ERP4 min readNetray Engineering Team

IPC-A-610 Class 2 vs Class 3: How It Affects Your PCBA Quote

Short answer

IPC-A-610 defines acceptance criteria for electronic assemblies in three classes, and the class on the customer's drawing changes what you inspect, what you can ship, and what the job costs. Class 2 covers dedicated service products where extended life and reliable performance are required, while Class 3 covers high performance or harsh environment products where downtime is not tolerated, such as aerospace, defense, and life support. Quote Class 3 as a different job: tighter acceptance criteria drive more inspection, more rework, more documentation, and more scrap.

What the Classes Mean in Practice

IPC-A-610 is a visual acceptance standard, and the same solder joint can be acceptable at Class 2 and a defect at Class 3. Class 3 typically requires tighter limits on items such as solder fill in plated through-holes, wetting and fillet formation, component placement offset, lead protrusion, and damage allowances. IPC J-STD-001 is the companion workmanship and process requirements standard, and customers often cite both.

Read the drawing notes carefully, since a customer may specify a class, an amendment, or only a general reference to IPC workmanship. If the class is unspecified, many shops default to Class 2 and state that assumption on the quote so there is no later dispute.

Where Class 3 Adds Cost

Extra cost shows up in several places. Inspection takes longer because more conditions are rejectable, and operators need current certification for IPC-A-610 and J-STD-001 at the correct class. First pass yield usually falls, so rework and scrap rise, and rework on Class 3 assemblies may have documentation requirements.

Through-hole barrel fill requirements can push you toward better process control or selective solder tuning, and may require cross-section evidence. Material controls tighten, with traceability to lot and date code expected. Customers at this level also tend to request first article reports, certificates of conformance, and detailed records, each of which takes labor to prepare and retain.

  • More inspection time per board, often with magnification and a stricter AOI profile
  • Lower first pass yield, so higher rework and scrap allowance
  • Certified operators and inspectors at the required class
  • Documentation: CoC, first article, traceability records

Rework, Touch-Up and Process Limits

Rework limits are often overlooked at quoting. Many Class 3 customers restrict the number of rework cycles on a pad or joint, require rework to follow IPC-7711/7721 procedures, and may prohibit certain repairs altogether. If your quote assumes a rework allowance that the customer's rules would forbid, you will scrap boards you expected to repair.

Process choices matter too: no-clean versus water-soluble flux, cleaning and ionic contamination testing, conformal coating, and staking can all be specified. Build these into the labor model as explicit steps rather than hiding them in a general adder.

Try it here, free

IPC Class Selector (Class 1, 2, or 3)

Open full tool

Answer 8 questions about failure consequence, environment, and service life to see whether your product needs IPC Class 1, 2, or 3.

How to Price It and Protect Yourself

Price by building a Class 3 labor and yield model from your own data. Pull first pass yield and rework rates from past Class 3 or comparable jobs rather than reusing Class 2 assumptions. Add inspection and documentation time as separate lines.

State the class, standard revision, and any amendments on the quote, and note exclusions such as no customer-specified deviations unless agreed. If a customer wants Class 3 on a board designed with Class 2 land patterns or tight geometries, say so early, since you may not be able to achieve the required fill or fillet. Clear language on the quote is cheaper than negotiating after boards are built.

When It Is Worth Pursuing Class 3 Work

Class 3 work can be rewarding, but it suits shops with trained staff, process control, and an appetite for documentation. If your inspectors are not certified, your process capability data is thin, or your customers are mostly consumer and industrial, chasing Class 3 can strain the shop. Netray can help by querying your ERP and quality records for yield, rework, and cost by job class, so pricing rests on your actual history.

That analysis only works if jobs are tagged with the class requirement, so add that field before you need it.

Frequently asked questions

Does Class 3 always cost more than Class 2?

Usually, because inspection is stricter, first pass yield tends to be lower, and documentation expectations are higher. The difference depends on the design, your process capability, and the customer's other requirements. Price it from your own yield and rework data on comparable jobs rather than applying a flat percentage.

What is the difference between IPC-A-610 and J-STD-001?

IPC-A-610 is the acceptability standard for electronic assemblies, a visual guide to what is acceptable. J-STD-001 sets requirements for soldered electrical and electronic assemblies, covering materials, methods, and process controls. Customers commonly require both, and personnel may need certification to each at the specified class.

What if the drawing does not state an IPC class?

Ask the customer. If they do not answer in time, many shops quote to Class 2 and state that assumption explicitly on the quote, along with the standard revision. This avoids a dispute later and gives the customer a clear prompt to correct it if the product actually requires Class 3.

Tag your jobs with IPC class, then ask Netray to compare yield, rework, and actual cost by class so your next Class 3 quote rests on real data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs