QAD names: pt_mstr for items, so_mstr and sod_det for sales orders, po_mstr and pod_det for purchase orders, wo_mstr for work orders, ld_det for inventory by location and lot, tr_hist for inventory transactions, cm_mstr and vd_mstr for customers and suppliers.
Almost every table carries a domain column (pt_domain, ld_domain and so on) because QAD EE is multi-domain. A query without a domain predicate returns rows from every domain the account can see, which is exactly what you must prevent for a per-user assistant. Treat the domain predicate as non-optional in the semantic layer.
For anything that changes data, QAD provides QXtend, its service layer for inbound and outbound business transactions. Writing to the OpenEdge tables directly with SQL bypasses 4GL validation, triggers and audit logic, so it is not an acceptable write-back path.
-- OpenEdge SQL-92, read-only account, domain-filtered SELECT ld_part, ld_site, ld_loc, ld_lot, ld_qty_oh, ld_status FROM pub.ld_det WHERE ld_domain = '10USA' AND ld_part = 'A-1042' AND ld_qty_oh <> 0;
# JDBC URL pattern for the DataDirect OpenEdge driver jdbc:datadirect:openedge://dbhost:5100;databaseName=qaddb -- Refresh optimizer statistics for the SQL engine UPDATE TABLE STATISTICS AND INDEX STATISTICS AND ALL COLUMN STATISTICS FOR PUB.ld_det;
Reference architecture
The assistant never connects to the production database. Use OpenEdge Replication to keep a read-only target, or a Pro2-style replication product into a relational copy, and point the SQL account at that. Heavy aggregate questions then cannot slow shop-floor transactions, and a compromised assistant has no path to production.
Around the replica sit four components: a retrieval index over documents and long-text fields, a tool server that exposes a short list of approved parameterised queries (open orders by customer, stock by lot, PO status by supplier), an open-weight model served with vLLM or Ollama, and an append-only audit log of prompt, tool calls, rows returned and user. Free-form SQL generation is possible, but start with the catalogue and widen it as you measure accuracy.
For air-gapped sites, every component runs inside the enclave: model weights are carried in on approved media, the embedding model is local, and there are no outbound calls. The same design works in a private cloud tenant when policy allows it.
Mirroring QAD security so users only see their own data
QAD controls access by menu function, domain and site, and many shops add their own restrictions in custom 4GL. The assistant has to enforce the data part of that model itself, because the SQL account sees everything it was granted. Sign users in through your identity provider, resolve their QAD user ID, and look up the domains and sites they are allowed to work in.
Inject those domains and sites into every query as bound parameters, and store the same values as metadata on every document chunk so retrieval filters on them before the model sees any text. Field-level restrictions, such as hiding cost or margin from some roles, need explicit rules in the semantic layer because they live in application logic, not in the database.
Test with deliberately restricted users. A question like 'what is our cost on part A-1042' must return nothing for a user without cost visibility.
Write-back, sizing and phased rollout
Write-back goes through QXtend inbound or another supported QAD interface, never raw SQL. The assistant prepares a draft transaction, shows the exact payload and affected records, and a named user approves it. QAD then applies its own validation, so the audit trail stays inside QAD.
Sizing is driven by concurrency, not named users. A plant with 100 to 300 named QAD users and 20 to 40 percent daily active use typically needs one to two 48 GB class GPUs for a 14B to 32B parameter model, plus a small CPU box for the vector store. Document volume sets index size; a few hundred thousand pages is a modest index measured in single-digit gigabytes.
Phase one is read-only questions over inventory, orders and purchasing for 4 to 6 weeks. Phase two adds document Q and A and drafts. Phase three enables a short list of approved write-backs, each with its own sign-off.
Honest limits
Custom tables and heavily customised 4GL logic are the main accuracy risk: the model can only reason about what the semantic layer describes. Budget time to document custom fields and status codes. Version matters too: very old OpenEdge releases and unlicensed SQL brokers can make SQL access impractical, in which case a replication-based extract is the fallback.
If your questions are all standard reports, QAD's own reporting and browse tools may be enough. And if you are moving to QAD Adaptive ERP, plan the AI layer against that platform's interfaces rather than investing deeply in EE table-level access.
Try it here, free
QAD EE AI Assistant Sizing and Value Calculator
Estimate peak concurrency, GPU count, index size, hours saved and payback for a private AI assistant on QAD EE.
Common pitfalls
- !Querying without a domain predicate, which mixes data from every domain the SQL account can see.
- !Skipping UPDATE STATISTICS on the OpenEdge SQL engine, then blaming the model for slow answers.
- !Pointing the assistant at the production database instead of a replica.
- !Writing to QAD tables with SQL instead of QXtend, which bypasses validation and the audit trail.
- !Ignoring customised fields and status codes, so answers look fluent but are wrong.
How an ERP-grounded AI assistant handles this
ERPray reads QAD through the read-only SQL path described here, shows the query it ran, and respects domain and site access. For custom QAD estates, Netray builds the semantic layer and tool server with your team, and keeps the model, index and logs on your hardware.
Frequently asked questions
Can an AI assistant read QAD EE without changing the application?
Yes. OpenEdge exposes a SQL-92 engine over JDBC and ODBC, so a read-only account on a replica can answer questions without any 4GL change. You still need a semantic layer, domain filtering and an audit log around it.
Do I need QXtend for a read-only assistant?
No. QXtend matters for write-back and event-style integration. Read-only phases use SQL on a replica plus a document index. Add QXtend only when you approve specific write actions.
What GPU do I need?
