How to automate email into Infor XA
Short answer
Read the shared inbox, extract structured data from the message and attachments, validate it against XA masters, and stage a draft order or acknowledgement for a person to release. Staging tables and a controlled import program keep bad data out of the live files.
At many XA shops, customer orders still arrive as email attachments to a shared mailbox, and someone retypes them into the order entry screen. Supplier acknowledgements and shipping notices do the same. The work is slow, error-prone and dependent on one or two people who know the customers.
Email automation here is less about AI magic than about careful plumbing. You need mailbox access, a parser that handles PDFs, spreadsheets and plain text, validation against item and customer masters, and an entry path into XA that does not bypass its rules.
A language model helps most with the messy part: free-text emails, varied PO layouts and ambiguous part references. The rest is deterministic and should stay that way.
What teams use it for
Customer PO intake
Extract customer, PO number, lines, quantities, prices and dates, match them to XA customer and item numbers and stage a draft order.
RFQ capture
Turn a quote request email into a structured request with parts, quantities and needed-by dates for estimating to price.
Supplier acknowledgements
Match a supplier's confirmation to open PO lines and propose promise-date updates instead of retyping them.
Shipping notices from carriers and vendors
Parse ASN emails and update expected receipt data for inbound planning.
Order change requests
Recognise reschedule or cancel emails, locate the order and queue a change proposal for the order desk.
Customer service triage
Classify status questions and route them to a drafted answer pulled from order data for the rep to approve.
Infor XA (on IBM i) integration surface
- Db2 for i is the place to land staged data. Create staging tables for order headers, lines and exceptions that are separate from live XA files.
- Order entry should go through a supported XA path. Depending on release and local configuration this may be a batch or interface file import, an API layer, or an RPG wrapper around standard order entry programs. Confirm with your partner which applies.
- Master data lookups against customer, ship-to, item, and customer-part cross-reference tables via read-only views. Names differ by release and mod.
- The IBM i can send mail through SMTP, and spool files or IFS stream files can be attached, which helps with outbound replies.
- For inbound, use Microsoft 365 Graph or IMAP on a service outside the IBM i. Reading mail on the IBM i itself is possible but rarely worth it.
How it works
- 1
Scope message types
Pick one inbox and one message type, typically customer POs. Gather fifty real examples to see how many formats you have.
- 2
Connect to the mailbox
Use Graph API with application permissions limited to one shared mailbox, or IMAP with a dedicated account. Do not use a person's mailbox.
- 3
Extract content
Pull the body, convert PDFs and spreadsheets to text or tables, and fall back to OCR for scanned attachments. Keep the original file.
- 4
Structure and validate
Have a model or rules fill a fixed schema, then validate customer, item, UOM, price and date against XA data. Score each field.
- 5
Stage and review
Insert the result into staging tables with the confidence per field. Show the reviewer the email next to the draft and the differences from standard price.
- 6
Release into XA
On approval, a controlled import program creates the order using the standard rules, returns the XA order number and the service replies to the sender if you choose.
Example flows
PDF purchase order from a repeat customer
Trigger: An email with a PDF PO arrives in the orders mailbox.
- The service extracts the PO and identifies the customer from the sender and header.
- It maps customer part numbers to XA items using the cross-reference.
- A price check flags two lines differing from the contract price.
- A reviewer fixes the flagged lines and releases the draft.
Result: An order is entered in minutes, with the price mismatch caught before it ships.
Supplier promises a new date
Trigger: A supplier replies that two lines will ship a week late.
- The service finds the PO number and lines in the reply.
- It compares the new dates to the production requirement.
- It proposes a promise-date change and flags the lines that now cause a shortage.
Result: The buyer sees impact before accepting the new date.
Keeping data on-prem
Run the whole pipeline inside your network if mail content is sensitive: a service on an internal server reads the mailbox, an OCR engine and open-weight language model run on your GPUs, and only the staging tables touch the IBM i. If you use Microsoft 365 the mail itself sits in the cloud, but the extraction and model calls do not need to leave. That matters for customers whose POs include controlled drawings or part data. Keep attachments and extracted text in your own storage and apply the same retention rules as the order record.
Security checklist
- Use a dedicated service mailbox or application permission scoped to a single mailbox.
- Treat email content as untrusted input. Prompt injection inside a PDF must not be able to trigger any XA action.
- Never auto-release orders above a value or from a new sender. Require human review at first.
- Keep the original email and attachment linked to the XA order for audit.
