AI & Automation3 min readNetray Engineering Team

AI for Optics Manufacturers: Yield, Rework and RFQ Triage

Short answer

The most useful AI for an optics manufacturer is narrow and tied to its own data: analysing yield and rework patterns across jobs, triaging incoming RFQs by fit and risk, drafting quotes from similar past work and answering planner questions about coating and metrology queues. It works best when it reads ERP records, travelers and instrument files and runs inside the shop's network. This guide covers four realistic uses, what they need and where they are not worth the effort.

Yield and Rework Analysis

Most optics shops collect scrap and rework data but rarely analyse it across jobs. An AI layer over the ERP can answer questions like which materials and tolerance classes lose the most pieces, which operation produces the most late scrap, and whether yield changed after a process or supplier change. The value is speed: the analyst asks a question in plain language and sees the query and the result, rather than waiting for a custom report.

The data must be coded well, because AI cannot infer reasons that nobody recorded.

RFQ Triage

Optics shops receive requests that range from catalog-like windows to unproven aspheres. AI can read the request, extract the key specs and flag fit: materials you do not process, tolerances beyond your history, export-control indicators or unusually short lead times. It can also surface similar past jobs and the quoted-versus-actual result.

A person decides whether to quote, but the first pass takes minutes and the estimator spends time on the bids worth pursuing.

  • Fit check against processes, materials and equipment
  • Tolerance check against historical capability
  • Export-control and customer-restriction flags
  • Similar past jobs and their actual margin

Coating and Metrology Queue Questions

Planners spend time answering questions such as which jobs are ready for the next coating run, what is waiting on the interferometer and which orders will miss their dates. An assistant connected to open orders and routings can answer these with the underlying records. It does not replace the planner, but it removes a lot of manual lookup and spreadsheet reconciliation.

Try it here, free

Manufacturing AI Readiness Assessment

Open full tool

Score your manufacturing operation's readiness for AI across data, systems, people, and governance, and get a prioritized roadmap for closing the gaps.

Keeping It Private and Controlled

Optics data includes customer prints, process recipes, coating designs and sometimes export-controlled technical data. Running open-weight models on your own GPUs, with retrieval over ERP data and documents, keeps this inside your boundary. Netray builds this pattern with read-only ERP access, shown queries and human approval on any write-back.

The customer owns its compliance program, and the architecture should support it with role-based access and logging.

When It Is Not Worth Doing

If your data is mostly on paper, if scrap is not recorded or if you make a handful of repeat parts, AI will not fix the underlying gaps. Start by cleaning up reason codes, travelers and job history. A simpler dashboard or a monthly review may deliver more value than a model, and the vendor's built-in reporting is often enough for basic questions.

Frequently asked questions

How can AI be used in optics manufacturing?

Practical uses include extracting specs from RFQs and drawings, drafting quotes from similar past jobs, analysing yield and rework by material and tolerance, answering planner questions about queues and assembling inspection records. These work best on your own ERP and quality data rather than generic models.

Does AI replace optical engineers or estimators?

No. It reduces searching and retyping, but decisions about feasibility, price, process and conformance remain with qualified people. The best results come when estimators and engineers review a grounded draft rather than start from a blank page.

What data do I need before starting?

Reasonably clean job history with operations, hours and scrap reasons, coded part attributes such as material and tolerance class, and accessible documents like prints and inspection files. If these are missing, fix recording first, since AI cannot recover information that was never captured.

If you want to see what your own yield and quoting data can answer, ask Netray for a scoped, on-prem pilot over your ERP and a sample of inspection files.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring