Manufacturing & OperationsGlossary

What Is Asset Criticality Analysis?

Also known as: criticality ranking, equipment criticality, asset criticality assessment

Definition

An asset criticality assessment (asset criticality analysis) ranks equipment by the consequence of its failure, scoring safety, production loss, quality, environmental impact and repair cost, so maintenance effort, monitoring and spares go to the assets that matter most.

Asset Criticality Analysis Explained

The method assigns each asset a score against a set of consequence criteria and often a likelihood factor. A common result is an A, B, C ranking: A assets are those whose failure harms safety or stops a bottleneck, C assets are low consequence and can be run to failure. Scores are agreed by operations, maintenance and engineering together, not by maintenance alone.

A usable scheme is simple. For example, scoring from 1 to 5 on safety, production, quality and cost, then combining them to a rank. Over-detailed schemes tend to be abandoned. Redundancy matters: a pump with an installed standby is less critical than a single pump feeding the same process.

The rank is stored on the asset record in the CMMS or EAM, as a criticality field or class. It then drives decisions: PM frequency, which assets get condition monitoring, which spares are stocked, work order priority defaults and which equipment goes through RCM first. In SAP the ABC indicator on equipment or functional location is one commonly used place for it.

Criticality changes with the plant. A machine that becomes the sole source for a customer program becomes more critical. The ranking should be reviewed when production flow, redundancy or customer commitments change.

Why It Matters

  • Concentrates limited maintenance labor and budget on assets with the highest consequences.
  • Justifies spares and monitoring investments with a documented rationale.
  • Supports work order prioritization, so urgent jobs on critical assets are not queued behind minor requests.
  • Provides the starting list for RCM and predictive maintenance programs.

In Practice

A machine shop ranks 220 assets on safety, throughput and quality impact. Thirty-one come out as A, including the only five-axis mill that makes a customer's controlled part. These get shorter PM intervals, vibration monitoring and a stocked spindle spare. Eighty assets rank C, mostly bench equipment with redundancy, and move to run-to-failure with no scheduled PM.

Frequently Asked Questions

How do you carry out an asset criticality assessment?

1. Build a clean asset list with hierarchy. 2. Agree consequence criteria, for example safety, environment, production, quality and repair cost, each scored 1 to 5. 3. Add a likelihood or redundancy factor if wanted. 4. Score assets in a workshop with operations, maintenance and engineering. 5. Combine scores into A, B and C classes. 6. Store the class on the asset record in the CMMS or EAM and use it to set PM frequency, spares, monitoring and work order priority. 7. Review it when production flow or redundancy changes.

How is asset criticality different from ABC inventory analysis?

ABC inventory analysis ranks items by annual usage value. Asset criticality ranks equipment by the consequence of failure. They use similar letters but measure different things.

Who should set the criticality scores?

A group of operations, maintenance and engineering staff, since each sees different consequences. Maintenance alone tends to rank everything highly.

Where is criticality stored?

As a field or classification on the asset record in the CMMS or EAM, so reports, work order priorities and PM rules can read it.

Working with Asset Criticality Analysis in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

SAP PM Equipment Criticality Ranking Worksheet

Open full tool

Score each equipment item for consequence and likelihood, get a weighted criticality percentage, and use it to assign an ABC indicator in SAP PM.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring