Photonics Lot Yield and Test Results SQL Query Generator
This generator produces three SQL queries that most photonics and electronics quality teams need every week: first-pass yield by lot, fallout by test step, and a defect Pareto. You type in your own table and column names, copy the SQL, and run it against a read replica of your MES, test database or ERP quality tables.
Fill in
One row per unit per test step
Values assumed to be PASS or FAIL
1. First-pass yield by lot
-- Units whose FIRST recorded result per step was PASS across all steps
SELECT
lot_number AS lot,
COUNT(DISTINCT serial_number) AS units_tested,
COUNT(DISTINCT CASE WHEN result = 'FAIL' THEN serial_number END) AS units_with_a_fail,
100.0 * (COUNT(DISTINCT serial_number)
- COUNT(DISTINCT CASE WHEN result = 'FAIL' THEN serial_number END))
/ NULLIF(COUNT(DISTINCT serial_number), 0) AS first_pass_yield_pct
FROM test_results
WHERE tested_at >= '2026-09-01'
AND tested_at < DATEADD(day, 1, '2026-09-30')
GROUP BY lot_number
ORDER BY first_pass_yield_pct ASC;
2. Fallout by test step
SELECT
test_step AS test_step,
COUNT(*) AS tests_run,
SUM(CASE WHEN result = 'FAIL' THEN 1 ELSE 0 END) AS fails,
100.0 * SUM(CASE WHEN result = 'FAIL' THEN 1 ELSE 0 END)
/ NULLIF(COUNT(*), 0) AS fail_rate_pct
FROM test_results
WHERE tested_at >= '2026-09-01'
AND tested_at < DATEADD(day, 1, '2026-09-30')
GROUP BY test_step
ORDER BY fails DESC;
3. Defect Pareto with cumulative percent
WITH d AS (
SELECT defect_code AS defect, COUNT(*) AS n
FROM test_results
WHERE result = 'FAIL'
AND defect_code IS NOT NULL
AND tested_at >= '2026-09-01'
AND tested_at < DATEADD(day, 1, '2026-09-30')
GROUP BY defect_code
)
SELECT
defect,
n,
100.0 * n / SUM(n) OVER () AS pct,
100.0 * SUM(n) OVER (ORDER BY n DESC ROWS UNBOUNDED PRECEDING) / SUM(n) OVER () AS cumulative_pct
FROM d
ORDER BY n DESC;
Table and column names here are generic placeholders, not a specific ERP or MES schema, so map them to your own. DATEADD and the window syntax shown are SQL Server style, so adapt date functions for Oracle, PostgreSQL or MySQL. First-pass yield here counts a unit as failed if any recorded fail exists, so retests should be flagged with an attempt column if you need strict first-attempt logic. Run on a read-only replica first.
Yield reporting on your ERP data
Want yield, fallout and Pareto answers straight from your own ERP and test data? Tell us about your systems and we will outline options. Optional.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the name of the table that holds one row per unit per test step, then the lot, serial, step, result, defect and date columns. Set the date window and copy each query. The queries assume results are stored as PASS or FAIL text, so edit the comparison values if your system uses codes. Always run new SQL on a reporting copy or with read-only credentials before pointing it at production.
- Use a read-only database account
- Map generic column names to your schema
- Adapt DATEADD and window functions to your database
- Add a product or part filter for large databases
What the three queries tell you
First-pass yield by lot ranks lots from worst to best so you can see which builds need investigation. Fallout by test step shows where in the flow the losses occur, such as power, spectrum, alignment or leak test for modules. The defect Pareto puts failures in order with a cumulative percentage, which usually shows that three or four codes drive most of the loss, and tells you where to focus corrective action.
First-pass yield and rolled throughput
First-pass yield is units passing with no rework or retest divided by units started. Rolled throughput yield multiplies the first-pass yield of each step, so a flow with five steps at 95 percent each yields about 77 percent, not 95. If your database logs attempts, extend the queries with an attempt number and count only attempt one, so retests do not hide true process loss.
Common mistakes
Counting rows instead of distinct units inflates fallout when a unit is tested several times. Mixing different part numbers in one yield figure hides product-specific problems. Excluding scrapped units that never reached final test makes yield look better than it is. Make sure date filters use the test date, not the lot creation date, and document your yield definition so reports compare like with like.
Frequently Asked Questions
Will these queries work on my ERP or MES schema?
They use generic names, so you must map the table and column names to your own schema. The logic works with any database that stores one test result per unit and step. Date and window functions may need adjusting for Oracle, PostgreSQL or MySQL.
How is first-pass yield calculated here?
A unit counts as a failure if any FAIL result exists for it in the date window, and yield is units without a fail divided by distinct units tested. If you retest failures, add an attempt column and count only first attempts for a stricter definition.
Is it safe to run generated SQL on production?
The queries only read data, but heavy aggregations can slow a busy system. Run them on a replica or during quiet hours, with a read-only account and a limited date range. Review the SQL before execution, as you would any script.
Why do I need a defect Pareto?
A Pareto ranks defect causes by count, with a cumulative percentage line. It usually shows that a small number of causes create most of the loss, so you can put corrective actions where they pay back most, rather than spreading effort across every defect code.
If you want these yield and fallout questions answered in plain language directly from your ERP, MES and test data, we can build a private, read-only assistant on your own infrastructure. Reach out to discuss it.
Related Tools
Gaussian Beam Spot Size and Rayleigh Range Python Generator
Fill in laser wavelength, M-squared, focal length and input beam diameter to generate a ready-to-run Python script for focused spot size and depth of focus.
Safety & WorkforceLaser Safety Eyewear Selection and Inspection Checklist
Work through selection, labelling, inspection and storage checks for laser protective eyewear used in manufacturing and test areas.
Industry TemplatesOptical Power dBm to mW and Insertion Loss Calculator
Enter input and output optical power in mW to get dBm values, insertion loss in dB, percent transmission and the result of cascading identical stages.
Compliance & ContractsOptical and Laser Standards Reference Guide
Find which ISO, IEC, ANSI and MIL standard covers optical drawings, coatings, beam measurement, damage threshold and laser safety.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- Inspection Results SQL Query GeneratorFill in your own inspection table and column names to generate SQL for lot reject rate by supplier and top failing characteristics.
- Semiconductor Lot Yield and Bin Pareto SQL GeneratorFill in your table and column names to get ready-to-run SQL for weekly yield, bin Pareto and lowest-yield lots.
- Fiber Optic Test Results SQL Schema and Pass/Fail Query GeneratorCreates a table for insertion loss and return loss results and queries that find failures and yield by wavelength.
Guides
- AI for Optics Manufacturers: Yield, Rework and RFQ TriagePractical AI uses for optics and photonics makers: yield analysis, rework patterns, RFQ triage and coating queues, run privately over ERP data.
- ERP for Optics Manufacturers: What a Lens and Coating Shop Actually NeedsWhat an ERP must handle for optics makers: blank lot tracking, rework loops, coating batches, yield costing, metrology records and export-controlled parts.
- Optics Job Costing: Why Quoted Margin and Actual Margin DivergeWhy optics shops lose margin between quote and actual: hidden rework, yield, coating reruns, metrology time and tooling. How to cost jobs honestly.