- Run virus scanning on attachments before any parsing.
Ways to get it done
Rules and templates per customer
Effort: Two to four weeks per format family, plus maintenance.
A handful of large customers whose PO layouts rarely change.
Model-based extraction built in-house
Effort: Typically six to twelve weeks to a reviewed pilot.
Many varied layouts and a team that can manage prompts, evaluation and staging.
Netray with your XA partner
Effort: A pilot on one inbox, then expand by message type.
You want on-prem extraction, an XA-specific staging and import design, and a measured rollout.
Pitfalls
- !Customer part numbers and units of measure do not match XA items on the first pass. Build the cross-reference before you build the AI.
- !Auto-creating orders without a staging step turns extraction errors into shipped errors.
- !Quoted-reply chains make the newest message hard to identify. Extract the top message and keep the thread as context.
- !Skipping tests on edge cases such as multi-page POs, blanket orders and partial cancellations.
- !Counting accuracy by field instead of by order hides the fact that one wrong line can ruin an order.
Frequently asked questions
Can this create orders in XA without a person?
It can for low-risk, repeat patterns once accuracy is proven. Start with review on every order, then allow auto-release only for known customers, known items and prices that match the contract.
How do emails get into the XA order entry process?
Through a supported import or API path on your release, or a wrapper that calls standard order entry logic. The staging table approach lets you test the validation before any live file is touched.
Do we need Microsoft 365 for this?
No. IMAP works with most providers. Microsoft Graph is cleaner for shared mailboxes in Microsoft 365, but the extraction and XA side are the same.
What about attachments that are scanned images?
Use OCR before extraction and give low-confidence fields to the reviewer. See the XA document OCR page for thresholds and layouts that help.
Is a language model required?
No. Fixed layouts are fine with rules. A model earns its place when formats vary or emails are free text. When you use one, validate its output against XA data and keep it on your own hardware if the content is sensitive.
Want Email automation working on your Infor XA (on IBM i)?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
Infor XA AI Assistant Sizing and Value Calculator
Size the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor XA users.
New to Infor XA? Start with the Infor XA guide and toolkit.
Keep exploring
Free tools
- Infor XA AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor XA users.
- IBM i Commands for Infor XA Administrators ReferenceA lookup of common IBM i CL commands for jobs, output, libraries, objects, data and backups, with what each is for.
- Infor XA Private AI Layer Blueprint GeneratorFill in your Infor XA version, database, hosting and use cases and get a shareable architecture plan for a private AI layer.
ERP fixes and how-tos
- How to add a private AI layer to Infor XA on-premReference architecture to add AI to Infor XA on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
- Infor XA REST API: expose XA through IBM i Integrated Web Services or IONHow to expose Infor XA (MAPICS) data and functions as REST on IBM i using Integrated Web Services or ION, with an example call and the safety rules for writes.
- Infor XA costing: cost types, roll-up and standard cost setupHow product costing works in Infor XA (MAPICS): standard versus current cost, how roll-up builds cost from BOM and routing, setup order, and common pitfalls.
Guides
- Enterprise AI Email Automation: Triage, Drafting, and RoutingAI email automation for the enterprise: what to automate first, how triage and drafting differ in risk, and the metrics that show real time savings.
- AI Order Entry for Label and Packaging ConvertersAutomating customer PO and spec intake for label and packaging converters: matching items and artwork, catching mismatches, and keeping a human in the loop.
- Sales Order Automation for Manufacturers: From Emailed PO to ERP in MinutesSales order automation for manufacturers: AI reads emailed POs, validates pricing and parts, and enters clean orders into SyteLine, LN, or M3 in minutes.
AI on your ERP
- AI for Infor XA on IBM i: On-Prem, No Replatforming RequiredAdd AI to Infor XA on IBM i (AS/400) without a migration project. Read DB2 for i directly, ground answers in live XA data, keep everything on-prem.
- AI Sales Order Entry Automation for NetSuite: Emailed POs, PDFs and Shopify OrdersAutomate NetSuite sales order entry with AI: read emailed and PDF POs, match customer part numbers, check prices, and handle Shopify order exceptions.
Integrations
- How to automate email into SAP S/4HANATurn inbound POs, RFQs, invoices and order confirmations from shared inboxes into SAP S/4HANA transactions with review, using OData APIs and SAPconnect.
- How to automate email into Infor LNAutomate inbound purchase orders, RFQs, invoices and supplier confirmations from shared mailboxes into Infor LN with ION, review queues and safe write-back.