What Is Cost of Poor Quality (COPQ)?
Also known as: COPQ, cost of quality, COQ, quality costs
Definition
Cost of poor quality (COPQ) is the total cost caused by products or services not being right the first time: internal failure (scrap, rework), external failure (returns, warranty, recalls), and often appraisal and prevention spend in the full cost of quality model.
Cost of Poor Quality (COPQ) Explained
The classic cost of quality model, associated with Feigenbaum and Juran, has four categories. Prevention costs (training, FMEA, process design) and appraisal costs (inspection, testing, calibration, audits) are spent to avoid defects. Internal failure costs (scrap, rework, re-inspection, downtime) occur before shipment. External failure costs (returns, warranty, field service, liability, lost customers) occur after shipment. COPQ usually means the two failure categories.
Counting it is the hard part. Scrap value shows up in the general ledger, but rework labor, expediting, extra setups, line stoppages, customer penalties and reputation rarely have their own accounts. Many plants find the visible scrap line is a minority of the true figure. Six Sigma teams often quote COPQ as a percent of sales, with the common claim that poorly performing operations spend a large share of revenue on it, but real values vary widely by industry and should be measured, not assumed.
The economics change the investment case. A defect found in incoming inspection costs a few dollars, the same defect found in final assembly costs hours, and found at the customer costs a return, a corrective action and potentially a contract. This is the reasoning behind prevention spending such as poka-yoke and SPC.
Capturing it needs reason codes in the ERP. Scrap transactions, rework operations and return material authorisations should all carry coded reasons, cost roll-ups and links to the item, work centre and supplier. SyteLine and LN can book scrap and rework against jobs and report variance, and a quality cost report that joins those with warranty claims gives a real COPQ number.
Why It Matters
- It converts quality problems into a financial figure leadership can prioritise against other projects.
- It exposes hidden factory cost, such as rework labor and expediting, that standard cost variances bury.
- The category split shows whether to invest in prevention or in better detection.
- A tracked COPQ trend verifies whether CAPA and improvement projects actually paid back.
In Practice
A plant reports 90,000 dollars a quarter of scrap. A full COPQ study adds 140 hours of rework at 55 dollars an hour, 30 hours of line downtime from rejected lots at 400 dollars an hour, 25,000 dollars of customer returns and 12,000 dollars of expedited freight. Total COPQ is about 146,700 dollars, roughly 1.6 times the scrap line, which changes which projects get funded.
Frequently Asked Questions
What are the four categories of cost of quality?
Prevention, appraisal, internal failure and external failure. COPQ usually refers to the two failure categories.
How do you calculate COPQ?
Add scrap, rework, re-inspection, downtime, returns, warranty, expediting and penalties attributable to defects, using coded transactions and labor and machine rates.
Is COPQ the same as cost of quality?
Not exactly. Cost of quality includes prevention and appraisal spend too. COPQ is the failure cost portion, the waste that better quality would remove.
Why is COPQ often underestimated?
Because hidden costs like rework hours, extra setups, expedites and lost customers are not booked to a quality account and need deliberate tracking.
Related Terms
Scrap Rate
Scrap rate is the percentage of production output discarded as unusable because it cannot be economically reworked to specification, calculated as scrapped units divided by total units produced over a defined period.
Rework
Rework is action taken on nonconforming product to bring it into full conformance with the original specification. It differs from repair, which makes product acceptable for use without meeting the original requirement.
First Pass Yield
First pass yield is the percentage of units that complete a process correctly the first time, without rework, repair, or retest. Units that eventually pass after rework are excluded, so the metric captures hidden factory loss.
Six Sigma
Six Sigma is a data-driven improvement methodology that reduces process variation and defects using statistical analysis, targeting a capability level of 3.4 defects per million opportunities, typically executed through the five-phase DMAIC cycle.
Poka-Yoke
Poka-yoke is a mistake-proofing technique that designs a process or fixture so a human error either cannot occur at all or is detected immediately, before it becomes a defect passed to the next operation.
Go Deeper
Scrap Rate Cost Calculator
Turn your scrap percentage into an annual dollar figure - including labor and overhead absorbed by scrapped units - and see what each point of improvement is worth.
Free ToolWarranty Cost Calculator
Compute your total annual warranty spend including administration, benchmark it against the 1-2% of revenue norm, and size the savings from reducing claims.
SyteLine Quality Cost Tracking Setup
Configure SyteLine cost of quality tracking for prevention, appraisal, and failure costs. Set up quality cost reporting and COQ dashboards in CloudSuite Industrial.
SyteLine Quality Management System Setup
Configure the SyteLine Quality Management System module for manufacturing compliance. Set up inspection plans, NCR tracking, and CAPA workflows in CloudSuite.
Working with Cost of Poor Quality (COPQ) in a live environment? Our engineers do this every day - and our AI agents automate most of it.
Try it here, free
Medical Device Cost of Poor Quality Calculator
Totals prevention, appraisal, internal failure and external failure costs and shows COPQ as a share of revenue.
Keep exploring
Free tools
- Medical Device Cost of Poor Quality CalculatorTotals prevention, appraisal, internal failure and external failure costs and shows COPQ as a share of revenue.
- Poor Master Data Quality Cost CalculatorEstimate the annual cost of master data errors from rework time, expediting and stewardship, and see how it scales with error rate.
- Cost of Quality (COQ) CalculatorAdd up prevention, appraisal, internal failure, and external failure costs to see your total COQ, its share of revenue, and your gap to world-class performance.