For a few hundred named users, one or two 48 GB class GPUs running a 14B to 32B open-weight model is a common starting point. Measure concurrency first; the calculator on this site gives a range.
Does this work air-gapped?
Yes. Model weights, embeddings, the vector store and the tool server all run inside the enclave. Updates arrive on approved media and nothing calls out.
Related
How to Back Up and Restore a QAD Progress Database with probkup and prorest
Use probkup online to take a consistent full backup of a running QAD database, add incremental backups between fulls, verify the backup with prorest -vp, and restore with prorest into a prepared structure. A file-level copy of a running database is not a valid backup. Pair backups with after-imaging if you need point-in-time recovery.
CIO briefingQAD vs Plex: Which Fits a Discrete Manufacturer?
Neither is universally better. Plex is a single cloud platform that combines ERP with MES, quality and shop floor control, which suits plants that want one system and are willing to adopt its standard processes. QAD is a configurable ERP strongest in multi-site, multi-country manufacturing, with a longer history on Progress and more deployment choices. Decide on your processes, footprint and integration needs, not on brand.
Error fixQAD Says "Unable to Connect to the Application Server": How to Fix It
This error almost always means the Progress OpenEdge AppServer broker behind QAD is stopped, unreachable over the network, or out of licensed connections, not a database problem. Confirm the broker process is running and healthy in OpenEdge Explorer, check the port and firewall path from the client, then restart the broker with clean agent settings.
AdvancedHow to Add a Private AI Layer to Global Shop Solutions On-Prem
Global Shop Solutions keeps jobs, routings, inventory, purchasing and quality data in one database that can be read through ODBC or the vendor's report and export tools. A private AI layer works from a read-only copy, builds a documented semantic layer over the tables you actually use, serves an open-weight model locally, and writes back only through vendor-supported import or API routes with approval.
AdvancedHow to Add a Private AI Layer to Classic JobBOSS On-Prem
Classic JobBOSS stores its data in a Microsoft SQL Server database, so a private AI layer can read job, operation, material, customer and delivery data through a read-only login on a restored or replicated copy. Documents stay in a local index, the model runs on your own GPU, and any change to JobBOSS goes through its own screens or supported import tools after a person approves.
How-toQAD ERP Tables and API Access: Key Tables, SQL and Integration Options
QAD Enterprise Edition stores data in Progress OpenEdge databases with short table names ending in _mstr (master) and _det (detail), for example pt_mstr for items, so_mstr for sales orders and po_mstr for purchase orders. You can read them with OpenEdge SQL-92 over ODBC or JDBC for reporting. For writing data or standard integration, use QAD's supported integration layer rather than direct database writes.
AI for ERPAI for QAD Adaptive ERP in automotive and industrial manufacturing
Add AI to QAD Adaptive ERP or Enterprise Edition for automotive and industrial manufacturing, grounded on QXtend and QAD's API layer, on-prem or private cloud.
AI for ERPAI Agents for ERP, Running On-Prem
A practical guide to on-prem AI agents for ERP: what they can safely automate, where human approval belongs, and how to design the guardrails.
Stuck on QAD Enterprise Edition (Progress OpenEdge)?
Talk to engineers who work inside QAD Enterprise Edition (Progress OpenEdge) every week, and who build private AI that answers these questions from your own ERP data.
New to QAD? Start with the QAD guide and toolkit.
Keep exploring
Free tools
- QAD EE AI Assistant Sizing and Value CalculatorEstimate peak concurrency, GPU count, index size, hours saved and payback for a private AI assistant on QAD EE.
- QAD EE Key Fields Reference (pt_mstr, so_mstr, sod_det, wo_mstr, po_mstr)Searchable list of the QAD Enterprise Edition fields report writers use most, by table, with type, meaning and the menu program that maintains them.
- QAD EE Private AI Layer Blueprint GeneratorFill in your version, database, hosting and use cases to get an architecture plan for a private, on-prem AI assistant on QAD EE, ready to share with IT and security.
ERP fixes and how-tos
- QAD ERP Tables and API Access: Key Tables, SQL and Integration OptionsKey QAD ERP tables such as pt_mstr and so_mstr, how to query them via OpenEdge SQL, and which API options exist for integration. Read-only guidance.
- QAD ERP Software Implementation: Steps, Environments and Knowledge BaseQAD ERP implementation phases, what the test, development and production environments are for, and where to find QAD knowledge base and documentation.
- AI for Epicor 9 and Vantage on Progress OpenEdge: A Private ArchitectureAdd a private AI assistant to Epicor 9 or Vantage on Progress OpenEdge: SQL-92 read path, replication, local LLM, permissions and honest limits.
AI on your ERP
- AI for QAD Adaptive ERP in automotive and industrial manufacturingAdd AI to QAD Adaptive ERP or Enterprise Edition for automotive and industrial manufacturing, grounded on QXtend and QAD's API layer, on-prem or private cloud.
- AI for QAD in Automotive: Schedules, Traceability and IATF Evidence From Your Own OpenEdge DataPrivate AI on QAD Adaptive ERP for automotive suppliers: schedule releases, ASN, lot traceability and IATF 16949 evidence, read-only, on-prem or sovereign.
Integrations
- How to add AI agents to QAD Adaptive ERPBuild AI agents on QAD Adaptive ERP: a tool layer over QXtend and read-only OpenEdge access, MRP exception triage, PO expediting and human approval before writes.
- How to build an MCP server for QAD Adaptive ERPDesign a Model Context Protocol server for QAD: which read-only tools to expose, OpenEdge and QXtend access, auth, transports and audit for Claude and ChatGPT.