ERP Core ConceptsGlossary

What Is Goods Receipt (GRN)?

Also known as: GRN, goods received note, PO receipt, receiving, item receipt

Definition

A goods receipt, also called a goods received note (GRN), is the transaction that records material arriving against a purchase order. It increases inventory, updates open PO quantities, and usually creates an accrual until the supplier invoice is matched.

Goods Receipt (GRN) Explained

At the dock, receiving checks the delivery against the PO: item, quantity, condition, lot or serial numbers and sometimes certificates. The goods receipt then posts in the ERP. Stock rises in the receiving or inspection location, the open quantity on the PO line drops, and the system books the value as received but not yet invoiced.

SAP posts goods receipts with movement type 101 in MIGO. NetSuite records an Item Receipt created from the PO. Infor SyteLine records receipts in PO receiving, and Infor LN uses warehouse receipt processing tied to inbound orders. Odoo validates the receipt picking created from the PO. In every case the receipt links back to the PO line so the later invoice can be matched.

Receipts can be full, partial or over-delivery within tolerance. Quality-controlled items may go to a quarantine or inspection status first and move to available stock only after they pass. Lot and serial capture at this point is what makes later traceability possible.

Because the receipt is the trigger for the accrual and for the quantity side of three-way match, errors here are expensive. A wrong item, quantity or unit of measure at receipt flows into inventory value, supply and payments.

Why It Matters

  • It makes purchased material visible to planning and production the moment it arrives.
  • It creates the received-not-invoiced accrual that keeps the books accurate between delivery and invoice.
  • It is the quantity evidence used in three-way match before paying the supplier.
  • It is the best point to capture lot, serial and certification data for traceability.

In Practice

A PO line is for 1,000 pieces. The truck delivers 600, and receiving posts a partial receipt of 600 into the inspection location. The PO line shows 400 open, the accrual covers 600 at the PO price, and 20 rejected pieces are returned to the vendor later, which reduces the received quantity before the invoice is matched.

Frequently Asked Questions

What is a goods receipt?

A goods receipt is the ERP transaction, and often the paper or electronic goods received note (GRN), that confirms ordered material has physically arrived. It references the purchase order line, records the quantity and condition received, increases inventory, reduces the open PO quantity and creates a received-not-invoiced (GR/IR) accrual until the supplier invoice is matched.

What are the steps in the goods receipt process?

1) The delivery arrives with a packing slip or advance shipping notice. 2) Receiving identifies the PO and checks item, quantity, unit of measure and visible condition. 3) Lot, serial and certificate data are captured. 4) The goods receipt is posted, for example movement type 101 in SAP MIGO, an Item Receipt in NetSuite, or PO receiving in SyteLine. 5) Stock lands in inspection or available status depending on quality settings. 6) Labels are printed and material is put away. 7) The receipt later supports three-way match when the invoice arrives.

What is the difference between a goods receipt and an invoice receipt?

A goods receipt records the physical arrival of material. An invoice receipt records the supplier's bill. Matching the two against the PO is called three-way match.

Can you receive more than the purchase order quantity?

Often within a set tolerance. Beyond it the ERP may block the receipt or require the PO to be revised, depending on configuration.

What happens to a goods receipt when material is rejected?

It is typically reversed or posted as a return to vendor, and the PO quantity reopens. Practices vary by ERP and quality procedure.

Working with Goods Receipt (GRN) in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

SAP MIGO Goods Receipt Checklist

Open full tool

Step by step checklist to post a clean goods receipt against a purchase order in MIGO, with critical checks flagged.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations